Page 1 of 3 Scrutiny Reports 10/7/2014 http://61.12.126.108:5050

Scrutiny Reports
Page 1 of 3
Report Generated On: 07-10-2014
Deviation List Report
Version Number: 1.0.35
www.bhopalmunicipal.com
Proposal Information (Table 1)
Plot Details (Table A)
Project Details (Table B)
Plot Number
Location Name
Special Location
Name of Architect
Name of Owner
Central Area
Others
suchita
SHILPI SISODIYA
Proposal Details (Table C)
Plot Abutting Details (Table D)
Proposal Number
Case Type
Colony Name
Ward
Zone
North
South
East
West
BMC/0655/Z02/W05/2014
NEW
SAHAJ SANGAM BHOPAL
Ward-5
Zone-2
-1 -1 -1 -1 -
Colony data is not verified. Concerned officer to verify colony
data.
User Inputs (Parameters of Approved Layout / Khasara Map) (Table 2)
Name
Description
Input
Approved
BUP Area
0.00
Layout
FAR Factor
1.25
Ground Coverage
30.00
Recretional Ground
0.00
Area
Building Height
0.00
Amenity
0.00
Area of Road
40.32
Widening
Means of access width
7.50
Net Plot Area
7239.69
B/UP Area Existing
0.00
Structure
Front Margin
0.00
Rear Margin
0.00
Side1 Margin
0.00
Side2 Margin
0.00
Proposal
Plot Width
47.40
Details
Plot Depth
18.63
Road Frontage
47.40
Sensitive Zone
No
Heritage Area
No
Building
Use
Residential
Details
Residential
Sub-Use
(Dwelling)
LowRise Type
Detached House
http://61.12.126.108:5050/autodcr/Reports/NTSReports/ScrutinyReports.aspx?iProposalID... 10/7/2014
Scrutiny Reports
Bed/Seat Capacity
Name
Plot Details
PLOT
Page 2 of 3
0
Description
Permissible Plot Width
Permissible Plot Depth
Building Height
BLOCK NO 3 (RESI BULDING) Height (According to Master Plan)
Reqd/Perm Proposed Status
47.40
18.63
91.48
81.43
Deviation
Deviation
14.50
18.00
Deviation
Total Number of WCs are 60.
Disclaimer:
AutoDCR is an input based software tool used by Municipal Corporations but the final approval lies with concerned
Officer / Authority.
Rules
Topic
Rule
Plot Level
Abutting
For Group Housing Required width is 24 m. {as per BVN 2012}
Road
Consumed
Permissible FSI is 1.25 {as per BVN 2012}
FAR
Coverage
Permissible coverage should be 33.5% of plot Area. {as per BVN 2012}
Area
FAR Area Permissible FSI is 1.25 {as per BVN 2012}
Frontage 47.40
Road
Parking
For Residential, Per 100 sqm of BUA 1 Car required.
Tank
Tenement x 675
Building Level
Building
Maximum permissible building height is 14.5m {as per BVN 2012}
Height
Floor
(1) Parapet walls on terraces shall not be less than 1.05m in height. As per[Bhumi-Vikas Niyam- regulation
Height
no.-66,67]
(2) For Residential/Commercial/Agriculture use min required floor height is 2.60 m. As per[Bhumi-Vikas
Niyam- regulation no.-66,67]
(3) Minimum required floor height Basement floor is 2.40 m. As per[Bhumi-Vikas Niyam- regulation no.66,67]
Inner
For The whole of one side of every room excepting bath, water closet and store room and not abutting on
Chowk
either the front, rear or side (s) open spaces shall abut on an inner courtyard, whose minimum width shall be
3.00 m. Inner chowk shall have an area, throughout its height, of not less than square of one-fifth of the height
of the highest wall abutting the courtyard.
Lift Count Minimum 2 lifts required if Building Height is greater than 15m. As per [Bhumi-Vikas Niyam- Regulation
C1.80]
Passage
No Rule applicable. (Bhumi-Vikas Niyam - Regulation 82-VIII)
Sanitation (1) 1 WC required for every tenement.
(2) 1 Bathroom required for every tenement.
Ventilation For Height of building from 12.51 to 18.00 m Size of ventilation shaft is 4.00m and Minimum size of shaft
Shaft
1.50m. As per [Bhumi-Vikas Niyam- Regulation C1.56]
The above report generated is subjected to the following manual verification done by the concerned officer
1.
Input details/road widening etc are checked with the sanctioned layout and verified that the same are drawn in
preDCR layer.
http://61.12.126.108:5050/autodcr/Reports/NTSReports/ScrutinyReports.aspx?iProposalID... 10/7/2014
Scrutiny Reports
Page 3 of 3
The shape, size and dimension drawn for the plot in preDCR layers are verified with the layout plan and actual site
condition.
3. The minimum plot area considered for calculation in autoDCR is verified with all the documental areas.
4. The report is checked for all failed entities by concerned of
2.
http://61.12.126.108:5050/autodcr/Reports/NTSReports/ScrutinyReports.aspx?iProposalID... 10/7/2014