Detailed Steam Price Calculations February 2014 (Questions? Call 503-464-7491) Monthly Steam Pricing A B C E = A XC + B XD D G Conversion Factor Curve Date Year F H= E XF XG Service Factor MWh Lost per Thousand % of Steam Month On-Peak Off-Peak % On % Off LBS of Steam Flat from Co-Generation I J= H+ I K = 10% X J L = J+K O&M Steam Agency including Cost Fee Price $ per 1,000 LBS of Steam $5.60 $5.55 $5.52 $5.51 Auxilary Boiler Fuel 2013 Nov 10/15/2013 $38.75 $32.50 56% 44% $36.00 0.1016 75% $2.74 $2.34 $5.09 $0.51 2013 Dec 11/15/2013 $39.00 $31.00 56% 44% $35.48 0.1016 75% $2.70 $2.34 $5.05 $0.50 2013 Jan 12/16/2013 $43.00 $34.75 56% 44% $39.37 0.1016 75% $3.00 $2.02 $5.02 $0.50 2014 Feb 01/15/2014 $40.00 $35.75 56% 44% $38.13 0.1016 75% $2.91 $2.10 $5.01 $0.50 Quarterly Steam Pricing A B C D Curve Month F G H= E XF XG Conversion Factor Service Factor Date Year E = A XC + B XD MWh Lost per Thousand % of Steam On-Peak Off-Peak % On % Off Flat LBS of Steamfrom CoGeneration I J = H + I K = 10% X JL O&M Steam Agency including Cost Fee Auxilary Boiler Fuel 2013 Oct 09/15/2013 $40.75 $28.25 56% 44% $35.25 0.1016 75% $2.69 $2.34 $5.03 $0.50 2013 Nov 09/15/2013 $34.05 $28.75 56% 44% $31.72 0.1016 75% $2.42 $2.34 $4.76 $0.48 2013 Dec 09/15/2013 $37.85 $31.75 56% 44% $35.17 0.1016 75% $2.68 $2.34 $5.02 $0.50 2014 Jan 12/16/2013 $43.00 34.75 56% 44% $39.37 0.1016 75% $3.00 $2.02 $5.02 $0.50 2014 Feb 12/16/2013 $39.25 33.50 56% 44% $36.72 0.1016 75% $2.80 $2.02 $4.82 $0.48 2014 Mar 12/16/2013 $36.50 31.00 56% 44% $34.08 0.1016 75% $2.60 $2.02 $4.62 $0.46 = J+K Price $ per 1,000 LBS of Steam $5.53 $5.24 $5.53 $5.52 $5.30 $5.08 Notice of Update to Operations and Maintenance Cost As of 1-15-2014 The calculation of the OMC is provided in Attachment 1 and effective with this posting, replacing a preliminary calculation used for January 2014. Capital for the Reverse Osmosis system is to be recovered over a 5 year period rather than the 40 years used in the preliminary calculation. Three categories of operations and maintenance (OM) costs are included in the OMC: 1) OM costs that are common to both types of steam produced—from Unit 1 (gas turbine) cogeneration and the auxiliary boiler, 2) OM costs that are only for cogeneration, and 3) OM costs that are only for the auxiliary boiler. A significant item included in number three above, is the cost of gas (priced at 3.19 per mmbtu) used to produce steam with the auxiliary boiler. These costs are summed up for steam produced by both cogeneration and the auxiliary boiler to $.60 per thousand pounds steam and $6.60 per thousand pounds of steam respectively. To arrive at overall OMC for steam production, these amounts are weighted at 75% and 25% respectively to reflect expected amounts of steam from the two sources and consistent with the Service Factor in the Agreement. The overall OMC from these calculations is: $2.10 per thousand pounds of steam. Your overall steam price will be updated monthly per the applicable Agreement using the resulting OMC. Please contact me at 503-464-7491 with questions regarding this Notice. Attachment 1: Calculation of 2014 O & M Price Co-Generation Category 1: Water $ 0.27 Aux $ 0.27 Price for Makeup Water + Price for Makeup Water Chemicals + Water Train Maintenance Cost (=Calculations!D11) PGE Steam Distribution System O&M / (Average Hourly Steam Requirements x Annual Steam System Service) Category 1: PGE Steam Distribution System O&M $ 2 Category 1: Cost Recovery of Capital Investment . $ 0.03 $ 0.03 (Capital Investment in Cogen Facility x Capital Recovery Rate+RO Recovery) / (Annual Steam System Service hours x 0.27 Steam Production Capabilities 0.27 $ Subtota l Common Costs $ 0.57 $ Category 2: Steam pH control $ 0.03 Subtota l Co-Ge n Only Costs Category 3: Other Auxiliary Boiler Operating Cost $ 0.03 0.57 (Amine Feed x Cost of Amine x Specific Gravity of Amine) / Average Daily Steam Sales $ 0.14 ((Annual Operating Cost for Aux Boiler + Annual Aux Boiler Electrical Load x Market Price of Power (Flat))/ Annual Average Steam Sales*.25 Annual Maintenance Cost of Aux Boiler for all Steam Production / (Annual Average Steam Sales*.25) Category 3: Auxilary Boiler Maintenance $ 0.70 (Gas Commodity Price + Gas Transportation + Var Gas Transportation) x (Gas MMbtu per 1000 LBS of Steam at Coyote Springs) / CS Aux Boiler Efficiency Category 3: Gas Auxilary Boiler $ Subtota l Aux Boile r Only Costs Total Percent of Steam $ 0.60 75% Weighted Contribution to O & M $ 0.45 1. Based on a gas price of: 2. Includes an annual charge of $183,944 through January 2019 (5 year recovery). $ 3.19 5.18 Gas MMbtu per 1,000 LBS of Steam at Coyote Springs=1.173 $ $ 6.03 6.60 25% $ 1.65 $ Total O & M 2.10
© Copyright 2024 ExpyDoc