Plant
RAJGHAT
RAJGHAT Total
BADARPUR
BADARPUR Total
PANIPAT
PANIPAT Total
RGTPP (HISSAR)
Date
Sub-Subsidiary Mode
NCL
Rail
CCL
ECL
Rail
Rail
BCCL
CCL
NCL
WCL
Rail
Rail
Rail
Rail
Road
ECL
NCL
MCL\IB
Rail
Rail
Rail
RGTPP (HISSAR) Total
IGTPP (JHAJJAR)
ECL
NCL
MCL\IB
IGTPP (JHAJJAR) Total
MGTPP JHAJJAR
CCL
Rail
Rail
Rail
Rail
Road
ECL
Rail
NCL
Rail
SECL\Korba
Rail
SECL\Korea-Rewa
Rail
MGTPP JHAJJAR Total
YAMUNANAGAR
CCL
Rail
YAMUNANAGAR Total
LEHRA MOHABBAT CCL
Rail
LEHRA MOHABBAT Total
ROPAR
BCCL
Rail
CCL
Rail
CCL-Wsh
Washery
WCL
Rail
SECL\Korba
Rail
SECL\Korea-Rewa
Rail
RD/RL
SECL\Korba-WshWashery
ROPAR Total
BHATINDA
CCL
Rail
January 7, 2015
on date
Sum of Daily DESP
000Ts
Monthly Progressive
0.0
0.00
3.82
0.00
3.82
3.53
0.00
0.00
0.00
0.00
3.53
3.77
0.00
3.77
7.54
3.77
0.00
3.64
7.41
0.00
2.63
0.00
0.00
0.00
0.00
2.63
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.77
Sum of MTD DESP 000Ts
0.00
0.00
30.32
15.16
45.48
38.68
41.63
0.00
18.94
0.00
99.25
18.76
23.99
14.95
57.70
29.68
23.65
22.36
75.69
11.31
16.29
14.91
0.00
0.00
0.00
42.51
3.82
3.82
3.82
3.82
0.00
3.82
22.37
0.00
0.00
0.00
0.00
15.53
41.73
3.77
POWER HOUSE WISE
DESPATCH
Provisional
Fig in '000 tes
Plant
BHATINDA Total
NABHA POWER
Sub-Subsidiary Mode
SECL\Korea-Rewa
RD/RL
SECL\Korba-WshWashery
NABHA POWER Total
KOTA
NCL
Rail
SECL\Korba
RD/RL
SECL\Korea-Rewa
Rail
RD/RL
SECL\Korba-WshWashery
KOTA Total
SURATGARH
NCL
Rail
SECL\Korea-Rewa
Rail
RD/RL
SECL\Korba-WshWashery
SURATGARH Total
CHHABRA
SECL\Korba
Rail
SECL\Korea-Rewa
Rail
RD/RL
SECL\Korba-WshWashery
CHHABRA Total
ANPARA
NCL
MGR
Rail
ANPARA Total
HARDUAGANJ
BCCL
Rail
CCL
Rail
OBRA
NCL
Rail
OBRA Total
PANKI
BCCL
Rail
CCL
Rail
PANKI Total
PARICHA
BCCL
Rail
CCL
Rail
NCL
Rail
WCL
Rail
PARICHA Total
DADRI
CCL
Rail
ECL
Rail
NCL
Rail
DADRI Total
RIHAND
ECL
Rail
Date
January 7, 2015
on date
Sum of Daily DESP
000Ts
3.77
0.00
14.14
14.14
0.00
12.89
0.00
0.00
0.00
12.89
0.00
0.00
0.00
0.00
0.00
3.73
0.00
0.00
5.33
9.06
6.45
7.20
13.65
0.00
0.00
11.94
11.94
0.00
0.00
0.00
10.51
0.00
3.92
0.00
14.43
15.18
14.95
0.00
30.13
3.77
Monthly Progressive
Sum of MTD DESP 000Ts
3.77
0.00
76.45
76.45
11.72
77.16
44.82
0.00
0.00
133.70
11.95
48.55
0.00
13.77
74.27
7.47
0.00
0.00
37.57
45.04
83.00
64.80
147.80
3.44
45.66
49.86
49.86
10.41
3.82
14.23
59.43
7.54
23.70
38.02
128.68
114.14
63.41
0.00
177.55
26.09
POWER HOUSE WISE
DESPATCH
Provisional
Fig in '000 tes
Date
Plant
Sub-Subsidiary Mode
RIHAND
NCL
MGR
Rail
RIHAND Total
SINGRAULI
NCL
MGR
Rail
CCL
ECL
Rail
Rail
BCCL
CCL
Rail
Rail
UNCHAHAR Total
ROSA
CCL
Rail
Road
ROSA Total
LANCO ANPARA C
NCL
MGR
Rail
Road
SINGRAULI Total
TANDA
TANDA Total
UNCHAHAR
LANCO ANPARA C Total
KORBA (E) EXP
SECL\Korba
Rail
KORBA (E) EXP Total
KORBA (E)
SECL\Korba
O/W
SECL\Korea-Rewa
O/W
Rail
KORBA (E) Total
KORBA (W)
SECL\Korba
Belt
SECL\Korea-Rewa
Belt
KORBA (W) Total
KORBA-STPS
SECL\Korba
MGR
SECL\Korea-Rewa
MGR
KORBA-STPS Total
SEEPAT
ECL
Rail
NCL
Rail
SECL\Korba
MGR
Rail
SECL\Korea-Rewa
MGR
Rail
SEEPAT Total
PATHADI (LANCO)
SECL\Korba
Rail
SECL\Korea-Rewa
Rail
January 7, 2015
on date
Sum of Daily DESP
000Ts
22.30
19.49
45.56
16.77
7.73
24.50
3.77
3.64
7.41
3.32
11.36
14.68
0.00
0.00
0.00
1.85
3.82
0.00
5.67
14.94
14.94
3.32
0.00
0.00
3.32
6.20
0.00
6.20
47.13
0.00
47.13
0.00
0.00
33.06
0.00
0.00
0.00
33.06
3.73
0.00
Monthly Progressive
Sum of MTD DESP 000Ts
192.55
80.92
299.56
107.90
80.50
188.40
49.27
14.78
64.05
20.84
79.85
111.87
37.91
0.00
37.91
13.15
26.83
50.00
89.98
78.43
78.43
33.02
0.00
0.00
33.02
93.43
0.00
93.43
287.84
0.00
287.84
11.31
0.00
225.64
3.73
0.00
0.00
240.68
14.94
0.00
POWER HOUSE WISE
DESPATCH
Provisional
Fig in '000 tes
Plant
Sub-Subsidiary Mode
PATHADI (LANCO) Total
BHILAI (NSPCL)
SECL\Korba
Rail
SECL\Korea-Rewa
Rail
BHILAI (NSPCL) Total
SIKKA
SECL\Korba
Rail
Road
SECL\Korea-Rewa
Rail
RD/RL
Road
SECL\Korba-WshRD/RL
SIKKA Total
GANDHINAGAR
WCL
Rail
SECL\Korba
Rail
SECL\Korea-Rewa
Rail
RD/RL
SECL\Korba-WshWashery
GANDHINAGAR Total
UKAI
WCL
Rail
Road
SECL\Korba
Rail
SECL\Korea-Rewa
Rail
RD/RL
SECL\Korba-WshWashery
Rail
SECL\Korea-Rewa
O/W
Rail
AMARKANTAK Total
S.GANDHI
SECL\Korba
Rail
SECL\Korea-Rewa
Rail
S.GANDHI Total
SARNI
WCL
Belt
Rail
Road
SARNI Total
VINDHYACHAL
ECL
Rail
NCL
MGR
Rail
VINDHYACHAL Total
JP IPP (Bina)
CCL
Rail
Road
Date
January 7, 2015
on date
Sum of Daily DESP
000Ts
3.73
3.73
0.00
3.73
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
15.17
15.17
0.00
0.00
0.00
0.00
0.00
18.26
0.00
0.00
0.00
0.00
11.20
0.00
11.20
0.13
3.83
0.00
3.96
3.71
27.38
7.47
38.56
0.00
0.00
Monthly Progressive
Sum of MTD DESP 000Ts
14.94
33.61
0.00
33.61
0.00
0.00
0.00
0.00
0.00
12.54
12.54
0.00
0.00
0.00
0.00
44.22
44.22
19.14
1.09
0.00
0.00
0.00
77.77
18.67
13.63
0.00
32.30
33.61
74.69
108.31
14.01
45.87
27.52
87.40
14.84
205.02
88.04
307.90
3.82
8.33
POWER HOUSE WISE
DESPATCH
Provisional
Fig in '000 tes
Plant
Sub-Subsidiary Mode
JP IPP (Bina)
SECL\Korba
Rail
SECL\Korea-Rewa
Rail
JP IPP (Bina) Total
SHRI SINGAJI KHANDWA
SECL\Korba
Rail
SECL\Korea-Rewa
Rail
SHRI SINGAJI KHANDWA Total
BHUSAWAL
WCL
Rail
Road
MCL\IB
Rail
BHUSAWAL Total
CHANDRAPUR
WCL
MGR
Rail
Road
WCL-Wsh
Rope
MCL\IB
Rail
SECL\Korba
Rail
SECL\Korea-Rewa
Rail
CHANDRAPUR Total
KHAPARKHEDA
WCL
Rail
Road
MCL\TALCHER Rail
MCL\IB
Rail
SECL\Korba
Rail
SECL\Korea-Rewa
Rail
RD/RL
SECL\Korba-WshWashery
KHAPARKHEDA Total
KORADIH
WCL
Rail
Rope
MCL\IB
Rail
SECL\Korba
Rail
SECL\Korea-Rewa
Rail
RD/RL
SECL\Korba-WshWashery
KORADIH Total
NASIK
WCL
Rail
Road
SECL\Korba
Rail
SECL\Korea-Rewa
Rail
NASIK Total
Date
January 7, 2015
on date
Sum of Daily DESP
000Ts
3.73
0.00
3.73
0.00
0.00
0.00
0.00
0.00
3.77
3.77
0.00
7.66
0.00
0.00
0.00
3.73
0.00
11.39
0.00
0.19
0.00
0.00
0.00
0.00
0.00
0.00
0.19
0.00
0.00
3.71
7.47
0.00
0.00
0.00
11.17
0.00
0.00
0.00
0.00
0.00
Monthly Progressive
Sum of MTD DESP 000Ts
11.20
0.00
23.36
26.14
0.00
26.14
0.00
0.00
14.95
14.95
6.63
92.80
1.09
37.80
19.11
14.94
0.00
172.36
19.14
8.08
14.95
45.50
26.14
0.00
0.00
0.00
113.81
0.00
7.71
15.15
22.41
11.20
0.00
0.00
56.47
7.72
0.00
0.00
11.20
18.93
POWER HOUSE WISE
DESPATCH
Provisional
Fig in '000 tes
Date
Plant
Sub-Subsidiary Mode
PARLI
WCL
WCL-Wsh
MCL\IB
Rail
Washery
Rail
WCL
WCL-Wsh
MCL\IB
Rail
Washery
Rail
PARLI Total
PARAS
PARAS Total
DAHANU
SECL\Korba
RD/RL
SECL\Korba-WshWashery
DAHANU Total
WARDHA WARORA WCL
WARDHA WARORA Total
Ideal Energy IPP (Bela)WCL
Ideal Energy IPP (Bela) Total
VIDARBHA IPP (Butibori)
WCL
VIDARBHA IPP (Butibori) Total
India Bulls IPP (Amaravati)
WCL
Road
Rail
Road
Rail
Road
Rail
Road
SECL\Korba
Rail
SECL\Korea-Rewa
Rail
India Bulls IPP (Amaravati) Total
EMCO IPP (Warora) SECL\Korba
Rail
SECL\Korea-Rewa
Rail
EMCO IPP (Warora) Total
MAUDA (NTPC)
ECL
Rail
WCL
Road
MCL\IB
Rail
SECL\Korba
Rail
SECL\Korea-Rewa
Rail
MAUDA (NTPC) Total
VIJAYAWADA
WCL
Rail
Road
MCL\TALCHER Rail
MCL\IB
Rail
VIJAYAWADA Total
KOTHAGUDEM
WCL
Rail
MCL\TALCHER Rail
January 7, 2015
on date
Sum of Daily DESP
000Ts
Monthly Progressive
Sum of MTD DESP 000Ts
3.83
0.00
0.00
3.83
0.00
0.00
0.00
0.00
0.00
4.45
4.45
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.73
0.00
3.73
7.47
0.00
7.47
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
42.37
0.00
7.67
50.04
34.58
0.00
7.61
42.19
0.00
47.86
47.86
5.64
5.64
0.00
0.00
0.00
0.00
10.55
10.55
0.00
0.00
29.88
0.00
29.88
52.29
0.00
52.29
0.00
0.00
0.00
0.00
0.00
0.00
0.00
11.20
74.30
15.34
100.83
0.00
0.00
POWER HOUSE WISE
DESPATCH
Provisional
Fig in '000 tes
Plant
Sub-Subsidiary Mode
KOTHAGUDEM Total
MUDDANUR
MCL\TALCHER-Wsh
Washery
MUDDANUR Total
RAMAGUNDAM STPS WCL
Rail
MCL\IB
Rail
SECL\Korba
Rail
SECL\Korea-Rewa
Rail
RAMAGUNDAM STPS Total
SIMHADRI
ECL
Rail
MCL\TALCHER Rail
MCL\IB
Rail
SECL\Korba
Rail
SECL\Korea-Rewa
Rail
SIMHADRI Total
RAICHUR
BCCL
Rail
WCL
Rail
Road
MCL\TALCHER Rail
Road
MCL\IB
Rail
RAICHUR Total
BELLARY
MCL\TALCHER Rail
BELLARY Total
ENNORE
ECL
Rail
MCL\TALCHER Rail
ENNORE Total
METTUR
ECL
Rail
MCL\TALCHER Rail
METTUR Total
METTUR EXP
MCL\TALCHER Rail
METTUR EXP Total
NORTH CHENNAI
ECL
Rail
MCL\TALCHER Rail
NORTH CHENNAI Total
TUTTICORIN
ECL
Rail
MCL\TALCHER Rail
MCL\IB
Rail
TUTTICORIN Total
VALLUR (TNECL)
MCL\TALCHER Rail
VALLUR (TNECL) Total
Date
January 7, 2015
on date
Sum of Daily DESP
000Ts
Monthly Progressive
Sum of MTD DESP 000Ts
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.77
0.00
0.00
0.00
3.77
0.00
3.83
0.78
0.00
0.00
0.00
4.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.77
3.77
0.00
0.00
0.00
0.00
0.00
0.00
0.00
14.40
14.40
0.00
0.00
7.47
0.00
7.47
26.41
66.43
18.27
0.00
0.00
111.10
0.00
41.78
22.77
52.85
0.00
0.00
117.39
65.66
65.66
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
129.74
129.74
0.00
0.00
33.74
33.74
26.20
26.20
POWER HOUSE WISE
DESPATCH
Provisional
Fig in '000 tes
Date
Plant
Sub-Subsidiary Mode
BARAUNI
BARAUNI Total
MUZAFFARPUR
ECL
Rail
BCCL
ECL
Rail
Rail
MUZAFFARPUR Total
KAHALGAON
ECL
KAHALGAON Total
PATRATU
PATRATU Total
TENUGHAT
TENUGHAT Total
BOKARO
BOKARO Total
CHANDRAPURA
NEC
MGR
Rail
Rail
CCL
Rail
CCL
Road
BCCL
CCL
Rail
Rail
Road
BCCL
Rail
Road
Rail
Road
CCL
CHANDRAPURA Total
MAITHON RB
BCCL
CCL
MAITHON RB Total
OPGC
OPGC Total
TALCHER
TALCHER Total
TALCHER STPS
MCL\IB
Rail
Road
Rail
Road
MGR
MCL\TALCHER Belt
Rail
ECL
Rail
MCL\TALCHER MGR
Rail
MCL\IB
Rail
SECL\Korba
Rail
SECL\Korea-Rewa
Rail
TALCHER STPS Total
STERLITE ENERGY
MCL\TALCHER Rail
January 7, 2015
on date
Sum of Daily DESP
000Ts
0.00
0.00
0.00
0.00
0.00
9.45
15.54
0.00
24.98
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.05
2.05
0.00
0.00
0.00
0.00
5.77
3.84
0.00
0.00
0.00
9.61
0.00
Monthly Progressive
Sum of MTD DESP 000Ts
0.00
0.00
3.49
7.58
11.07
108.06
102.16
0.00
210.22
18.95
18.95
11.08
11.08
0.00
7.64
2.82
10.47
27.28
0.00
19.06
15.32
61.66
0.00
0.00
0.00
8.86
8.86
20.44
20.44
12.95
18.72
31.67
0.00
155.91
135.72
0.00
0.00
0.00
291.63
19.05
POWER HOUSE WISE
DESPATCH
Provisional
Fig in '000 tes
Plant
Sub-Subsidiary Mode
STERLITE ENERGY
MCL\IB
STERLITE ENERGY Total
GMR IPP (Kamalanga) ECL
MCL\TALCHER
GMR IPP (Kamalanga) Total
KODERMA
BCCL
MCL\IB
KODERMA Total
DTPS(DVC)
BCCL
ECL
MCL\IB
DTPS(DVC) Total
MEJIA
MEJIA Total
BAKRESWAR
BAKRESWAR Total
BANDEL
BANDEL Total
DPL
DPL Total
KOLAGHAT
KOLAGHAT Total
SAGARDIGHI
Date
BCCL
Rail
Rail
Rail
Rail
Rail
Rail
Road
Rail
Rail
ECL
MCL\IB
Rail
Road
Rail
Rail
BCCL
ECL
MCL\TALCHER
MCL\IB
Rail
Rail
Rail
Rail
BCCL
ECL
MCL\IB
MCL\IB-Wsh
Rail
Rail
Road
Washery
BCCL
ECL
MCL\IB
Rail
Rail
Rail
Road
BCCL
ECL
MCL\TALCHER
MCL\IB
Rail
Rail
Rail
Rail
Road
BCCL
Rail
January 7, 2015
on date
Sum of Daily DESP
000Ts
3.64
3.64
3.64
0.00
3.64
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12.91
0.00
0.00
0.00
12.91
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.71
0.00
3.71
3.53
Monthly Progressive
Sum of MTD DESP 000Ts
18.85
37.90
7.32
11.05
18.37
20.48
15.15
35.63
0.00
0.00
7.58
7.48
15.06
118.09
0.00
25.44
15.15
158.68
17.62
0.00
0.00
34.13
51.75
0.00
0.00
0.00
7.67
7.67
0.00
0.00
0.00
0.00
0.00
21.06
3.34
14.82
21.97
0.00
61.19
7.02
POWER HOUSE WISE
DESPATCH
Provisional
Fig in '000 tes
Date
Plant
Sub-Subsidiary Mode
SAGARDIGHI
ECL
Rail
MCL\TALCHER Rail
MCL\IB
Rail
SAGARDIGHI Total
SANTALDIH
SANTALDIH Total
BUDGEBUDGE
BCCL
Rail
Road
ECL
Rail
MCL\TALCHER Rail
MCL\IB
Rail
BCCL
ECL
MCL\TALCHER
MCL\IB
BUDGEBUDGE Total
KOLKATA(CESC)
ECL
KOLKATA(CESC) Total
S.GEN
ECL
S.GEN Total
FARAKKA
BCCL
ECL
Rail
Rail
Rail
Rail
Rail
Rail
Rail
MGR
Rail
Rail
NEC
FARAKKA Total
TITAGARH
ECL
Rail
TITAGARH Total
DURGAPUR STEEL TPSBCCL
Rail
CCL
Rail
DURGAPUR STEEL TPS Total
KORBA
SECL\Korba
Rail
SECL\Korea-Rewa
Rail
KORBA Total
ADHUNIK POWER
CCL
Rail
Road
ADHUNIK POWER Total
BAJAJ HINDUSTAN IPPsCCL
Rail
Road
BAJAJ HINDUSTAN IPPs Total
BARH
ECL
Rail
NCL
Rail
January 7, 2015
on date
Sum of Daily DESP
000Ts
0.00
0.00
0.00
3.53
3.37
0.00
0.00
0.00
0.00
3.37
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12.65
18.72
0.00
31.37
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.77
3.71
7.48
3.77
7.76
Monthly Progressive
Sum of MTD DESP 000Ts
0.00
0.00
7.61
14.62
27.96
0.00
0.00
0.00
15.21
43.17
6.25
7.32
3.71
0.00
17.28
0.00
0.00
0.00
0.00
7.02
76.74
74.02
7.81
165.59
14.97
14.97
6.97
15.29
22.26
0.00
0.00
0.00
3.82
0.00
3.82
45.34
21.32
66.67
18.38
23.57
POWER HOUSE WISE
DESPATCH
Provisional
Fig in '000 tes
Plant
Sub-Subsidiary Mode
BARH
SECL\Korba
Rail
SECL\Korea-Rewa
Rail
BARH Total
DB Power
DB Power Total
KSK Mahanadi IPP
SECL\Korba
Rail
SECL\Korea-Rewa
Rail
SECL\Korba
Rail
SECL\Korea-Rewa
Rail
KSK Mahanadi IPP Total
PURTI SAKHAR IPP
WCL
Road
PURTI SAKHAR IPP Total
RAGHUNATHPUR
BCCL
Road
RAGHUNATHPUR Total
GVK
CCL
Road
GVK Total
HINDUJA
MCL\TALCHER Rail
HINDUJA Total
NLC
MCL\TALCHER Rail
NLC Total
BHILAI (NSPCL)
ECL
Rail
BHILAI (NSPCL) Total
PAINAMPURAM
MCL\TALCHER Rail
PAINAMPURAM Total
TALWANDI SABO
MCL\TALCHER Rail
MCL\IB
Rail
Road
TALWANDI SABO Total
ADANI (MUNDRA)
MCL\TALCHER Rail
MCL\IB
Rail
ADANI (MUNDRA) Total
Adani Power (Tiroda) IPP
WCL
Rail
SECL\Korba
Rail
SECL\Korea-Rewa
Rail
Adani Power (Tiroda) IPP Total
ANUPPUR
SECL\Korba
Rail
SECL\Korea-Rewa
Rail
ANUPPUR Total
Date
January 7, 2015
on date
Sum of Daily DESP
000Ts
0.00
0.00
11.53
0.00
0.00
0.00
7.47
0.00
7.47
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.73
0.00
3.73
3.73
0.00
3.73
627.35
Monthly Progressive
Sum of MTD DESP 000Ts
0.00
0.00
41.95
0.00
0.00
0.00
29.88
0.00
29.88
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.51
3.77
19.00
26.28
36.79
29.97
66.76
0.00
82.16
0.00
82.16
14.94
0.00
14.94
6604.05