DRI WASTE (CHAR) UTILIZATION IN POWER

DRI WASTE (CHAR) UTILIZATION IN
POWER PLANT TO REDUCE POWER
GENERATION COST
BY T.M. DANDAPAT
9/29/2014
1
TATA SPONGE
DRI PRODUCTION 390,000 MT PER ANNUM FROM 3
KILNS & 26 MW OF POWER PLANT
DRI UNIT
26 MW POWER PLANT
9/29/2014
22
Location
TATA SPONGE IRON LTD.
Corporate Office
Bhubaneswar Office
Coal Block in Angul
TATA SPONGE IRON LTD.
 In the Orissa province (Eastern part of India)
 275 KMs from the State Capital
 Remote mining cum agriculture area
9/29/2014
3
TATA SPONGE
An associate company of
Tata Steel Ltd., in the
business of manufacturing
of sponge iron. Based in
Joda, in the district of
Keonjhar, Odisha.
9/29/2014
44
INTRODUCTION
IN DRI (SPONGE IRON ) PRODUCTION
• RAW MATERIAL :
A) IRON ORE
B) NON COKING COAL
C) DOLOMITE
• PRODUCTS:
A) SPONGE IRON (DRI)
B) POWER FROM WASTE HEAT (WHRB)
• SOLID WASTE:
A) COAL CHAR ,
B) DE – DUST,
C) FLY ASH,
9/29/2014
5
FLOW CHART OF THE DRI PROCESS
BA
GIL
TE
RS
DE
DUST
9/29/2014
6
GENERATION OF SOLID WASTE
0.15 MT CHAR 30%
0.08MT DE DUST 16%
PER TON OF DRI SOLID
WASTE GENERATION IS
0.5 MT
0.225 MT FLY ASH 45%
0.045 MT OTHERS 9%
9/29/2014
7
KILN’S SOLID WASTE BREAKUP %
9
16
45
30
FLY ASH
CHAR
DE DUST
9/29/2014
OTHERS
8
COOLER DISCHARGE CHAR & DE DUST
• IN DRI MAKING THROGUH ROTARY KILNS
NON MAGNETIC CHAR CONTAINS ALONG
WITH FINISHED PRODUCT.
• THIS NON MAGNETC CHAR HAVING GOOD F.C
& GCV.
• CHAR IS 30% OF TOTAL SOLID WASTE
• DE DUST 16% OF TOTAL SOLID WASTE
HAVING GOOD F.C & GCV
9/29/2014
9
SIZE ANALYSIS in %
+6mm
-6 +3mm 0 – 3mm
12.3
22.2
65.5
CHAR
SIZE ANALYSIS in %
75 Mesh
25
-75 to 100 Mesh
75
DE DUST
9/29/2014
10
IN PUT COAL ANALYSIS
COAL SOURCE
V.M %
ASH %
F.C %
GCV Kilo
Calories/Kg.
IMPORTED
COAL S.A
25 - 27
14 - 16
57 - 60
6500 - 6700
INDIGENIOUS
COAL
25 - 26
26 - 30
45 - 48
5000 - 5500
SOLID WASTE CHAR & DE DUST ANALYSIS
V.M %
ASH %
F.C %
GCV Kilo
Calories/Kg.
CHAR
1–2
55 - 60
35 - 40
3200 - 3400
DE DUST
2–4
60 - 65
30 - 35
2800 - 3000
9/29/2014
11
COMPARISION OF THE F- GRADE COAL
WITH
CHAR & DE DUST
TYPEOF FUEL
V.M
ASH
F.C
GCV
K.Cal./Kg.
F – GRADE COAL
25 - 28
35 -40
30 - 35
3000 -3200
CHAR
1–2
55 - 60
35 - 40
3200 - 3400
DE -DUST
2–4
60 - 65
30 - 35
2800 - 3000
9/29/2014
12
• DEVELOPED A VALUE ADDED PRODUCT FROM SOLID
WASTE, CHAR IS BEING UTILISED AS FUEL IN CFBC /
AFBC BOILERS FOR POWER GENERATION
• DE – DUST GENERATES THROUGH BAG FILTERS FROM
FINISHED PRODUCT CIRCUITS AND IT CONTAINS
GOOD CARBON IN PULVERISED CONDITION (-75 to
100 MESH). IS ALSO BEING USED IN CFBC BOILERS
(10% MIXED WITH F – GRADE COAL 50 & 40% CHAR)
9/29/2014
13
FUEL REQUIREMENT FOR POWER GENERATION THROUGH
AFBC BOILERS (100% F –Grade coal @ Rs.3000/MT)
TYPE OF
BOILER
AFBC
15 MW
AFBC
25 MW
BOILER
CAPACITY
MAIN STEAM
PRESSURE
70 TPH
60Kgf/cm2
110 TPH
60Kgf/cm2
MAIN
STEAM
TEMP.
COAL
REQUIREQUI
REMENT
PER HOUR.
FUEL
REQUIREM
ENT PER
DAY
500 0C
17 MT
410 MT
12.3
732
500 0C
27 MT
648 MT
19.44
736
9/29/2014
FUEL COST
PER DAY
(Rs. Laks)
COST OF
STEAM PER
MT
(Rs.)
14
FUEL REQUIREMENT FOR POWER GENERATION THROUGH
CFBC BOILERS (100% F- GRADE COAL @ Rs.3000/MT )
TYPE OF
BOILER
BOILER
CAPACITY
MAIN
STEAM
PRESSURE
MAIN
STEAM
TEMP.
COAL
FUEL
REQUIRE REQUIRE
QUIREME MENT /
NT /Hr.
DAY
CFBC
15 MW
75 TPH
66Kgf/cm2
480 0C
20 MT
CFBC
25 MW
110 TPH
66Kgf/cm2
480 0C
28 MT
9/29/2014
FUEL
COST
PER DAY
Rs. Laks
COST OF
STEEM
PER TON
(Rs)
480 MT
14.40
800
672 MT
20.16
763
15
FUEL REQUIREMENT FOR POWER GENERATION THROUGH
AFBE BOILERS (15 MW PLANT)
(IN COMBINATION OF F- GRADE COAL AND CHAR)
• CONSIDERING THE STEEM GENERATION FROM 15MW AFBC BOILER
IS 1680 MT
• FUEL COMBINATION IS 60% F- GRADE COAL & 40% CHAR
• REQUIREMENT OF F – GRADE COAL = 24*10.9 =261 MT/DAY
REUIREMENT OF CHAR = 24*8 = 192 MT/DAY
• COST OF THE F-GRADE COAL = 3000*261= Rs.7.83 LAKH
COST OF THE CHAR
= 1300*192= Rs.2.496 LAKH
• TOTAL FUEL COST IS 10.326 LAKHS
• SO THE COST SAVINGS BY USING THE CHAR COMBINATION FUEL
IS = 12.3 – 10.326 = 1.974 LAKH /DAY
9/29/2014
16
FUEL REQUIREMENT FOR POWER GENERATION THROUGH
AFBC BOILERS (60% F –Grade coal @ Rs.3000/MT & 40% char
@Rs.1300/MT)
TYPE OF
BOILER
AFBC
15 MW
AFBC
25 MW
STEAM
GENERATION
/DAY MT
FUEL COST
FOR F-GRADE
COAL 100% IN
(Rs. LAKH)
(A)
FUEL
COST SAVINGS IN
COMBINATION
STEEM /TON
COAL AND CHAR
(Rs.) (C) =A-B
60:40 IN
(Rs.LAKH)
(B)
1680
12.3
10.326
117.50
2640
16.44
16.147
124.74
9/29/2014
17
FUEL REQUIREMENT FOR POWER GENERATION THROUGH
AFBE BOILERS (25 MW PLANT)
(IN COMBINATION OF F- GRADE COAL AND CHAR)
• CONSIDERING THE STEEM GENERATION FROM 25MW AFBC BOILER
IS 2640 MT/DA
• FUEL COMBINATION IS 60% F- GRADE COAL & 40% CHAR
• REQUIREMENT OF F – GRADE COAL = 24*17.4 =417.6 MT/DAY
REUIREMENT OF CHAR = 24*11.6 = 278.4 MT/DAY
• COST OF THE F-GRADE COAL = 3000*417.6= Rs.12.528 LAKH
COST OF THE CHAR
= 1300*278.4= Rs. 3.619 LAKH
• TOTAL FUEL COST IS 16.147 LAKHS
• SO THE COST SAVINGS BY USING THE CHAR COMBINATION FUEL
IS = 19.44 – 16.147 = 3.293 LAKH /DAY
9/29/2014
18
FUEL REQUIREMENT FOR POWER GENERATION THROUGH
AFBC BOILERS (60% F –Grade coal @ Rs.3000/MT & 40% char
@Rs.1300/MT)
TYPE OF
BOILER
CFBC
15 MW
CFBC
25 MW
STEAM
GENERATION
/DAY MT
FUEL COST
FOR F-GRADE
COAL 100% IN
(Rs. LAKH)
(A)
FUEL
COST SAVINGS IN
COMBINATION
STEEM /TON
COAL AND CHAR
(Rs.) (C) =A-B
60:40 IN
(Rs.LAKH)
(B)
1800
14.40
11.136
181.33
2640
20.16
15.590
173.10
9/29/2014
19
YEARLY SAVINGS
•
•
•
•
AFBC 15 MW: 06.31 Cr.
AFBC 25 MW: 10.54 Cr.
CFBC 15 MW: 10.44 Cr.
CFBC 25 MW: 14.62 Cr.
LIST OF THE PARTIES USING CHAR
•
•
•
•
•
•
•
•
M/S ADHUNIC METALIKS Ltd.,
M/S MSP STEEL & POWER LTD.
M/S VISA STEEL LTD.
M/S SHREE GANESH METALIKS LTD
M/S SHYAM METALIKS AND ENERGY LTD
M/S K P TRADING
M/S VIKASH COAL COMPANY
M/S SHREE JAGANNATH METALLIC INDUSTRIES
9/29/2014
21
AN APEAL TO THE GOVT. OF INDIA INORDER TO
DECLARE CHAR IS NOT A WASTE
• IT IS TO BE MANDATED TO UTILISE THE CHAR
GENERATED FROM DRI PLANTS IN AFBC /CFBC
BASED PLANTS.
• ADVISE RAILWAYS TO GIVE SUBSIDY IN
FRAIGHT FOR TRANSPORTING.
• GIVING TAX EXEMPTIONS ON UTILISING THE
CHAR IN POWER PLANTS.
9/29/2014
22
• CONSERVE NATURAL RESOURCES BY USING
CHAR GENERATED FROM COAL BASED DRI
PLANTS IN AFBC / CFBC BOILER BASED POWER
PLANT WHICH OTHERWISE CALLED AS WASTE.
• GENERATE WEALTH FROM CHAR (ENERGY
SOURCE) WHICH OTHERWISE DECLARED AS
WASTE
9/29/2014
23
CORPORATE OFFICE : 202,2nd Floor HMP HOUSE ,4 FAIRLEY PLACE
, KOLKATA-711101
REGISTERED OFFICE : 206, 2nd Floor SHREENIKETAN
APARTMENT,BARBIL,KEONJHAR ,ODISHA
CONTACT NO : +91 9007819992 ; +91 9830870011 ; +91 9937754992 ;
+91 9668423900
CONTACT PERSON - SHAKEEL ANSARI (DIRECTOR)
EMAIL ID : aryavarta.mn @gmail.com