Cagayan De Oro

AT IO
N
N
T OF TR
A
N
OR T
A
SP
D
IC
AT
TM
EN
CO M M U N
IO N
S DEP
AR
Republic of the Philippines
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
DEPARTMENT OF TRANSPORTATION
AND COMMUNICATIONS
P
6
CISTERN TANK
1HP WATER PUMP
PRESSURIZED TANK
5
3T
5T
3T
3T
(agency logo)
5T
PRE DEPARTURE
AREA
ELEC. TOILET
PHILIPPINE
AIRLINE
OFFICE
VIP
4
VIP
LOUNGE
SEE TO ENGINEER'S DETAIL
(SANITARY)
WATER LINE
BREAST FEEDING
ROOM
PHILIPPINE
AIRLINE
PLAY PEN
3
AIR
PHILIPPINES
2 HP
WALL
EXHAUST DUCT OUTLET
CHECK-IN COUNTER
AREA
CAA. 10. CR. T1. D1. W1. L1. 1.
X-RAY
MACHINE
STO. ROOM
WATER LINE
FROM SOURCE
1 HP WATER PUMP
ARRIVAL AREA
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF TRANSPORTATION AND COMMUNICATIONS
CAA. 10. CR. T1. A1. N1. L1. 2.
CAA. 10. CR. T1. A1. N1. L1. 1. 0.
CIVIL AVIATION AUTHORITY OF THE PHILIPPINES
TOILET
CEBU PACIFIC
ASG OFFICE
CAA. 10. CR. T1. D1. W1. L1. 2. 0.
82 GALS. CAPACITY
PRESSURIZED TANK
PROJECT NAME :
TOILET
5T
2
5T
TOILET
LOBBY
CAA. 10. CR. T1. D1. S1. L1. 1. 0.
X-RAY
MACHINE
EXISTING OFFICE
TOILET
CONSTRUCTION/RENOVATIONS
OF TOILET FACILITIES FOR CAAP
20AT CIRCUIT BREAKER
EXHAUST DUCT OUTLET
EXISTING OFFICE
(CAA. 10. CR. T1. A1. N1. L1. 2. ), ( CAA. 10. CR. T1. A1. N1. L1. 1. 0.)
(CAA. 10. CR. T1. D1. S1. L1. 1. 0. ), ( CAA. 10. CR. T1. D1. S1. L1. 2.)
(CAA. 10. CR. T1. D1. W1. L1. 1. ), ( CAA. 10. CR. T1. D1. W1. L1. 2. 0.)
3T
CSU OFFICE
CAA. 10. CR. T1. D1. S1. L1. 2.
1
ENTRANCE
1 HP
1.5 HP
LOCATION :
CAGAYAN DE ORO AIRPORT
Region X - Lumbia, Cagayan De Oro City
PROPOSED TERMINAL PLAN
SCALE
PLAN OF WATER PUMP AND PRESSURE TANK ASSEMBLY
Prepared by:
NTS
HERMINIANO R. HUELGAS
1:125 mts
Acting Division Chief III
Infrastructure Development and Design Division
Submitted by:
EDGARDO L. COSTES
Assistant Director General II, ADMS
Recommending Approval:
82 GALS. CAPACITY
PRESSURIZED TANK
GUILLERMO L. LEONARDO
GV
GV
CV
1 HP WATER
PUMP
3
4"
DIA. GI PIPE
(to toilets)
FROM SOURCE
EXHAUST FAN LAYOUT PLAN (TYPE I)
O.I.C-Assistant Secretary for
Project Management
GV
3
4"
DIA. OVERFLOW PIPE
(to existing drain)
NTS
Approved:
ATTY. EFREN C. MONCUPA
Undersecretary for Project
Implementation and Special Concerns
DET. OF WATER PUMP & PRESSURE PUMP ASSEMBLY
NTS
EXHAUST FAN LAYOUT PLAN (TYPE I)
NTS
Sheet Content:
PROPOSED TERMINAL PLAN
PLAN OF WATER PUMP AND PRESSURE
TANK ASSEMBLY
DETAIL OF WATER PUMP AND
PRESSURE TANK ASSEMBLY
EXHAUST FAN LAYOUT PLAN (TYPE I & TYPE II)
Sheet No.:
M
1
3
TS
-
R TA T ION
AR
D
E
F
G
H
J
I
K
L
M
N
O
S DE P
C
ION
B
AT
A
IC
TM
EN
COM M U N
T OF TR
ND
A
PO
A
NS
Republic of the Philippines
P
DEPARTMENT OF TRANSPORTATION
AND COMMUNICATIONS
6
5
3T
5T
3T
3T
5T
PRE DEPARTURE
AREA
ELEC. TOILET
PHILIPPINE
AIRLINE
OFFICE
VIP
4
BREAST FEEDING
ROOM
PROJECT NAME :
VIP
LOUNGE
CAAP
ADMIN OFFICE
3
ARRIVAL AREA
AIR
PHILIPPINES
PHILIPPINE
AIRLINE
PLAY PEN
CONSTRUCTION/RENOVATIONS
OF TOILET FACILITIES
CAA. 10. CR. T1. D1. W1. L1. 1.
CAA. 10. CR. T1. D1. W1. L1. 2. 0.
CAA. 10. CR. T1. D1. S1. L1. 1. 0.
CAA. 10. CR. T1. D1. S1. L1. 2.
CAA. 10. CR. T1. A1. N1. L1. 2.
CAA. 10. CR. T1. A1. N1. L1. 1. 0.
2 HP
WALL
TOILET
TOILET
CHECK-IN COUNTER
AREA
TOILET
CEBU PACIFIC
TOILET
X-RAY
MACHINE
TOILET
ASG OFFICE
TOILET
TOILET
LOCATION :
5T
2
DOOR CLOSE
DOOR CLOSE
CAGAYAN DE ORO AIRPORT
5T
TOILET
LOBBY
Region X - Lumbia, Cagayan De Oro City
X-RAY
MACHINE
X-RAY
MACHINE
X-RAY
MACHINE
TOILET
3T
CSU OFFICE
Prepared by:
1
1 HP
ENTRANCE
1.5 HP
HERMINIANO R. HUELGAS
Acting Division Chief III,
Infrastructure Development and Design Division
PROPOSED FLOOR PLAN
SCALE
Submitted by:
NTS
EDGARDO L. COSTES
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
Assistant Director General II,
Aerodrome Development and Management Division
P
Recommending Approval:
6
GUILLERMO L. LEONARDO
5
3T
5T
3T
3T
ELEC. TOILET
O.I.C-Assistant Secretary for
Project Management
5T
PRE DEPARTURE
AREA
PHILIPPINE
AIRLINE
OFFICE
VIP
VIP
LOUNGE
4
BREAST FEEDING
ROOM
PHILIPPINE
AIRLINE
PLAY PEN
3
ARRIVAL AREA
AIR
PHILIPPINES
2 HP
WALL
CAA. 10. CR. T1. A1. N1. L1. 2.
CAA. 10. CR. T1. D1. W1. L1. 1.
CHECK-IN COUNTER
AREA
TOILET
CEBU PACIFIC
CAA. 10. CR. T1. A1. N1. L1. 1. 0.
X-RAY
MACHINE
STO. ROOM
2
ASG OFFICE
CAA. 10. CR. T1. D1. 5TW1. L1. 2. 0.
TOILET
Approved:
5T
TOILET
LOBBY
X-RAY
MACHINE
CAA. 10. CR. T1. D1. S1. L1. 1. 0.
EXISTING OFFICE
TOILET
EXISTING OFFICE
3T
CSU OFFICE
CAA. 10. CR. T1. D1. S1. L1. 2.
1
ENTRANCE
1 HP
1.5 HP
ATTY. EFREN C. MONCUPA
Undersecretary for Project
Implementation and Special Concerns
Sheet Content:
PROPOSED FLOOR PLAN
SCALE
FEXISTING FLOOR PLAN
PROPOSED FLOOR PLAN
NTS
Sheet No.:
A
-
TS
-
0.90m
T OF TR
A
0.20m
N
0.20m
AT
IO N
S DEP
0.20m
IC
TM
EN
1.80m
CO M M U N
0.90m
AT IO
D
0.20m
OR T
N
0.20m
SP
A
N
4.40m
AR
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
0.20m
A
DEPARTMENT OF TRANSPORTATION
AND COMMUNICATIONS
1.00m
1.40m
Republic of the Philippines
6
PLAN
(agency logo)
FROM SOURCE
PLAN OF SEPTIC VAULT
5
3T
5T
3T
ELEC. TOILET
CISTERN TANK
3T
5T
PRE DEPARTURE
AREA
PHILIPPINE
AIRLINE
OFFICE
VIP
PRESSURIZED TANK
4
VIP
LOUNGE
1:30 mts
SCALE
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF TRANSPORTATION AND COMMUNICATIONS
WATER LINE
2 HP
WALL
CHECK-IN COUNTER
AREA
CAA. 10. CR. T1. D1. W1. L1. 1.
SEPTIC VAULT 1
X-RAY
MACHINE
STO. ROOM
ARRIVAL AREA
CAA. 10. CR. T1. A1. N1. L1. 2.
CAA. 10. CR. T1. A1. N1. L1. 1. 0.
CEBU PACIFIC
ASG OFFICE
CAA. 10. CR. T1. D1. W1. L1. 2. 0.
TOILET
PROJECT NAME :
0.34m
3
AIR
PHILIPPINES
0.10m
PHILIPPINE
AIRLINE
PLAY PEN
WATER LINE
CIVIL AVIATION AUTHORITY OF THE PHILIPPINES
BREAST FEEDING
ROOM
CONSTRUCTION/RENOVATIONS
OF TOILET FACILITIES FOR CAAP
TOILET
(CAA. 10. CR. T1. A1. N1. L1. 2. ), ( CAA. 10. CR. T1. A1. N1. L1. 1. 0.)
(CAA. 10. CR. T1. D1. S1. L1. 1. 0. ), ( CAA. 10. CR. T1. D1. S1. L1. 2.)
(CAA. 10. CR. T1. D1. W1. L1. 1. ), ( CAA. 10. CR. T1. D1. W1. L1. 2. 0.)
5T
TOILET
LOBBY
CAA. 10. CR. T1. D1. S1. L1. 1. 0.
X-RAY
MACHINE
EXISTING OFFICE
TOILET
SEWER LINE
SEPTIC VAULT 2
EXISTING OFFICE
0.30m
5T
2
AIR SPACE
AIR SPACE
AIR SPACE
WATER LEVEL
WATER LEVEL
CSU OFFICE
LOCATION :
WATER LEVEL
3T
CAA. 10. CR. T1. D1. S1. L1. 2.
1
1 HP
1.5 HP
CAGAYAN DE ORO AIRPORT
1.00m
ENTRANCE
Region X - Lumbia, Cagayan De Oro City
SECONDARY
COMPARTMENT
TERTIARY
COMPARTMENT
Prepared by:
0.15m
INLET
COMPARTMENT
HERMINIANO R. HUELGAS
SECTION
Acting Division Chief III
Infrastructure Development and Design Division
PROPOSED TERMINAL PLAN
SCALE
SECTION OF SEPTIC VAULT
1:125 mts
Submitted by:
1:30 mts
SCALE
EDGARDO L. COSTES
Assistant Director General II, ADMS
Recommending Approval:
SPECIFICATION:
1. THE LOCATION OF SEPTIC VAULT/ PRESSURIZED TANK SHALL BE MORE THAN 3.0 METERS AWAY FROM
THE BUILDING LINE.
GUILLERMO L. LEONARDO
O.I.C-Assistant Secretary for
Project Management
82 GALS. CAPACITY
PRESSURIZED TANK
2. THE DISTANCE OF SEPTIC VAULT FROM PROPOSED CISTERN SHALL BE 15 METERS AWAY.
3. WATER PIPE LINE AND SEWER LINE RUNNING PARALLEL IN DIRECTION SHALL HAVE A MINIMUM DISTANCE
IN SEPARATION OF 0.50 METER AND AVOID INSTALLING WATER LINE BELOW SEWER LINE.
4. THE STANDARD PLUMBING PLANS (COLD WATER LINE AND SEWER LINE) SHALL RE-CONFIGURATED AND
SHALL REVISED DEFENDING ON THE ORIENTATION OF TOILET PLANS.
GV
1 HP WATER
PUMP
GV
FROM SOURCE
GV
CV
3
4"
MH
DIA. GI PIPE (to toilets)
3
4" DIA. OVERFLOW PIPE
(to existing drain)
5. THE CONSTRUCTION SHALL BE SUPERVISED BY A LICENSE PLUMBER AND SHALL BE COVERED BY NATIONAL
PLUMBING CODE OF THE PHILIPPINES.
1.5m x 2.0m x
1.5m(depth)
concrete underground
reservoir (4.50 cu.m.)
12mm dia. bars spcd @ 0.20m
o.c. b.w. (top & bottom)
Approved:
ATTY. EFREN C. MONCUPA
Undersecretary for Project
Implementation and Special Concerns
Sheet Content:
SECTION OF CISTERN TANK
PROPOSED TERMINAL PLAN
SECTION OF CISTERN TANK
PLAN OF SEPTIC VAULT
SECTION OF SEPTIC VAULT
SPECIFICATION
NTS
Sheet No.:
P
1
3
TS
-