Details of Transmission Lines in Garhwal as on 31-05-2014 Sl. No. Name of the Transmission Line Voltage level (KV) S/C or D/C Line Length (Ckt Km) Conductor type Date of Commissioning 1 400 KV Rishikesh – Moradabad Line 400KV S/C 157 Moose 1983 2 400 KV Rishikesh – Puhana (PGCIL) Muzaffarnagar 400 KV S/C 112 Moose 31.03.1984 3 220 KV Chhibro- Khodri I Ckt. 220KV S/C 5.771 Deer 1973 4 220 KV Chhibro- Khodri II Ckt. 220KV S/C 8.596 Deer 1975 5 220 KV Khodri-Rishikesh 220KV S/C 79.63 Deer 31.03.1976 6 220 KV Rishikesh-SIDCUL ( Haridwar) 220KV S/C 24.53 ACSR- Deer 17.09.1979 7 220 KV Rishikesh - Chamba 220KV S/C 40.5 ACSR Zebra 31.03.1983 8 220 KV Chamba-Dharasu 220KV S/C 38.558 ACSR Zebra 31.03.1983 9 220 KV Dharasu-Uttarkashi-I 220KV S/C 25 ACSR Zebra 22.03.1986 10 220 KV Dharasu - Uttarkashi-II 220KV S/C 24.7 ACSR Zebra 22.03.1986 11 220 KV Rishikesh- Dharasu-I 220KV S/C 79.958 ACSR Zebra 22.03.1986 12 220 KV Haridwar-Puhana 220 KV S/C 23.31 ACSR-Deer 17.09.1979 13 220 KV Puhana-Roorkee 220 KV S/C 16 ACSR-Deer 17.09.1979 14 66 KV Roorkee-Pathri-I 66KV S/C 20.68 ACSR-Dog 1956 15 66 KV Roorkee-Pathri-II 66KV S/C 20.68 ACSR-Dog 1956 16 132 KV Roorkee-Saharanpur 132KV S/C 30.72 ACSRPanther 1958 Sl. No. Name of the Transmission Line Voltage level (KV) S/C or D/C Line Length (Ckt Km) Conductor type Date of Commissioning 17 132 KV Roorkee-Manglore 132KV S/C 13.89 ACSR-Wolf 1959 18 132 KV Roorkee-Laksar 132KV S/C 26.5 ACSR-Wolf 1959 19 132 KV Rishikesh-Majra 132KV S/C 41.14 ACSRPanther 22.08.1966 20 132 KV Dhalipur-Dhakrani 132KV S/C 6.6 ACSRPanther 1966 21 132 KV Khodri - Dhakrani 132KV S/C 22.77 ACSRPanther 30.04.1972 22 132 KV Dhalipur-Kulhal 132KV S/C 44.61 ACSRPanther 30.04.1972 23 132 KV Jwalapur-Chilla 132KV D/C 16.89 ACSRPanther 12.08.1973 24 132 KV Majra-Kulhal-II 132KV S/C 44.29 ACSRPanther 16.04.1976 25 132 KV Roorkee-Jwalapur 132KV S/C 26.57 ACSRPanther 07.12.1978 26 132 KV Jwalapur-Rishikesh 132KV S/C 22.97 ACSRPanther 09.01.1979 27 132 KV RoorkeeSIDCUL(Haridwar) 132KV S/C 31.15 ACSRPanther 17.09.1979 28 132 KV Rishikesh-Srinagar 132KV S/C 78 ACSRPanther 30.06.1980 29 132 KV Majra-Purkul 132KV S/C 22.77 ACSRPanther 27.03.1983 30 132 KV Rishikesh-Bindal 132KV S/C 44.73 ACSRPanther 31.03.1983 31 132 KV Majra-Kulhal-I 132KV S/C 41.77 ACSRPanther 31.03.1983 32 132 KV Dhalipur-Purkul 132KV S/C 13.96 ACSRPanther 03.03.1984 33 132 KV Bindal-Majra 132KV D/C 8.54 ACSRPanther 31.03.1992 Sl. No. Name of the Transmission Line Voltage level (KV) S/C or D/C Line Length (Ckt Km) Conductor type Date of Commissioning 34 132 KV Chilla-Nazibabad 132KV S/C 53.134 ACSRPanther 16.06.1995 35 132 KV Najibabad-Kotdwar 132KV S/C 23.78 ACSRPanther 16.06.1995 36 132 KV Jwalapur-Bhupatwala 132KV S/C 10.27 ACSRPanther 02.12.2003 37 132 KV Chilla-BPT – Rishikesh 132KV S/C 53.13 ACSRPanther 02.12.2003 38 LILO OF 220 KV Rishikesh – Muzaffarnagar line at 220 KV S/s Roorkee 220 KV D/C 0.1 ACSR Zebra 11.02.2005 39 220 KV Railway Traction (2 phase) 220 KV S/C 4.8 ACSR Zebra 15.07.2005 40 132 KV Roorkee-Bhagwanpur 132KV S/C 20.14 ACSRPanther 24.05.2006 41 132 KV Bhagwanpur-Saharanpur 132 KV S/C 26.62 ACSRPanther 24.05.2006 42 132 KV Manglore – Nehtaur line 132 KV S/C 73.73 ACSRPanther 26.10.2006 43 132 KV Manglore-AIS-I line 132KV S/C 7 ACSRPanther 27.10.2006 44 132 KV Manglore-AIS-II line 132KV S/C 7 ACSRPanther 27.11.2006 45 220 KV Rishikesh-Dharasu- II 220KV S/C 80.4 ACSR Zebra 23.04.2009 46 220 KV Chamba-Ghansali 220KV S/C 35.785 ACSR Zebra 30.09.2009 47 LILO of 220 KV Roshnabad – Roorkee line at 400 KV S/s Puhana 220 KV D/C 10 ACSR Panther 24.11.2010 48 220 KV Ghansali-Bhilangana line 220 KV D/C 39 ACSR Zebra 21.10.2011 49 132 KV Jwalapur (Haridwar) line 132KV S/C 0.12 ACSRPanther 05.06.2007 50 LILO of 132 KV Roorkee – Nehtaur line at 132 KV S/s Laksar 132 KV D/C 6 ACSR Panther 16.07.2007 - SIDCUL Sl. No. Name of the Transmission Line Voltage level (KV) S/C or D/C Line Length (Ckt Km) Conductor type Date of Commissioning 51 132 KV Laksar-Nehtaur line 132 KV S/C 53.5 ACSR Panther 18.07.2007 52 132 KV Laksar-RBNS Sugar Mill line 132KV S/C 4.2 ACSRPanther 01.04.2008 53 132 KV Kotdwar - Satpuli line 132KV S/C on D/C 46.7 ACSRPanther 28.01.2010 54 LILO of Rishikesh – Srinagar line at 132 KV S/s Srinagar line 132 KV D/C 3.286 ACSR Panther Dec. 2011 55 LILO of 220 KV Khodri-Rishikesh line at 220 KV S/s Dehradun 220 KV D/C 4.6 ACSR Zebra 30.01.2014 56 132 KV Satpuli-Srinagar Line 132 KV D/C 104.8 ACSR Panther 25.02.2013 Gross Line Length in Circuit Kms. as on 31.05.2014 1882.878
© Copyright 2024 ExpyDoc