integraded safety and security assurance

Industry Day
LATAM Airlines Group - Brasil
25/ 2014
INTEGRADED SAFETY AND SECURITY ASSURANCE
Daniel Ramalho Guillaumon
Safety Assurance Manager
Agenda
•
•
•
•
•
IMS
Hazard Identification Processes
Risk Management
Safety Assurance Processes
Difficulties
Integraded Management System
Performance
Health
Processes
Behavior
Procedure
Occupational
Safety
Security
Quality
Safety Condition
Ground
Safety
Flight
Safety
Safety Promotion
Safety and Security
Assurance
Risk Management
Policy and Objectives
SMS Pillars
SMS
IMS Structure
Decision Make
Senior
Manage
r
Management
Hazard Identification Processes
Hazard Identification Processes
Internal Source
• ASR;
• FDM – Flight Data Monitor;
• Investigation;
• LOSA;
• Audits, Inspections and Surveillance.
External Source
• Accident Reports;
• Industry ;
• External Audits.
Investigation Report
Risk Management
Acceptable Risks
Risks to be
mitigate and
monitor
Not
Acceptab
le Risks
Integrated Safety and Security Assurance
Accountable in charge
Risk Management
Hazard
Identification
Mitigation
by due
date
Changing
Process
Managament
Risk
Assessment
Committees
Risk
Monitor
Implementing
Correctives
Actions
What event can be measure?
Flight Operations
EGPWS
Warning
Unlawful
Interference
Hight Rate of descent
above 2000 fts
Emergency
Runway
Excursion
RTO above
100 kts
low fuel
TCAS RA or
TA Warning
unestablished
approach
Scape Slide
deployment
What event can be measure?
Ground Operations
Dangerous Goods
acceptance errors
Ground
Damage
Efetividade errônea de
componente na aeronave
Vehicle collision
pre-flight
interferences
Return of flight by
technical problem
Unlawful Event
Aircraft loading error
Dispatches errors
Dangerous
Goods leaks
FOD at
ramp area
What can be measure?
Six Sigma – Failure Index
Variability Index
Performance
≥6σ
100%
≥5σe<6σ
99,99994%
≥4σe<5σ
99,9937%
≥3σe<4σ
99,73%
≥2σe<3σ
99,45%
≥1σe<2σ
68%
<1σ
0%
What can be measure?
MADE
Performance =
TARGET
Management
Lower Level
•
50% - Station work Performance Average base on Six Sigma;
•
20% - ASR investigation commitment;
•
30% - Comply with all recommendations and correctives action.
Upper level
•
50% - Lower Level Performance Average;
•
50% - Comply with all recommendations and correctives action.
What can be measure?
Corporate
Example of Score
SPI
10 %
ASR Culture
20 %
Labor Accident Index
10 %
Serious Incident
10 %
Incident
25 %
Management Performance
25 %
Safety and Security Operational Performance
Operational Structure
CORPORATE
ESTRATEGIC
TATIC
MANAGEMENT
FLIGH
OPERATIONS
GROUND
OPERATIONS
TER CGO
MNT
TER CGO
MNT
N
L
TER CGO
MNT
SEC
AER RMP
SEC
I
TER CGO
SEC
MNT
AER RMP
AER RMP
TER
MNT
AER
CGO
B
RMP
OPERATION
B
SEC
A
TER
MNT
CAB
FLT
G
AER RMP
AER
CGO
E
RMP
SEC
SEC
Data base integration
WORKFLOW
DATA SOURCES
INPUT
DATA PROCESS
Data Base - BI
Integration
Data
Process
Manual
Input
Consolidation
Structure
Staging
Area
CONSOLIDATION
Datas
Legacy
Data Input
Essbase
REPORTS AND MONITOR
Reports
Conclusion
Measurable
Big Events
Management
Efficiency
Training
ASR Culture
Operational Safety
Commitment Level
Operational Events
ORG
Management
Operation
Decisões
Estratégicas
Meritocracy
Non punitive
policy
Operational Discipline
Thank you
Any questions?
Daniel Ramalho Guillaumon
Safety Assurance Manager
[email protected]