Details of Transmission Lines in Garhwal as on 31-05-2014

Details of Transmission Lines in Garhwal as on 31-05-2014
Sl.
No.
Name of the Transmission Line
Voltage
level (KV)
S/C or
D/C
Line
Length
(Ckt Km)
Conductor
type
Date of
Commissioning
1
400 KV Rishikesh – Moradabad
Line
400KV
S/C
157
Moose
1983
2
400 KV Rishikesh – Puhana
(PGCIL) Muzaffarnagar
400 KV
S/C
112
Moose
31.03.1984
3
220 KV Chhibro- Khodri I Ckt.
220KV
S/C
5.771
Deer
1973
4
220 KV Chhibro- Khodri II Ckt.
220KV
S/C
8.596
Deer
1975
5
220 KV Khodri-Rishikesh
220KV
S/C
79.63
Deer
31.03.1976
6
220 KV Rishikesh-SIDCUL
( Haridwar)
220KV
S/C
24.53
ACSR- Deer
17.09.1979
7
220 KV Rishikesh - Chamba
220KV
S/C
40.5
ACSR Zebra
31.03.1983
8
220 KV Chamba-Dharasu
220KV
S/C
38.558
ACSR Zebra
31.03.1983
9
220 KV Dharasu-Uttarkashi-I
220KV
S/C
25
ACSR Zebra
22.03.1986
10
220 KV Dharasu - Uttarkashi-II
220KV
S/C
24.7
ACSR Zebra
22.03.1986
11
220 KV Rishikesh- Dharasu-I
220KV
S/C
79.958
ACSR Zebra
22.03.1986
12
220 KV Haridwar-Puhana
220 KV
S/C
23.31
ACSR-Deer
17.09.1979
13
220 KV Puhana-Roorkee
220 KV
S/C
16
ACSR-Deer
17.09.1979
14
66 KV Roorkee-Pathri-I
66KV
S/C
20.68
ACSR-Dog
1956
15
66 KV Roorkee-Pathri-II
66KV
S/C
20.68
ACSR-Dog
1956
16
132 KV Roorkee-Saharanpur
132KV
S/C
30.72
ACSRPanther
1958
Sl.
No.
Name of the Transmission Line
Voltage
level (KV)
S/C or
D/C
Line
Length
(Ckt Km)
Conductor
type
Date of
Commissioning
17
132 KV Roorkee-Manglore
132KV
S/C
13.89
ACSR-Wolf
1959
18
132 KV Roorkee-Laksar
132KV
S/C
26.5
ACSR-Wolf
1959
19
132 KV Rishikesh-Majra
132KV
S/C
41.14
ACSRPanther
22.08.1966
20
132 KV Dhalipur-Dhakrani
132KV
S/C
6.6
ACSRPanther
1966
21
132 KV Khodri - Dhakrani
132KV
S/C
22.77
ACSRPanther
30.04.1972
22
132 KV Dhalipur-Kulhal
132KV
S/C
44.61
ACSRPanther
30.04.1972
23
132 KV Jwalapur-Chilla
132KV
D/C
16.89
ACSRPanther
12.08.1973
24
132 KV Majra-Kulhal-II
132KV
S/C
44.29
ACSRPanther
16.04.1976
25
132 KV Roorkee-Jwalapur
132KV
S/C
26.57
ACSRPanther
07.12.1978
26
132 KV Jwalapur-Rishikesh
132KV
S/C
22.97
ACSRPanther
09.01.1979
27
132 KV RoorkeeSIDCUL(Haridwar)
132KV
S/C
31.15
ACSRPanther
17.09.1979
28
132 KV Rishikesh-Srinagar
132KV
S/C
78
ACSRPanther
30.06.1980
29
132 KV Majra-Purkul
132KV
S/C
22.77
ACSRPanther
27.03.1983
30
132 KV Rishikesh-Bindal
132KV
S/C
44.73
ACSRPanther
31.03.1983
31
132 KV Majra-Kulhal-I
132KV
S/C
41.77
ACSRPanther
31.03.1983
32
132 KV Dhalipur-Purkul
132KV
S/C
13.96
ACSRPanther
03.03.1984
33
132 KV Bindal-Majra
132KV
D/C
8.54
ACSRPanther
31.03.1992
Sl.
No.
Name of the Transmission Line
Voltage
level (KV)
S/C or
D/C
Line
Length
(Ckt Km)
Conductor
type
Date of
Commissioning
34
132 KV Chilla-Nazibabad
132KV
S/C
53.134
ACSRPanther
16.06.1995
35
132 KV Najibabad-Kotdwar
132KV
S/C
23.78
ACSRPanther
16.06.1995
36
132 KV Jwalapur-Bhupatwala
132KV
S/C
10.27
ACSRPanther
02.12.2003
37
132 KV Chilla-BPT – Rishikesh
132KV
S/C
53.13
ACSRPanther
02.12.2003
38
LILO OF 220 KV Rishikesh –
Muzaffarnagar line at 220 KV S/s
Roorkee
220 KV
D/C
0.1
ACSR Zebra
11.02.2005
39
220 KV Railway Traction (2 phase)
220 KV
S/C
4.8
ACSR Zebra
15.07.2005
40
132 KV Roorkee-Bhagwanpur
132KV
S/C
20.14
ACSRPanther
24.05.2006
41
132 KV Bhagwanpur-Saharanpur
132 KV
S/C
26.62
ACSRPanther
24.05.2006
42
132 KV Manglore – Nehtaur line
132 KV
S/C
73.73
ACSRPanther
26.10.2006
43
132 KV Manglore-AIS-I line
132KV
S/C
7
ACSRPanther
27.10.2006
44
132 KV Manglore-AIS-II line
132KV
S/C
7
ACSRPanther
27.11.2006
45
220 KV Rishikesh-Dharasu- II
220KV
S/C
80.4
ACSR Zebra
23.04.2009
46
220 KV Chamba-Ghansali
220KV
S/C
35.785
ACSR Zebra
30.09.2009
47
LILO of 220 KV Roshnabad –
Roorkee line at 400 KV S/s
Puhana
220 KV
D/C
10
ACSR
Panther
24.11.2010
48
220 KV Ghansali-Bhilangana line
220 KV
D/C
39
ACSR Zebra
21.10.2011
49
132 KV Jwalapur
(Haridwar) line
132KV
S/C
0.12
ACSRPanther
05.06.2007
50
LILO of 132 KV Roorkee –
Nehtaur line at 132 KV S/s Laksar
132 KV
D/C
6
ACSR
Panther
16.07.2007
-
SIDCUL
Sl.
No.
Name of the Transmission Line
Voltage
level (KV)
S/C or
D/C
Line
Length
(Ckt Km)
Conductor
type
Date of
Commissioning
51
132 KV Laksar-Nehtaur line
132 KV
S/C
53.5
ACSR
Panther
18.07.2007
52
132 KV Laksar-RBNS Sugar Mill
line
132KV
S/C
4.2
ACSRPanther
01.04.2008
53
132 KV Kotdwar - Satpuli line
132KV
S/C on
D/C
46.7
ACSRPanther
28.01.2010
54
LILO of Rishikesh – Srinagar line
at 132 KV S/s Srinagar line
132 KV
D/C
3.286
ACSR
Panther
Dec. 2011
55
LILO of 220 KV Khodri-Rishikesh
line at 220 KV S/s Dehradun
220 KV
D/C
4.6
ACSR Zebra
30.01.2014
56
132 KV Satpuli-Srinagar Line
132 KV
D/C
104.8
ACSR
Panther
25.02.2013
Gross Line Length in Circuit Kms. as on 31.05.2014
1882.878