AT IO N N T OF TR A N OR T A SP D IC AT TM EN CO M M U N IO N S DEP AR Republic of the Philippines A B C D E F G H I J K L M N O DEPARTMENT OF TRANSPORTATION AND COMMUNICATIONS P 6 CISTERN TANK 1HP WATER PUMP PRESSURIZED TANK 5 3T 5T 3T 3T (agency logo) 5T PRE DEPARTURE AREA ELEC. TOILET PHILIPPINE AIRLINE OFFICE VIP 4 VIP LOUNGE SEE TO ENGINEER'S DETAIL (SANITARY) WATER LINE BREAST FEEDING ROOM PHILIPPINE AIRLINE PLAY PEN 3 AIR PHILIPPINES 2 HP WALL EXHAUST DUCT OUTLET CHECK-IN COUNTER AREA CAA. 10. CR. T1. D1. W1. L1. 1. X-RAY MACHINE STO. ROOM WATER LINE FROM SOURCE 1 HP WATER PUMP ARRIVAL AREA REPUBLIC OF THE PHILIPPINES DEPARTMENT OF TRANSPORTATION AND COMMUNICATIONS CAA. 10. CR. T1. A1. N1. L1. 2. CAA. 10. CR. T1. A1. N1. L1. 1. 0. CIVIL AVIATION AUTHORITY OF THE PHILIPPINES TOILET CEBU PACIFIC ASG OFFICE CAA. 10. CR. T1. D1. W1. L1. 2. 0. 82 GALS. CAPACITY PRESSURIZED TANK PROJECT NAME : TOILET 5T 2 5T TOILET LOBBY CAA. 10. CR. T1. D1. S1. L1. 1. 0. X-RAY MACHINE EXISTING OFFICE TOILET CONSTRUCTION/RENOVATIONS OF TOILET FACILITIES FOR CAAP 20AT CIRCUIT BREAKER EXHAUST DUCT OUTLET EXISTING OFFICE (CAA. 10. CR. T1. A1. N1. L1. 2. ), ( CAA. 10. CR. T1. A1. N1. L1. 1. 0.) (CAA. 10. CR. T1. D1. S1. L1. 1. 0. ), ( CAA. 10. CR. T1. D1. S1. L1. 2.) (CAA. 10. CR. T1. D1. W1. L1. 1. ), ( CAA. 10. CR. T1. D1. W1. L1. 2. 0.) 3T CSU OFFICE CAA. 10. CR. T1. D1. S1. L1. 2. 1 ENTRANCE 1 HP 1.5 HP LOCATION : CAGAYAN DE ORO AIRPORT Region X - Lumbia, Cagayan De Oro City PROPOSED TERMINAL PLAN SCALE PLAN OF WATER PUMP AND PRESSURE TANK ASSEMBLY Prepared by: NTS HERMINIANO R. HUELGAS 1:125 mts Acting Division Chief III Infrastructure Development and Design Division Submitted by: EDGARDO L. COSTES Assistant Director General II, ADMS Recommending Approval: 82 GALS. CAPACITY PRESSURIZED TANK GUILLERMO L. LEONARDO GV GV CV 1 HP WATER PUMP 3 4" DIA. GI PIPE (to toilets) FROM SOURCE EXHAUST FAN LAYOUT PLAN (TYPE I) O.I.C-Assistant Secretary for Project Management GV 3 4" DIA. OVERFLOW PIPE (to existing drain) NTS Approved: ATTY. EFREN C. MONCUPA Undersecretary for Project Implementation and Special Concerns DET. OF WATER PUMP & PRESSURE PUMP ASSEMBLY NTS EXHAUST FAN LAYOUT PLAN (TYPE I) NTS Sheet Content: PROPOSED TERMINAL PLAN PLAN OF WATER PUMP AND PRESSURE TANK ASSEMBLY DETAIL OF WATER PUMP AND PRESSURE TANK ASSEMBLY EXHAUST FAN LAYOUT PLAN (TYPE I & TYPE II) Sheet No.: M 1 3 TS - R TA T ION AR D E F G H J I K L M N O S DE P C ION B AT A IC TM EN COM M U N T OF TR ND A PO A NS Republic of the Philippines P DEPARTMENT OF TRANSPORTATION AND COMMUNICATIONS 6 5 3T 5T 3T 3T 5T PRE DEPARTURE AREA ELEC. TOILET PHILIPPINE AIRLINE OFFICE VIP 4 BREAST FEEDING ROOM PROJECT NAME : VIP LOUNGE CAAP ADMIN OFFICE 3 ARRIVAL AREA AIR PHILIPPINES PHILIPPINE AIRLINE PLAY PEN CONSTRUCTION/RENOVATIONS OF TOILET FACILITIES CAA. 10. CR. T1. D1. W1. L1. 1. CAA. 10. CR. T1. D1. W1. L1. 2. 0. CAA. 10. CR. T1. D1. S1. L1. 1. 0. CAA. 10. CR. T1. D1. S1. L1. 2. CAA. 10. CR. T1. A1. N1. L1. 2. CAA. 10. CR. T1. A1. N1. L1. 1. 0. 2 HP WALL TOILET TOILET CHECK-IN COUNTER AREA TOILET CEBU PACIFIC TOILET X-RAY MACHINE TOILET ASG OFFICE TOILET TOILET LOCATION : 5T 2 DOOR CLOSE DOOR CLOSE CAGAYAN DE ORO AIRPORT 5T TOILET LOBBY Region X - Lumbia, Cagayan De Oro City X-RAY MACHINE X-RAY MACHINE X-RAY MACHINE TOILET 3T CSU OFFICE Prepared by: 1 1 HP ENTRANCE 1.5 HP HERMINIANO R. HUELGAS Acting Division Chief III, Infrastructure Development and Design Division PROPOSED FLOOR PLAN SCALE Submitted by: NTS EDGARDO L. COSTES A B C D E F G H I J K L M N O Assistant Director General II, Aerodrome Development and Management Division P Recommending Approval: 6 GUILLERMO L. LEONARDO 5 3T 5T 3T 3T ELEC. TOILET O.I.C-Assistant Secretary for Project Management 5T PRE DEPARTURE AREA PHILIPPINE AIRLINE OFFICE VIP VIP LOUNGE 4 BREAST FEEDING ROOM PHILIPPINE AIRLINE PLAY PEN 3 ARRIVAL AREA AIR PHILIPPINES 2 HP WALL CAA. 10. CR. T1. A1. N1. L1. 2. CAA. 10. CR. T1. D1. W1. L1. 1. CHECK-IN COUNTER AREA TOILET CEBU PACIFIC CAA. 10. CR. T1. A1. N1. L1. 1. 0. X-RAY MACHINE STO. ROOM 2 ASG OFFICE CAA. 10. CR. T1. D1. 5TW1. L1. 2. 0. TOILET Approved: 5T TOILET LOBBY X-RAY MACHINE CAA. 10. CR. T1. D1. S1. L1. 1. 0. EXISTING OFFICE TOILET EXISTING OFFICE 3T CSU OFFICE CAA. 10. CR. T1. D1. S1. L1. 2. 1 ENTRANCE 1 HP 1.5 HP ATTY. EFREN C. MONCUPA Undersecretary for Project Implementation and Special Concerns Sheet Content: PROPOSED FLOOR PLAN SCALE FEXISTING FLOOR PLAN PROPOSED FLOOR PLAN NTS Sheet No.: A - TS - 0.90m T OF TR A 0.20m N 0.20m AT IO N S DEP 0.20m IC TM EN 1.80m CO M M U N 0.90m AT IO D 0.20m OR T N 0.20m SP A N 4.40m AR B C D E F G H I J K L M N O P 0.20m A DEPARTMENT OF TRANSPORTATION AND COMMUNICATIONS 1.00m 1.40m Republic of the Philippines 6 PLAN (agency logo) FROM SOURCE PLAN OF SEPTIC VAULT 5 3T 5T 3T ELEC. TOILET CISTERN TANK 3T 5T PRE DEPARTURE AREA PHILIPPINE AIRLINE OFFICE VIP PRESSURIZED TANK 4 VIP LOUNGE 1:30 mts SCALE REPUBLIC OF THE PHILIPPINES DEPARTMENT OF TRANSPORTATION AND COMMUNICATIONS WATER LINE 2 HP WALL CHECK-IN COUNTER AREA CAA. 10. CR. T1. D1. W1. L1. 1. SEPTIC VAULT 1 X-RAY MACHINE STO. ROOM ARRIVAL AREA CAA. 10. CR. T1. A1. N1. L1. 2. CAA. 10. CR. T1. A1. N1. L1. 1. 0. CEBU PACIFIC ASG OFFICE CAA. 10. CR. T1. D1. W1. L1. 2. 0. TOILET PROJECT NAME : 0.34m 3 AIR PHILIPPINES 0.10m PHILIPPINE AIRLINE PLAY PEN WATER LINE CIVIL AVIATION AUTHORITY OF THE PHILIPPINES BREAST FEEDING ROOM CONSTRUCTION/RENOVATIONS OF TOILET FACILITIES FOR CAAP TOILET (CAA. 10. CR. T1. A1. N1. L1. 2. ), ( CAA. 10. CR. T1. A1. N1. L1. 1. 0.) (CAA. 10. CR. T1. D1. S1. L1. 1. 0. ), ( CAA. 10. CR. T1. D1. S1. L1. 2.) (CAA. 10. CR. T1. D1. W1. L1. 1. ), ( CAA. 10. CR. T1. D1. W1. L1. 2. 0.) 5T TOILET LOBBY CAA. 10. CR. T1. D1. S1. L1. 1. 0. X-RAY MACHINE EXISTING OFFICE TOILET SEWER LINE SEPTIC VAULT 2 EXISTING OFFICE 0.30m 5T 2 AIR SPACE AIR SPACE AIR SPACE WATER LEVEL WATER LEVEL CSU OFFICE LOCATION : WATER LEVEL 3T CAA. 10. CR. T1. D1. S1. L1. 2. 1 1 HP 1.5 HP CAGAYAN DE ORO AIRPORT 1.00m ENTRANCE Region X - Lumbia, Cagayan De Oro City SECONDARY COMPARTMENT TERTIARY COMPARTMENT Prepared by: 0.15m INLET COMPARTMENT HERMINIANO R. HUELGAS SECTION Acting Division Chief III Infrastructure Development and Design Division PROPOSED TERMINAL PLAN SCALE SECTION OF SEPTIC VAULT 1:125 mts Submitted by: 1:30 mts SCALE EDGARDO L. COSTES Assistant Director General II, ADMS Recommending Approval: SPECIFICATION: 1. THE LOCATION OF SEPTIC VAULT/ PRESSURIZED TANK SHALL BE MORE THAN 3.0 METERS AWAY FROM THE BUILDING LINE. GUILLERMO L. LEONARDO O.I.C-Assistant Secretary for Project Management 82 GALS. CAPACITY PRESSURIZED TANK 2. THE DISTANCE OF SEPTIC VAULT FROM PROPOSED CISTERN SHALL BE 15 METERS AWAY. 3. WATER PIPE LINE AND SEWER LINE RUNNING PARALLEL IN DIRECTION SHALL HAVE A MINIMUM DISTANCE IN SEPARATION OF 0.50 METER AND AVOID INSTALLING WATER LINE BELOW SEWER LINE. 4. THE STANDARD PLUMBING PLANS (COLD WATER LINE AND SEWER LINE) SHALL RE-CONFIGURATED AND SHALL REVISED DEFENDING ON THE ORIENTATION OF TOILET PLANS. GV 1 HP WATER PUMP GV FROM SOURCE GV CV 3 4" MH DIA. GI PIPE (to toilets) 3 4" DIA. OVERFLOW PIPE (to existing drain) 5. THE CONSTRUCTION SHALL BE SUPERVISED BY A LICENSE PLUMBER AND SHALL BE COVERED BY NATIONAL PLUMBING CODE OF THE PHILIPPINES. 1.5m x 2.0m x 1.5m(depth) concrete underground reservoir (4.50 cu.m.) 12mm dia. bars spcd @ 0.20m o.c. b.w. (top & bottom) Approved: ATTY. EFREN C. MONCUPA Undersecretary for Project Implementation and Special Concerns Sheet Content: SECTION OF CISTERN TANK PROPOSED TERMINAL PLAN SECTION OF CISTERN TANK PLAN OF SEPTIC VAULT SECTION OF SEPTIC VAULT SPECIFICATION NTS Sheet No.: P 1 3 TS -
© Copyright 2025 ExpyDoc