South Island Line (East) Operational Ground-borne Noise Mitigation Measures Plan MTR Corporation Limited July 2014 Background Referred to the EP Condition 2.26 (EP-407/2010/D), MTRCL shall deposit with the Director of EPD an Operational Ground-borne Noise Mitigation Measures Plan showing: (a) Type 1a Trackform – Resilient Baseplate shall be installed at the track section between Chainage 16730 and 16980 as shown in Figure 10; and (b) any additional or changes in noise mitigation measures as required in accordance with the Operational Ground-borne Noise Review Plan deposited under Condition 2.25. Review of the upgraded trackform for SIL(E) In accordance with the approved SIL(E) EIA report, Type 1a trackform was proposed along the SIL(E) alignment. With reference to Section 3.5.2.3 of the approved SIL(E) EIA report, full compliance with the ground-borne Acceptable Noise Level (ANL) could be achieved by the use of incline turnout and Type 1a resilient baseplated trackform within the SOH station between chainage 16730 and 16980. It was verified in the Operational Ground-borne Noise Review Plan submitted under EP Condition 2.25 (EP-407/2010/D) with updated on-site measured Line Source Response and ground vibration conditions. With a more conservative approach for better performance and service to the community, an upgrade of trackform would be employed in SIL(E). A review of the upgraded trackform provision and the trackform proposed in the approved SIL(E) EIA Report is summarized in the Table 1.1 below: Table 1.1 Chainage (Approx.) DN 9915 UP 9915 DN 10130 UP 10130 DN 10250 UP 10250 DN 13310 UP 13310 DN 13530 UP 13530 DN 14055 DN 14080 Review of Trackform for SIL(E) Trackform proposed in the approved SIL(E) EIA Report Type 1a Resilient Baseplate 10130 Trackform [1] 10130 10250 10250 13310 13310 13530 13530 14055 14075 14080 14310 — — — — — — — — — — — — DN 14310—14335 UP 14075—14100 DN 14335—14445 UP 14100—14525 DN 14445—14470 UP 14525—14550 υ Upgraded Trackform for SIL(E) Type 1 BCT Trackform Delkor Alt 1 Baseplate [2] Turnout Trackform [3] Type 1 BCT Trackform Delkor Alt 1 Baseplate Type 1 FST Trackform Delkor Alt 1 Baseplate[4] Type 1 BCT Trackform Delkor Alt 1 Baseplate Turnout Trackform Type 1 BCT Trackform Delkor Alt 1 Baseplate Turnout Trackform Type 1 BCT Trackform Delkor Alt 1 Baseplate Turnout Trackform Chainage (Approx.) DN 14470 UP 14550 DN 15800 UP 15800 —15800 —15800 —15900 —15900 DN 15900—16715 UP 15900—16720 DN 16715—16840 UP 16720—16830 DN 16840—16850 UP 16830—16850 DN 16850—16925 UP 16850—16930 DN 16925—16970 UP 16930—16980 Trackform proposed in the approved SIL(E) EIA Report Type 1a Resilient Baseplate Trackform Incline turnout and Type 1a Resilient Baseplate Trackform between Chainage 16730 16980 — Upgraded Trackform for SIL(E) Type 1 BCT Trackform Delkor Alt 1 Baseplate Type 2 Trackform Web Supported Baseplate (i.e. Vanguard Baseplate)[5] Type 1 BCT Trackform Delkor Alt 1 Baseplate Turnout Trackform Type 1 BCT Trackform Delkor Alt 1 Baseplate Type 1 FST Trackform Delkor Alt 1 Baseplate Type 1 BCT Trackform Delkor Alt 1 Baseplate Remarks: 1. Type 1a Trackform is the resilient baseplated trackform with stiffness of 25 kN/mm 2. Type 1 BCT (Baseplated Concrete Tie) Trackform is the resilient baseplated trackform with track slab casted in-situ with sleepers. The trackform assembly is the same as Type 1a and using Delkor Alt 1 Baseplate with track stiffness of 20-25 kN/mm 3. Turnout Trackform is trackform at turnout location with resilient baseplate pad with overall stiffness of 25 kN/mm and inclined at 1 in 20 4. Type 1 FST (Floating Slab Track) Trackform is the resilient baseplated trackform with precast slab supported by rubber bearings underneath. The trackform assembly is the same as Type 1a and using Delkor Alt 1 Baseplate with track stiffness of 20-25 kN/mm 5. Type 2 Trackform with Web Supported Baseplate is the resilient baseplated trackform with track slab casted in-situ with sleepers. The baseplate is Vanguard Baseplate and track stiffness of 3-5 kN/mm As shown in the Table 1.1 above, the type of trackform proposed in the approved SIL(E) EIA Report would be upgraded to BCT Trackform, Turnout Trackform, FST Trackform with Delkor Alt 1 baseplate or Type 2 Trackform with Vanguard baseplate. The track schematics of SIL(E) are shown in Appendix 1 and results of performance test for different trackfroms are given in Appendix 2. The upgraded trackform is more resilience than that proposed in the approved SIL(E) EIA report, and hence would have better vibration attenuation. With the upgrade of trackform, the ground-borne noise impact from the operation of SIL(E) on the community will be less than it is predicted in the EIA Report. φ Appendix 1 Track Schematics for SIL(E) NOTES TWIN TRACK NON-BALLASTED BCT BCT TRACK TRACKFORM AT BAV GARAGE 902 913/W/SIE/MTR/C01/001. 2. CHAINAGES SHOWN FOR TURNOUTS HORSESHOE TUNNEL TWIN TRACK NON-BALLASTED BCT TRACKFORM TURNOUT SLAB BCT TRACKFORM NON-BALLASTED BCT TRACKFORM DN I/001/002 I/001/001 DRAWING REFERENCE: CH.10000 I/001/003 CH.10100 CH.10250.761 CH.10300 CH.10400 CH.10500 CH.13290 CH.13000 CH.13100 I/001/004 CH.13200 I/001/005 CH.13300 CH.13310 I/001/006 CH.13400 STATION TRACKFORM I/001/006a I/001/007 ARE AT TANGENT POINTS (TC). NON-BALLASTED VOLUME 2 : SCHEMATICS CH.9915 FST CH.13500 REFER TO DRAWING NO. D 901 CH.9923 ELEVATED BOX CH.13532 1. FOR GENERAL NOTES AND LEGEND, AT BAV GARAGE D CH.10130.006 902 CH.10200 903 BCT TRACK INTERFACE SCHEDULE - C31/011 & BUFFER STOP SCHEDULE VOLUME 4 : JUNCTION LAYOUT T 8084W T 8082W TURNOUT 1 IN 14 1 IN 14 RH T/O RH T/O - C33/001 TO C33/009 B3/01 VOLUME 5 : STANDARD DETAILS TUNNEL ADM PORTAL TWIN TRACK HORSESHOE - C32/001 TUNNEL BCT 1 IN 14 1 IN 14 LH T/O B3/02 LH T/O T 8083W HORSESHOE TUNNEL BASEPLATE TRACKFORM TWIN TRACK NON-BALLASTED BCT TRACKFORM HORSESHOE TUNNEL CH.9923 BCT TRACK AT - C32/003 BAV GARAGE HORSESHOE TUNNEL BCT STATION BCT NON-BALLASTED - C32/004 - C32/005 & 006 STATION BCT TRACKFORM ELEVATED BOX CH.9915 CH.10000 CH.10100 CH.10129.203 CH.10200 CH.10249.958 CH.10300 CH.10400 CH.10500 CH.13290 CH.13000 D CH.13100 CH.13200 CH.13300 CH.13303 CH.13400 CH.13500 SEE BELOW FOR CONTINUATION MATCH LINE CH.13531 UP FST - C32/002 WEB SUPPORTED T 8081W TURNOUT SLAB NON-BALLASTED TRACKFORM BCT TRACKFORM STATION FST - C32/007 RECTANGULAR TUNNEL BCT - C32/008 TWIN TRACK NON-BALLASTED BCT BCT TRACK TRACKFORM AT BAV GARAGE VIADUCT BCT BCT TRACK - C32/010 & 011 AT BAV GARAGE D D ELEVATED BOX FST - C32/012 HORSESHOE TUNNEL - C32/015 TURNOUT SLAB TURNOUT SLAB TRACKFORM 903 (W/O BEARERS) VIADUCT TURNOUT SLAB 902 - C32/016 (W/BEARERS) NON-BALLASTED BCT TRACKFORM TURNOUT SLAB TRACKFORM TRACKFORM RH T/O TURNOUT I/001/022 I/001/021 FILENAME: MODELNAME: CH.13600 CH.13700 CH.13800 OCP TRACKFORM NON-BALLASTED BCT TRACKFORM CH.13900 CH.14000 CH.14076.844 NON-BALLASTED BCT TRACKFORM CH.14100 DEPOT CH.13851.166 T 8281W I/001/013 CH.14200 TO / FROM I/001/016 CH.13500 RH T/O UP I/001/020 TURNOUT TURNOUT NON-BALLASTED BCT TRACKFORM SLAB NON-BALLASTED BCT TRACKFORM SLAB TRACKFORM TRACKFORM VIADUCT DRAWN D TRACKFORM TYPE REVISED TIM 19NOV13 CK C INTERFACE NUMBER ADDED CHW 30AUG13 CK B TRACKFORM EXTENT NAM FUNG VB REVISED CHW 09NOV12 CK TITLE KLT DESIGNED ML CHECKED BT APPROVED DE CONTRACT 913 TRACK SCHEMATICS SOUTH ISLAND LINE (EAST) ORIGINATOR DATE 08/02/2012 DO NOT SCALE DRAWINGS. ALL DIMENSIONS SHALL BE PLOT DRV: CH.13900 CH.14000 CH.14056.430 CH.14 CH.65.709 1 IN 7 1 IN 7 SEE ABOVE FOR CONTINUATION I/001/023 NON-BALLASTED BCT TRACKFORM CH.14100 CH.14200 CH.91.604 T 242W I/001/014 UP CH.13500 I/001/015 RMJ1/001 CH.13532 LH T/O I/001/018 I/001/017 CH.14400 CH.14500 CH.14557 CH.253.690 1 IN 7 SINGLE SLIP SLAB CH.14551.343 CH.14597.343 CH.14600 CH.14700 1 IN 7 B1/05 MATCH LINE MATCH LINE CH.14800 FOR CONTINUATION SEE DRG. NO. 913/W/SIE/MTR/C31/002 4:11:50 PM 25/11/2013 cyhau PRINTED BY: Default X:\DP\C913\PWY\W\Rev_D\913_W_SIE_MTR_C31_001D.dgn X:\CADD_Library\MicroStation\Workspace\plotdrv\PDF_BW_300dpi_080924.plt T 8283W I/001/019 T 243W T 232W 1 IN 7 LH T/O T 8282W T 241W 1 IN 7 LH T/O CH.13531 T 244W RMJ1/003 RMJ2/004 CH.14300 WCH DEPOT SHUNT DN OCP LH T/O CH.13600 LH T/O 1 IN 7 I/001/007 CH.13700 1 IN 7 T 8288W SLIP I/001/008 CH.13800 SINGLE RMJ1/002 NON-BALLASTED BCT TRACKFORM CH.13852.468 RH T/O DN T 8284W - C32/017 (W/O BEARERS) CH.0 1 IN 7 1 IN 7 1 IN 7 LH T/O I/001/009 CH.100 FUTURE I/001/010 CH.235 T 8286W NON-BALLASTED BCT TRACKFORM CH.14300 CH.279.432 1 IN 7 RH T/O I/001/011 CH.346 I/001/012 CH.358.478 CH.14400 CH.14470.518 I/001/012A CH.14500 SIL(W) CH.14600 CH.14597.007 FUTURE CH.14700 CH.14800 NON-BALLASTED BCT TRACKFORM C VIADUCT TURNOUT SLAB TURNOUT SLAB CH.14310.898 VIADUCT VERIFIED ON SITE. ADMIRALTY TO WONG CHUK HANG PROJECTS DIVISION CIVIL & PLANNING DEPARTMENT MTR CORPORATION LIMITED 2008 COPYRIGHT IN A ISSUE FOR CONSTRUCTION KLT 08FEB12 DE BY DATE APPROVED RESPECT OF THIS DRAWING / DOCUMENT IS OWNED BY THE MTR CORPORATION LIMITED OF HONG KONG. NO REPRODUCTION OF THE DRAWING / DOCUMENT OR ANY PART REV DESCRIPTION BY DATE APPROVED REV DESCRIPTION BY WHATEVER MEANS IS PERMITTED WITHOUT THE PRIOR WRITTEN CONSENT OF THE MTR CORPORATION LIMITED. SCALE CADD REF. 913_W_SIE_MTR_C31_001D.dgn DRAWING NO. NTS REV. 913/W/SIE/MTR/C31/001 D NOTES 1. FOR GENERAL NOTES AND LEGEND, REFER TO DRAWING NO. 904 903 913/W/SIE/MTR/C01/001. NON-BALLASTED BCT TRACKFORM HORSESHOE TUNNEL CUT & COVER TUNNEL 2. CHAINAGES SHOWN FOR TURNOUTS VIADUCT VIADUCT (AP LEI CHAU BRIDGE) ARE AT TANGENT POINTS (TC). STATION NON-BALLASTED NON-BALLASTED RECTANGULAR TUNNEL BCT TRACKFORM WEB SUPPORTED NON-BALLASTED BCT TRACKFORM DRAWING REFERENCE: CH.14800 CH.14900 CH.15000 CH.15100 CH.15200 CH.15300 CH.15344 CH.15338 CH.15400 CH.15584 CH.15578 CH.15500 I/002/001 CH.15600 I/002/002 CH.15755 CH.15800 I/002/003 CH.15700 TRACKFORM I/002/004 CH.15900 I/002/005 CH.16000 CH.16100 CH.16007.056 BASEPLATE I/002/006 NON-BALLASTED BCT TRACKFORM VOLUME 2 : SCHEMATICS INTERFACE SCHEDULE - C31/011 & BUFFER STOP SCHEDULE VOLUME 4 : JUNCTION LAYOUT DN TURNOUT - C33/001 TO C33/009 RMJ2/008 RMJ2/006 VOLUME 5 : STANDARD DETAILS TUNNEL LET PORTAL TWIN TRACK HORSESHOE RMJ2/007 - C32/001 TUNNEL BCT RMJ2/005 UP HORSESHOE TUNNEL - C32/002 WEB SUPPORTED BASEPLATE TRACKFORM NON-BALLASTED TRACKFORM CUT & COVER TUNNEL VIADUCT (AP LEI CHAU BRIDGE) VIADUCT STATION NON-BALLASTED BCT TRACKFORM CH.14800 CH.14900 CH.15000 CH.15100 CH.15200 CH.15300 CH.15342 CH.15336 CH.15400 CH.15500 CH.15576 NON-BALLASTED BCT TRACKFORM BCT TRACKFORM BASEPLATE HORSESHOE TUNNEL FOR CONTINUATION SEE DRG. NO. 913/W/SIE/MTR/C31/001 RECTANGULAR TUNNEL WEB SUPPORTED CH.15582 CH.15600 CH.15700 CH.15755 CH.15800 CH.15900 CH.16000 NON-BALLASTED BCT TRACKFORM NON-BALLASTED MATCH LINE MATCH LINE NON-BALLASTED BCT TRACKFORM SEE BELOW FOR CONTINUATION CH.16100 CH.16005.872 C BCT TRACK AT - C32/003 BAV GARAGE HORSESHOE TUNNEL BCT STATION BCT - C32/004 - C32/005 & 006 STATION FST - C32/007 RECTANGULAR TUNNEL BCT - C32/008 VIADUCT BCT - C32/010 & 011 ELEVATED BOX FST - C32/012 HORSESHOE TUNNEL - C32/015 TURNOUT SLAB VIADUCT TURNOUT SLAB - C32/016 (W/BEARERS) CUT & COVER HORSESHOE TUNNEL VIADUCT TURNOUT SLAB - C32/017 (W/O BEARERS) RECTANGULAR TUNNEL TURNOUT SLAB TRACKFORM NON-BALLASTED BCT TRACKFORM FST TRACKFORM I/002/008 CH.16100 CH.16300 CH.16300 CH.16200 CH.16400 CH.16400 CH.16500 CH.16600 CH.16700 CH.16713.177 I/002/007 CH.16800 CH.16842.191 CH.16887.689 I/002/009 I/002/012 CH.16900 CH.16964.123 STATION NON-BALLASTED CH.16972.123 NON-BALLASTED BCT TRACKFORM DN T 8484W 1 IN 10.5 T 8482W RH T/O 1 IN 10.5 B3/03 RH T/O SOH 1 IN 10.5 1 IN 10.5 RH T/O LH T/O T 8481W UP NON-BALLASTED TURNOUT SLAB CUT & COVER FILENAME: MODELNAME: CH.16100 CH.16200 NON-BALLASTED BCT TRACKFORM TRACKFORM HORSESHOE TUNNEL MATCH LINE BCT TRACKFORM STATION NON-BALLASTED FST TRACKFORM DRAWN TITLE KLT DESIGNED ML CHECKED BT APPROVED DE PL CONTRACT 913 TRACK SCHEMATICS SOUTH ISLAND LINE (EAST) ORIGINATOR C TRACKFORM TYPE REVISED TIM 19NOV13 CK B TYPO CORRECTED KLT 29JUL13 CK DATE 08/02/2012 DO NOT SCALE DRAWINGS. ALL DIMENSIONS SHALL BE PLOT DRV: CH.16500 CH.16600 CH.16700 CH.16718.642 CH.16800 I/002/010 RECTANGULAR TUNNEL SEE ABOVE FOR CONTINUATION I/002/011 CH.16832.250 CH.16895.017 CH.16900 CH.16971.480 T 8483W CH.16979.480 10:32:33 AM 19/11/2013 cyhau PRINTED BY: Default X:\DP\C913\PWY\W\Rev_C\913_W_SIE_MTR_C31_002C.dgn\913_W_SIE_MTR_C31_002C.dgn X:\CADD_Library\MicroStation\Workspace\plotdrv\PDF_BW_300dpi_080924.plt B3/04 VERIFIED ON SITE. WONG CHUK HANG TO SOUTH HORIZONS PROJECTS DIVISION CIVIL & PLANNING DEPARTMENT MTR CORPORATION LIMITED 2008 COPYRIGHT IN A ISSUE FOR CONSTRUCTION KLT 08FEB12 CK BY DATE APPROVED RESPECT OF THIS DRAWING / DOCUMENT IS OWNED BY THE MTR CORPORATION LIMITED OF HONG KONG. NO REPRODUCTION OF THE DRAWING / DOCUMENT OR ANY PART REV DESCRIPTION BY DATE APPROVED REV DESCRIPTION BY WHATEVER MEANS IS PERMITTED WITHOUT THE PRIOR WRITTEN CONSENT OF THE MTR CORPORATION LIMITED. SCALE CADD REF. 913_W_SIE_MTR_C31_002C.dgn DRAWING NO. NTS REV. 913/W/SIE/MTR/C31/002 C Appendix 2 Results of Performance Test for Trackforms
© Copyright 2025 ExpyDoc