Background
Referred to the EP Condition 2.26 (EP-407/2010/D), MTRCL shall deposit with the Director of
EPD an Operational Ground-borne Noise Mitigation Measures Plan showing:
(a) Type 1a Trackform – Resilient Baseplate shall be installed at the track section
between Chainage 16730 and 16980 as shown in Figure 10; and
(b) any additional or changes in noise mitigation measures as required in accordance
with the Operational Ground-borne Noise Review Plan deposited under Condition
2.25.
Review of the upgraded trackform for SIL(E)
In accordance with the approved SIL(E) EIA report, Type 1a trackform was proposed along
the SIL(E) alignment. With reference to Section 3.5.2.3 of the approved SIL(E) EIA report, full
compliance with the ground-borne Acceptable Noise Level (ANL) could be achieved by the
use of incline turnout and Type 1a resilient baseplated trackform within the SOH station
between chainage 16730 and 16980. It was verified in the Operational Ground-borne Noise
Review Plan submitted under EP Condition 2.25 (EP-407/2010/D) with updated on-site
measured Line Source Response and ground vibration conditions.
With a more conservative approach for better performance and service to the community,
an upgrade of trackform would be employed in SIL(E). A review of the upgraded trackform
provision and the trackform proposed in the approved SIL(E) EIA Report is summarized in the
Table 1.1 below:
Table 1.1
Chainage
(Approx.)
DN 9915
UP 9915
DN 10130
UP 10130
DN 10250
UP 10250
DN 13310
UP 13310
DN 13530
UP 13530
DN 14055
DN 14080
Review of Trackform for SIL(E)
Trackform proposed in the
approved SIL(E) EIA Report
Type 1a Resilient Baseplate
10130
Trackform [1]
10130
10250
10250
13310
13310
13530
13530
14055
14075
14080
14310
—
—
—
—
—
—
—
—
—
—
—
—
DN 14310—14335
UP 14075—14100
DN 14335—14445
UP 14100—14525
DN 14445—14470
UP 14525—14550
υ
Upgraded Trackform for SIL(E)
Type 1 BCT Trackform
Delkor Alt 1 Baseplate [2]
Turnout Trackform [3]
Type 1 BCT Trackform
Delkor Alt 1 Baseplate
Type 1 FST Trackform
Delkor Alt 1 Baseplate[4]
Type 1 BCT Trackform
Delkor Alt 1 Baseplate
Turnout Trackform
Type 1 BCT Trackform
Delkor Alt 1 Baseplate
Turnout Trackform
Type 1 BCT Trackform
Delkor Alt 1 Baseplate
Turnout Trackform
Chainage
(Approx.)
DN 14470
UP 14550
DN 15800
UP 15800
—15800
—15800
—15900
—15900
DN 15900—16715
UP 15900—16720
DN 16715—16840
UP 16720—16830
DN 16840—16850
UP 16830—16850
DN 16850—16925
UP 16850—16930
DN 16925—16970
UP 16930—16980
Trackform proposed in the
approved SIL(E) EIA Report
Type 1a Resilient Baseplate
Trackform
Incline turnout and Type 1a
Resilient Baseplate Trackform
between Chainage 16730
16980
—
Upgraded Trackform for SIL(E)
Type 1 BCT Trackform
Delkor Alt 1 Baseplate
Type 2 Trackform
Web Supported Baseplate
(i.e. Vanguard Baseplate)[5]
Type 1 BCT Trackform
Delkor Alt 1 Baseplate
Turnout Trackform
Type 1 BCT Trackform
Delkor Alt 1 Baseplate
Type 1 FST Trackform
Delkor Alt 1 Baseplate
Type 1 BCT Trackform
Delkor Alt 1 Baseplate
Remarks:
1. Type 1a Trackform is the resilient baseplated trackform with stiffness of 25 kN/mm
2. Type 1 BCT (Baseplated Concrete Tie) Trackform is the resilient baseplated trackform with track
slab casted in-situ with sleepers. The trackform assembly is the same as Type 1a and using Delkor
Alt 1 Baseplate with track stiffness of 20-25 kN/mm
3. Turnout Trackform is trackform at turnout location with resilient baseplate pad with overall
stiffness of 25 kN/mm and inclined at 1 in 20
4. Type 1 FST (Floating Slab Track) Trackform is the resilient baseplated trackform with precast slab
supported by rubber bearings underneath. The trackform assembly is the same as Type 1a and
using Delkor Alt 1 Baseplate with track stiffness of 20-25 kN/mm
5. Type 2 Trackform with Web Supported Baseplate is the resilient baseplated trackform with track
slab casted in-situ with sleepers. The baseplate is Vanguard Baseplate and track stiffness of 3-5
kN/mm
As shown in the Table 1.1 above, the type of trackform proposed in the approved SIL(E) EIA
Report would be upgraded to BCT Trackform, Turnout Trackform, FST Trackform with Delkor
Alt 1 baseplate or Type 2 Trackform with Vanguard baseplate. The track schematics of SIL(E)
are shown in Appendix 1 and results of performance test for different trackfroms are given
in Appendix 2.
The upgraded trackform is more resilience than that proposed in the approved SIL(E) EIA
report, and hence would have better vibration attenuation. With the upgrade of trackform,
the ground-borne noise impact from the operation of SIL(E) on the community will be less
than it is predicted in the EIA Report.
φ
Appendix 1
Track Schematics for SIL(E)
NOTES
TWIN TRACK
NON-BALLASTED BCT
BCT TRACK
TRACKFORM
AT BAV GARAGE
902
913/W/SIE/MTR/C01/001.
2. CHAINAGES SHOWN FOR TURNOUTS
HORSESHOE TUNNEL
TWIN TRACK NON-BALLASTED BCT TRACKFORM
TURNOUT SLAB
BCT TRACKFORM
NON-BALLASTED
BCT TRACKFORM
DN
I/001/002
I/001/001
DRAWING REFERENCE:
CH.10000
I/001/003
CH.10100
CH.10250.761
CH.10300
CH.10400
CH.10500
CH.13290
CH.13000
CH.13100
I/001/004
CH.13200
I/001/005
CH.13300
CH.13310
I/001/006
CH.13400
STATION
TRACKFORM
I/001/006a
I/001/007
ARE AT TANGENT POINTS (TC).
NON-BALLASTED
VOLUME 2 : SCHEMATICS
CH.9915
FST
CH.13500
REFER TO DRAWING NO.
D
901
CH.9923
ELEVATED BOX
CH.13532
1. FOR GENERAL NOTES AND LEGEND,
AT BAV GARAGE
D
CH.10130.006
902
CH.10200
903
BCT TRACK
INTERFACE SCHEDULE
- C31/011
& BUFFER STOP SCHEDULE
VOLUME 4 : JUNCTION LAYOUT
T 8084W
T 8082W
TURNOUT
1 IN 14
1 IN 14
RH T/O
RH T/O
- C33/001
TO C33/009
B3/01
VOLUME 5 : STANDARD DETAILS
TUNNEL
ADM
PORTAL
TWIN TRACK HORSESHOE
- C32/001
TUNNEL BCT
1 IN 14
1 IN 14
LH T/O
B3/02
LH T/O
T 8083W
HORSESHOE TUNNEL
BASEPLATE TRACKFORM
TWIN TRACK NON-BALLASTED BCT TRACKFORM
HORSESHOE TUNNEL
CH.9923
BCT TRACK AT
- C32/003
BAV GARAGE
HORSESHOE TUNNEL BCT
STATION BCT
NON-BALLASTED
- C32/004
- C32/005
& 006
STATION
BCT TRACKFORM
ELEVATED BOX
CH.9915
CH.10000
CH.10100
CH.10129.203
CH.10200
CH.10249.958
CH.10300
CH.10400
CH.10500
CH.13290
CH.13000
D
CH.13100
CH.13200
CH.13300
CH.13303
CH.13400
CH.13500
SEE BELOW FOR CONTINUATION
MATCH LINE
CH.13531
UP
FST
- C32/002
WEB SUPPORTED
T 8081W
TURNOUT SLAB
NON-BALLASTED
TRACKFORM
BCT TRACKFORM
STATION FST
- C32/007
RECTANGULAR TUNNEL BCT - C32/008
TWIN TRACK
NON-BALLASTED BCT
BCT TRACK
TRACKFORM
AT BAV GARAGE
VIADUCT BCT
BCT TRACK
- C32/010
& 011
AT BAV GARAGE
D
D
ELEVATED BOX FST
- C32/012
HORSESHOE TUNNEL
- C32/015
TURNOUT SLAB
TURNOUT SLAB TRACKFORM
903
(W/O BEARERS)
VIADUCT TURNOUT SLAB
902
- C32/016
(W/BEARERS)
NON-BALLASTED
BCT TRACKFORM
TURNOUT SLAB
TRACKFORM
TRACKFORM
RH T/O
TURNOUT
I/001/022
I/001/021
FILENAME:
MODELNAME:
CH.13600
CH.13700
CH.13800
OCP
TRACKFORM
NON-BALLASTED
BCT TRACKFORM
CH.13900
CH.14000
CH.14076.844
NON-BALLASTED
BCT TRACKFORM
CH.14100
DEPOT
CH.13851.166
T 8281W
I/001/013
CH.14200
TO / FROM
I/001/016
CH.13500
RH T/O
UP
I/001/020
TURNOUT
TURNOUT
NON-BALLASTED BCT TRACKFORM
SLAB
NON-BALLASTED BCT TRACKFORM
SLAB
TRACKFORM
TRACKFORM
VIADUCT
DRAWN
D
TRACKFORM TYPE REVISED
TIM
19NOV13
CK
C
INTERFACE NUMBER ADDED
CHW
30AUG13
CK
B
TRACKFORM EXTENT NAM FUNG VB REVISED
CHW
09NOV12
CK
TITLE
KLT
DESIGNED
ML
CHECKED
BT
APPROVED
DE
CONTRACT 913
TRACK SCHEMATICS
SOUTH ISLAND LINE (EAST)
ORIGINATOR
DATE
08/02/2012
DO NOT SCALE DRAWINGS. ALL DIMENSIONS SHALL BE
PLOT DRV:
CH.13900
CH.14000
CH.14056.430
CH.14
CH.65.709
1 IN 7
1 IN 7
SEE ABOVE FOR CONTINUATION
I/001/023
NON-BALLASTED BCT TRACKFORM
CH.14100
CH.14200
CH.91.604
T 242W
I/001/014
UP
CH.13500
I/001/015
RMJ1/001
CH.13532
LH T/O
I/001/018 I/001/017
CH.14400
CH.14500
CH.14557
CH.253.690
1 IN 7
SINGLE SLIP
SLAB
CH.14551.343
CH.14597.343
CH.14600
CH.14700
1 IN 7
B1/05
MATCH LINE
MATCH LINE
CH.14800
FOR CONTINUATION
SEE DRG. NO. 913/W/SIE/MTR/C31/002
4:11:50 PM
25/11/2013
cyhau
PRINTED BY:
Default
X:\DP\C913\PWY\W\Rev_D\913_W_SIE_MTR_C31_001D.dgn
X:\CADD_Library\MicroStation\Workspace\plotdrv\PDF_BW_300dpi_080924.plt
T 8283W
I/001/019
T 243W
T 232W
1 IN 7 LH T/O
T 8282W
T 241W
1 IN 7
LH T/O
CH.13531
T 244W
RMJ1/003
RMJ2/004
CH.14300
WCH
DEPOT SHUNT
DN
OCP
LH T/O
CH.13600
LH T/O
1 IN 7
I/001/007
CH.13700
1 IN 7
T 8288W
SLIP
I/001/008
CH.13800
SINGLE
RMJ1/002
NON-BALLASTED BCT TRACKFORM
CH.13852.468
RH T/O
DN
T 8284W
- C32/017
(W/O BEARERS)
CH.0
1 IN 7
1 IN 7
1 IN 7
LH T/O
I/001/009
CH.100
FUTURE
I/001/010
CH.235
T 8286W
NON-BALLASTED BCT TRACKFORM
CH.14300
CH.279.432
1 IN 7
RH T/O
I/001/011
CH.346
I/001/012
CH.358.478
CH.14400
CH.14470.518
I/001/012A
CH.14500
SIL(W)
CH.14600
CH.14597.007
FUTURE
CH.14700
CH.14800
NON-BALLASTED BCT TRACKFORM
C
VIADUCT TURNOUT SLAB
TURNOUT SLAB
CH.14310.898
VIADUCT
VERIFIED ON SITE.
ADMIRALTY TO WONG CHUK HANG
PROJECTS DIVISION
CIVIL & PLANNING DEPARTMENT
MTR CORPORATION LIMITED 2008 COPYRIGHT IN
A
ISSUE FOR CONSTRUCTION
KLT
08FEB12
DE
BY
DATE
APPROVED
RESPECT OF THIS DRAWING / DOCUMENT IS OWNED BY THE
MTR CORPORATION LIMITED OF HONG KONG. NO
REPRODUCTION OF THE DRAWING / DOCUMENT OR ANY PART
REV
DESCRIPTION
BY
DATE
APPROVED
REV
DESCRIPTION
BY WHATEVER MEANS IS PERMITTED WITHOUT THE PRIOR
WRITTEN CONSENT OF THE MTR CORPORATION LIMITED.
SCALE
CADD REF.
913_W_SIE_MTR_C31_001D.dgn
DRAWING NO.
NTS
REV.
913/W/SIE/MTR/C31/001
D
NOTES
1. FOR GENERAL NOTES AND LEGEND,
REFER TO DRAWING NO.
904
903
913/W/SIE/MTR/C01/001.
NON-BALLASTED
BCT TRACKFORM
HORSESHOE TUNNEL
CUT & COVER TUNNEL
2. CHAINAGES SHOWN FOR TURNOUTS
VIADUCT
VIADUCT (AP LEI CHAU BRIDGE)
ARE AT TANGENT POINTS (TC).
STATION NON-BALLASTED
NON-BALLASTED
RECTANGULAR TUNNEL
BCT TRACKFORM
WEB SUPPORTED
NON-BALLASTED
BCT TRACKFORM
DRAWING REFERENCE:
CH.14800
CH.14900
CH.15000
CH.15100
CH.15200
CH.15300
CH.15344
CH.15338
CH.15400
CH.15584
CH.15578
CH.15500
I/002/001
CH.15600
I/002/002
CH.15755
CH.15800
I/002/003
CH.15700
TRACKFORM
I/002/004
CH.15900
I/002/005
CH.16000
CH.16100
CH.16007.056
BASEPLATE
I/002/006
NON-BALLASTED BCT TRACKFORM
VOLUME 2 : SCHEMATICS
INTERFACE SCHEDULE
- C31/011
& BUFFER STOP SCHEDULE
VOLUME 4 : JUNCTION LAYOUT
DN
TURNOUT
- C33/001
TO C33/009
RMJ2/008
RMJ2/006
VOLUME 5 : STANDARD DETAILS
TUNNEL
LET
PORTAL
TWIN TRACK HORSESHOE
RMJ2/007
- C32/001
TUNNEL BCT
RMJ2/005
UP
HORSESHOE TUNNEL
- C32/002
WEB SUPPORTED
BASEPLATE TRACKFORM
NON-BALLASTED
TRACKFORM
CUT & COVER TUNNEL
VIADUCT (AP LEI CHAU BRIDGE)
VIADUCT
STATION NON-BALLASTED
BCT TRACKFORM
CH.14800
CH.14900
CH.15000
CH.15100
CH.15200
CH.15300
CH.15342
CH.15336
CH.15400
CH.15500
CH.15576
NON-BALLASTED BCT TRACKFORM
BCT TRACKFORM
BASEPLATE
HORSESHOE TUNNEL
FOR CONTINUATION
SEE DRG. NO. 913/W/SIE/MTR/C31/001
RECTANGULAR TUNNEL
WEB SUPPORTED
CH.15582
CH.15600
CH.15700
CH.15755
CH.15800
CH.15900
CH.16000
NON-BALLASTED
BCT TRACKFORM
NON-BALLASTED
MATCH LINE
MATCH LINE
NON-BALLASTED
BCT TRACKFORM
SEE BELOW FOR CONTINUATION
CH.16100
CH.16005.872
C
BCT TRACK AT
- C32/003
BAV GARAGE
HORSESHOE TUNNEL BCT
STATION BCT
- C32/004
- C32/005
& 006
STATION FST
- C32/007
RECTANGULAR TUNNEL BCT - C32/008
VIADUCT BCT
- C32/010
& 011
ELEVATED BOX FST
- C32/012
HORSESHOE TUNNEL
- C32/015
TURNOUT SLAB
VIADUCT TURNOUT SLAB
- C32/016
(W/BEARERS)
CUT & COVER
HORSESHOE TUNNEL
VIADUCT TURNOUT SLAB
- C32/017
(W/O BEARERS)
RECTANGULAR TUNNEL
TURNOUT SLAB
TRACKFORM
NON-BALLASTED BCT TRACKFORM
FST TRACKFORM
I/002/008
CH.16100
CH.16300
CH.16300
CH.16200
CH.16400
CH.16400
CH.16500
CH.16600
CH.16700
CH.16713.177
I/002/007
CH.16800
CH.16842.191
CH.16887.689
I/002/009
I/002/012
CH.16900
CH.16964.123
STATION
NON-BALLASTED
CH.16972.123
NON-BALLASTED
BCT TRACKFORM
DN
T 8484W
1 IN 10.5
T 8482W
RH T/O
1 IN 10.5
B3/03
RH T/O
SOH
1 IN 10.5
1 IN 10.5
RH T/O
LH T/O
T 8481W
UP
NON-BALLASTED
TURNOUT SLAB
CUT & COVER
FILENAME:
MODELNAME:
CH.16100
CH.16200
NON-BALLASTED BCT TRACKFORM
TRACKFORM
HORSESHOE TUNNEL
MATCH LINE
BCT TRACKFORM
STATION
NON-BALLASTED
FST TRACKFORM
DRAWN
TITLE
KLT
DESIGNED
ML
CHECKED
BT
APPROVED
DE
PL
CONTRACT 913
TRACK SCHEMATICS
SOUTH ISLAND LINE (EAST)
ORIGINATOR
C
TRACKFORM TYPE REVISED
TIM
19NOV13
CK
B
TYPO CORRECTED
KLT
29JUL13
CK
DATE
08/02/2012
DO NOT SCALE DRAWINGS. ALL DIMENSIONS SHALL BE
PLOT DRV:
CH.16500
CH.16600
CH.16700
CH.16718.642
CH.16800
I/002/010
RECTANGULAR TUNNEL
SEE ABOVE FOR CONTINUATION
I/002/011
CH.16832.250
CH.16895.017
CH.16900
CH.16971.480
T 8483W
CH.16979.480
10:32:33 AM
19/11/2013
cyhau
PRINTED BY:
Default
X:\DP\C913\PWY\W\Rev_C\913_W_SIE_MTR_C31_002C.dgn\913_W_SIE_MTR_C31_002C.dgn
X:\CADD_Library\MicroStation\Workspace\plotdrv\PDF_BW_300dpi_080924.plt
B3/04
VERIFIED ON SITE.
WONG CHUK HANG TO SOUTH HORIZONS
PROJECTS DIVISION
CIVIL & PLANNING DEPARTMENT
MTR CORPORATION LIMITED 2008 COPYRIGHT IN
A
ISSUE FOR CONSTRUCTION
KLT
08FEB12
CK
BY
DATE
APPROVED
RESPECT OF THIS DRAWING / DOCUMENT IS OWNED BY THE
MTR CORPORATION LIMITED OF HONG KONG. NO
REPRODUCTION OF THE DRAWING / DOCUMENT OR ANY PART
REV
DESCRIPTION
BY
DATE
APPROVED
REV
DESCRIPTION
BY WHATEVER MEANS IS PERMITTED WITHOUT THE PRIOR
WRITTEN CONSENT OF THE MTR CORPORATION LIMITED.
SCALE
CADD REF.
913_W_SIE_MTR_C31_002C.dgn
DRAWING NO.
NTS
REV.
913/W/SIE/MTR/C31/002
C
Appendix 2
Results of Performance Test for Trackforms