RT – RAFTER TIES

RT – RAFTER TIES
These anchors tie trusses and rafters to top plates and may be used to
tie wood framing members to resist uplift and lateral forces.
Materials: See chart
Finish: G90 galvanizing; RT7A-GC & RT15-GC - Gold Coat
Options: See current catalogue for options.
Codes: Factored resistances are derived from data submitted to various North American building code evaluators and are in accordance with CSA O86-09.
Uplift
F1
F2
Typical RT3A
installation
Typical RT4
installation
1 7/16˝
Typical RT5
installation
Typical RT6
installation
1 9/16˝
1 9/16˝
1 7/8˝
1 7/8˝
Typical RT7
installation
1 3/8˝
2 1/2˝
1 1/2˝
5 1/4˝
3 3/4˝
4 1/2˝
2 7/8˝
1 1/4˝
1 1/2˝
2˝
2 15/16˝
3 9/16˝
1 15/16˝
RT4
RT3A
5 1/4˝
1 3/8˝
RT5
RT6
RT7
Uplift
Uplift
F1
F2
F2
Typical RT7A
installation
F1
Typical RT8A
installation
1 1/4˝
1 1/2˝
Typical RT10
installation
1 9/16˝
Typical RT15
installation
March 25, 2014
4 15/16˝
6 1/2˝
2 5/8˝
1 1/2˝
RT7A
1 1/4˝
RT8A
5 1/4˝
10 3/4˝
RT10
3 1/2˝
6 1/2˝
3 1/16˝
7 13/16˝
2 7/16˝
5˝
1 9/16˝
1 9/16˝
2 3/8˝
4˝
Typical RT16A
installation
RT15
RT16A
This technical document is not valid after Dec. 31, 2016.
Use in conjunction with USP’s current Canadian Product Catalogue for detailed hanger information.
USP supplies quality products
to build Stronger Safer Structures
www.USPconnectors.com
PAGE 1 OF 2
USP2296-141
Revised March 2014
RT – RAFTER TIES
Anchor installation
to achieve twice the load
Uplift
(using two identical anchors)
Wall Top Plate
F1
F2
Typical RT16AR
installation
Typical RT16-2
installation
Typical RT20
installation
Install diagonally across from
each other for minimum 1-½˝
truss/rafter.
2 1/4˝
5 1/2˝
2 1/16˝
6 1/2˝
3 1/8˝
3 3/8˝
4 5/8˝
3 1/2˝
6 1/2˝
4 1/4˝
6 1/2˝
21 1/8˝
RT16-2
RT16AR
Nailing into both sides of a
single ply 2x truss/rafter may
cause damages in the wood.
RT20
(Top View)
Installation:
• Use all specified fasteners.
• All nail holes must be filled with specified nails to achieve loads listed in the chart. For substituting with different nail sizes, refer to "Optional Nails" chart in the USP catalog or consult a design professional.
• Depending on pitch, birdsmouth notching may be required with some models to enable installers to fill all nail holes. Consult a design professional for appropriate notching.
• Designer shall determine if solid blocking is required.
Fastener Schedule2
USP
Stock No.
Stud
DF-L (Lbs)
DF-L (kN)
S-P-F (Lbs)
S-P-F (kN)
RT4
-- --
350
350
760 1.56 1.56 3.38
300
300
650 1.33 1.33 2.89
RT5
H5
18
4
-- --
-- --
425
425
995 1.89 1.89 4.43
365
365
855 1.62 1.62 3.80
RT6
HS24
H2.5,
H2.5T,
S/H2.5
H2.5A
-- --
18
8 10d x 1-1/2 6 10d x 1-1/2 -- --
-- --
1310 1310 1070 5.83 5.83 4.76 1125 1125 915 5.00 5.00 4.07
18
5
8d
5
8d
-- --
-- --
315
315
940 1.40 1.40 4.18
270
270
18
18
5
5
8d
N8-GC
5
5
8d
N8-GC
-- --- --
-- --- --
345
345
345 1235 1.53 1.53 5.49
345 1235 1.53 1.53 5.49
295
295
295 1060 1.31 1.31 4.72
295 1060 1.31 1.31 4.72
H8
H2, H2A,
S/H2
H1
18
5 10d x 1-1/2 5 10d x 1-1/2 -- --
-- --
350
350 1430 1.56 1.56 6.36
300
300 1225 1.33 1.33 5.45
18
6
8d
8
8d
6
8d
315
315
940 1.40 1.40 4.18
270
270
805 1.20 1.20 3.58
18
5
8d x 1-1/2
5
8d
-- --
-- --
925
485
975 4.11 2.16 4.34
795
415
835 3.54 1.85 3.71
18
5
N8-GC
5
N8-GC
-- --
-- --
910
475
960 4.05 2.11 4.27
770
400
805 3.43 1.78 3.58
18
9 10d x 1-1/2
8
10d
-- --
-- --
1285 1195 2545 5.72 5.32 11.32 1100 1025 2180 4.89 4.56 9.70
RT16AR
-- -H10,
H10A,
H14
H10AR
18
9 10d x 1-1/2
8
10d
-- --
-- --
1285 1195 2545 5.72 5.32 11.32 1100 1025 2180 4.89 4.56 9.70
RT16-2
H10-2
18
8
8
8d
-- --
-- --
1050 675 1860 4.67 3.00 8.27
-- --
16
9 10d x 1-1/2
4
10d
RT7
RT7A
RT7A-GC
RT8A
RT10
RT15
RT15-GC
RT16A
This technical document is not valid after Dec. 31, 2016.
Factored Resistance (115%)1
Plate
Steel
Ref. No. Gauge Qty
H3,
18
4
S/H3
H4
18
4
RT3A
March 25, 2014
Truss/Rafter
RT20
Type
Qty
Type
Qty
Type
F1
F2 Uplift F1
8d
4
8d
-- --
-- --
310
310 1190 1.38 1.38 5.29
265
265 1020 1.18 1.18 4.54
8d
4
8d
-- --
8d
4
8d
8d
9 10d x 1-1/2 -- --
-- -- 1925 -- --
F2 Uplift F1
-- -- 8.56
F2 Uplift F1
F2 Uplift
805 1.20 1.20 3.58
900
580 1595 4.00 2.58 7.09
-- --
-- -- 1650 -- -- -- -- 7.34
1) 15% increase for short-term loads such as wind and earthquake has been taken into account for factored resistances, no further increase allowed.
2) NAILS: 8d x 1-1/2" and N8-GC nails are 0.131˝ dia. x 1-1/2˝ long, 8d nails are 0.131˝ dia. x 2-1/2˝ long, 10d x 1-1/2˝ nails are 0.148˝ dia. x 1-1/2˝
long, 10d nails are 0.148˝ dia. x 3˝ long.
Use in conjunction with USP’s current Canadian Product Catalogue for detailed hanger information.
USP supplies quality products
to build Stronger Safer Structures
www.USPconnectors.com
PAGE 2 OF 2
USP2296-141
Revised March 2014
RT – RAFTER TIES
These anchors tie trusses and rafters to top plates and may be used to
tie wood framing members to resist uplift and lateral forces.
March 25, 2014
Materials: See chart
Finish: G90 galvanizing; RT7A-GC & RT15-GC - Gold Coat
Options: See current catalogue for options.
Codes: Factored resistances are derived from data submitted to various North American building code evaluators and are in accordance with CSA O86-09.
Uplift
F1
F2
March 25, 2014
Typical RT3A
installation
Typical RT4
installation
1 7/16˝
Typical RT5
installation
Typical RT6
installation
1 9/16˝
1 9/16˝
1 7/8˝
1 7/8˝
Typical RT7
installation
1 3/8˝
2 1/2˝
1 1/2˝
5 1/4˝
3 3/4˝
4 1/2˝
1 1/4˝
1 1/2˝
2˝
5 1/4˝
1 3/8˝
2 15/16˝
3 9/16˝
1 15/16˝
RT4
RT3A
March 25, 2014
2 7/8˝
RT5
RT6
RT7
Uplift
Uplift
F1
F2
F2
Typical RT7A
installation
F1
Typical RT8A
installation
1 1/4˝
1 1/2˝
Typical RT10
installation
1 9/16˝
Typical RT15
installation
4 15/16˝
6 1/2˝
March 25, 2014
2 5/8˝
1 1/2˝
RT7A
1 1/4˝
RT8A
5 1/4˝
10 3/4˝
RT10
3 1/2˝
6 1/2˝
3 1/16˝
7 13/16˝
2 7/16˝
5˝
1 9/16˝
1 9/16˝
2 3/8˝
4˝
Typical RT16A
installation
RT15
RT16A
This technical document is not valid after Dec. 31, 2016.
Use in conjunction with USP’s current Canadian Product Catalogue for detailed hanger information.
USP supplies quality products
to build Stronger Safer Structures
www.USPconnectors.com
PAGE 1 OF 2
USP2296-141
Revised March 2014
RT – RAFTER TIES
Anchor installation
to achieve twice the load
Uplift
(using two identical anchors)
Wall Top Plate
F1
F2
March 25, 2014
Typical RT16AR
installation
Typical RT16-2
installation
Typical RT20
installation
Install diagonally across from
each other for minimum 1-½˝
truss/rafter.
2 1/4˝
5 1/2˝
2 1/16˝
6 1/2˝
3 1/8˝
3 3/8˝
4 5/8˝
3 1/2˝
6 1/2˝
4 1/4˝
6 1/2˝
21 1/8˝
March 25, 2014
March 25, 2014
RT16-2
RT16AR
Nailing into both sides of a
single ply 2x truss/rafter may
cause damages in the wood.
RT20
(Top View)
Installation:
• Use all specified fasteners.
• All nail holes must be filled with specified nails to achieve loads listed in the chart. For substituting with different nail sizes, refer to "Optional Nails" chart in the USP catalog or consult a design professional.
• Depending on pitch, birdsmouth notching may be required with some models to enable installers to fill all nail holes. Consult a design professional for appropriate notching.
• Designer shall determine if solid blocking is required.
Fastener Schedule2
USP
Stock No.
Stud
DF-L (Lbs)
DF-L (kN)
S-P-F (Lbs)
S-P-F (kN)
RT4
-- --
350
350
760 1.56 1.56 3.38
300
300
650 1.33 1.33 2.89
RT5
H5
18
4
-- --
-- --
425
425
995 1.89 1.89 4.43
365
365
855 1.62 1.62 3.80
RT6
HS24
H2.5,
H2.5T,
S/H2.5
H2.5A
-- --
18
8 10d x 1-1/2 6 10d x 1-1/2 -- --
-- --
1310 1310 1070 5.83 5.83 4.76 1125 1125 915 5.00 5.00 4.07
18
5
8d
5
8d
-- --
-- --
315
315
940 1.40 1.40 4.18
270
270
18
18
5
5
8d
N8-GC
5
5
8d
N8-GC
-- --- --
-- --- --
345
345
345 1235 1.53 1.53 5.49
345 1235 1.53 1.53 5.49
295
295
295 1060 1.31 1.31 4.72
295 1060 1.31 1.31 4.72
H8
H2, H2A,
S/H2
H1
18
5 10d x 1-1/2 5 10d x 1-1/2 -- --
-- --
350
350 1430 1.56 1.56 6.36
300
300 1225 1.33 1.33 5.45
18
6
8d
8
8d
6
8d
315
315
940 1.40 1.40 4.18
270
270
805 1.20 1.20 3.58
18
5
8d x 1-1/2
5
8d
-- --
-- --
925
485
975 4.11 2.16 4.34
795
415
835 3.54 1.85 3.71
18
5
N8-GC
5
N8-GC
-- --
-- --
910
475
960 4.05 2.11 4.27
770
400
805 3.43 1.78 3.58
18
9 10d x 1-1/2
8
10d
-- --
-- --
1285 1195 2545 5.72 5.32 11.32 1100 1025 2180 4.89 4.56 9.70
RT16AR
-- -H10,
H10A,
H14
H10AR
18
9 10d x 1-1/2
8
10d
-- --
-- --
1285 1195 2545 5.72 5.32 11.32 1100 1025 2180 4.89 4.56 9.70
RT16-2
H10-2
18
8
8
8d
-- --
-- --
1050 675 1860 4.67 3.00 8.27
-- --
16
9 10d x 1-1/2
4
10d
RT7
RT7A
RT7A-GC
RT8A
RT10
RT15
RT15-GC
RT16A
This technical document is not valid after Dec. 31, 2016.
Factored Resistance (115%)1
Plate
Steel
Ref. No. Gauge Qty
H3,
18
4
S/H3
H4
18
4
RT3A
March 25, 2014
Truss/Rafter
RT20
Type
Qty
Type
Qty
Type
F1
F2 Uplift F1
8d
4
8d
-- --
-- --
310
310 1190 1.38 1.38 5.29
265
265 1020 1.18 1.18 4.54
8d
4
8d
-- --
8d
4
8d
8d
9 10d x 1-1/2 -- --
-- -- 1925 -- --
F2 Uplift F1
-- -- 8.56
F2 Uplift F1
F2 Uplift
805 1.20 1.20 3.58
900
580 1595 4.00 2.58 7.09
-- --
-- -- 1650 -- -- -- -- 7.34
1) 15% increase for short-term loads such as wind and earthquake has been taken into account for factored resistances, no further increase allowed.
2) NAILS: 8d x 1-1/2" and N8-GC nails are 0.131˝ dia. x 1-1/2˝ long, 8d nails are 0.131˝ dia. x 2-1/2˝ long, 10d x 1-1/2˝ nails are 0.148˝ dia. x 1-1/2˝
long, 10d nails are 0.148˝ dia. x 3˝ long.
Use in conjunction with USP’s current Canadian Product Catalogue for detailed hanger information.
USP supplies quality products
to build Stronger Safer Structures
www.USPconnectors.com
PAGE 2 OF 2
USP2296-141
Revised March 2014
RT – RAFTER TIES
These anchors tie trusses and rafters to top plates and may be used to
tie wood framing members to resist uplift and lateral forces.
March 25, 2014
Materials: See chart
Finish: G90 galvanizing; RT7A-GC & RT15-GC - Gold Coat
Options: See current catalogue for options.
Codes: Factored resistances are derived from data submitted to various North American building code evaluators and are in accordance with CSA O86-09.
Uplift
F1
F2
March 25, 2014
Typical RT3A
installation
Typical RT4
installation
1 7/16˝
Typical RT5
installation
Typical RT6
installation
1 9/16˝
1 9/16˝
1 7/8˝
1 7/8˝
Typical RT7
installation
1 3/8˝
2 1/2˝
1 1/2˝
5 1/4˝
3 3/4˝
4 1/2˝
1 1/4˝
1 1/2˝
2˝
5 1/4˝
1 3/8˝
2 15/16˝
3 9/16˝
1 15/16˝
RT4
RT3A
March 25, 2014
2 7/8˝
RT5
RT6
RT7
Uplift
Uplift
F1
F2
F2
Typical RT7A
installation
Typical RT8A
installation
1 1/4˝
1 1/2˝
March 25, 2014
F1
Typical RT10
installation
1 9/16˝
Typical RT15
installation
4 15/16˝
6 1/2˝
2 5/8˝
1 1/2˝
RT7A
1 1/4˝
RT8A
5 1/4˝
10 3/4˝
RT10
3 1/2˝
6 1/2˝
3 1/16˝
7 13/16˝
2 7/16˝
5˝
1 9/16˝
1 9/16˝
2 3/8˝
4˝
Typical RT16A
installation
RT15
RT16A
This technical document is not valid after Dec. 31, 2016.
Use in conjunction with USP’s current Canadian Product Catalogue for detailed hanger information.
USP supplies quality products
to build Stronger Safer Structures
www.USPconnectors.com
PAGE 1 OF 2
USP2296-141
Revised March 2014
RT – RAFTER TIES
Anchor installation
to achieve twice the load
Uplift
(using two identical anchors)
Wall Top Plate
F1
March 25, 2014
F2
Typical RT16AR
installation
Typical RT16-2
installation
Typical RT20
installation
Install diagonally across from
each other for minimum 1-½˝
truss/rafter.
2 1/4˝
5 1/2˝
2 1/16˝
6 1/2˝
3 1/8˝
3 3/8˝
4 5/8˝
3 1/2˝
6 1/2˝
4 1/4˝
6 1/2˝
21 1/8˝
March 25, 2014
RT16-2
RT16AR
Nailing into both sides of a
single ply 2x truss/rafter may
cause damages in the wood.
RT20
(Top View)
Installation:
• Use all specified fasteners.
• All nail holes must be filled with specified nails to achieve loads listed in the chart. For substituting with different nail sizes, refer to "Optional Nails" chart in the USP catalog or consult a design professional.
• Depending on pitch, birdsmouth notching may be required with some models to enable installers to fill all nail holes. Consult a design professional for appropriate notching.
• Designer shall determine if solid blocking is required.
March 25, 2014
Fastener Schedule2
USP
Stock No.
Stud
DF-L (Lbs)
DF-L (kN)
S-P-F (Lbs)
S-P-F (kN)
RT4
-- --
350
350
760 1.56 1.56 3.38
300
300
650 1.33 1.33 2.89
RT5
H5
18
4
-- --
-- --
425
425
995 1.89 1.89 4.43
365
365
855 1.62 1.62 3.80
RT6
HS24
H2.5,
H2.5T,
S/H2.5
H2.5A
-- --
18
8 10d x 1-1/2 6 10d x 1-1/2 -- --
-- --
1310 1310 1070 5.83 5.83 4.76 1125 1125 915 5.00 5.00 4.07
18
5
8d
5
8d
-- --
-- --
315
315
940 1.40 1.40 4.18
270
270
18
18
5
5
8d
N8-GC
5
5
8d
N8-GC
-- --- --
-- --- --
345
345
345 1235 1.53 1.53 5.49
345 1235 1.53 1.53 5.49
295
295
295 1060 1.31 1.31 4.72
295 1060 1.31 1.31 4.72
H8
H2, H2A,
S/H2
H1
18
5 10d x 1-1/2 5 10d x 1-1/2 -- --
-- --
350
350 1430 1.56 1.56 6.36
300
300 1225 1.33 1.33 5.45
18
6
8d
8
8d
6
8d
315
315
940 1.40 1.40 4.18
270
270
805 1.20 1.20 3.58
18
5
8d x 1-1/2
5
8d
-- --
-- --
925
485
975 4.11 2.16 4.34
795
415
835 3.54 1.85 3.71
18
5
N8-GC
5
N8-GC
-- --
-- --
910
475
960 4.05 2.11 4.27
770
400
805 3.43 1.78 3.58
18
9 10d x 1-1/2
8
10d
-- --
-- --
1285 1195 2545 5.72 5.32 11.32 1100 1025 2180 4.89 4.56 9.70
RT16AR
-- -H10,
H10A,
H14
H10AR
18
9 10d x 1-1/2
8
10d
-- --
-- --
1285 1195 2545 5.72 5.32 11.32 1100 1025 2180 4.89 4.56 9.70
RT16-2
H10-2
18
8
8
8d
-- --
-- --
1050 675 1860 4.67 3.00 8.27
-- --
16
9 10d x 1-1/2
4
10d
RT7
RT7A
RT7A-GC
RT8A
RT10
RT15
RT15-GC
RT16A
RT20
This technical document is not valid after Dec. 31, 2016.
Factored Resistance (115%)1
Plate
Steel
Ref. No. Gauge Qty
H3,
18
4
S/H3
H4
18
4
RT3A
March 25, 2014
Truss/Rafter
Type
Qty
Type
Qty
Type
F1
F2 Uplift F1
8d
4
8d
-- --
-- --
310
310 1190 1.38 1.38 5.29
265
265 1020 1.18 1.18 4.54
8d
4
8d
-- --
8d
4
8d
8d
9 10d x 1-1/2 -- --
-- -- 1925 -- --
F2 Uplift F1
-- -- 8.56
F2 Uplift F1
F2 Uplift
805 1.20 1.20 3.58
900
580 1595 4.00 2.58 7.09
-- --
-- -- 1650 -- -- -- -- 7.34
1) 15% increase for short-term loads such as wind and earthquake has been taken into account for factored resistances, no further increase allowed.
2) NAILS: 8d x 1-1/2" and N8-GC nails are 0.131˝ dia. x 1-1/2˝ long, 8d nails are 0.131˝ dia. x 2-1/2˝ long, 10d x 1-1/2˝ nails are 0.148˝ dia. x 1-1/2˝
long, 10d nails are 0.148˝ dia. x 3˝ long.
Use in conjunction with USP’s current Canadian Product Catalogue for detailed hanger information.
USP supplies quality products
to build Stronger Safer Structures
www.USPconnectors.com
PAGE 2 OF 2
USP2296-141
Revised March 2014