DRI WASTE (CHAR) UTILIZATION IN POWER PLANT TO REDUCE POWER GENERATION COST BY T.M. DANDAPAT 9/29/2014 1 TATA SPONGE DRI PRODUCTION 390,000 MT PER ANNUM FROM 3 KILNS & 26 MW OF POWER PLANT DRI UNIT 26 MW POWER PLANT 9/29/2014 22 Location TATA SPONGE IRON LTD. Corporate Office Bhubaneswar Office Coal Block in Angul TATA SPONGE IRON LTD. In the Orissa province (Eastern part of India) 275 KMs from the State Capital Remote mining cum agriculture area 9/29/2014 3 TATA SPONGE An associate company of Tata Steel Ltd., in the business of manufacturing of sponge iron. Based in Joda, in the district of Keonjhar, Odisha. 9/29/2014 44 INTRODUCTION IN DRI (SPONGE IRON ) PRODUCTION • RAW MATERIAL : A) IRON ORE B) NON COKING COAL C) DOLOMITE • PRODUCTS: A) SPONGE IRON (DRI) B) POWER FROM WASTE HEAT (WHRB) • SOLID WASTE: A) COAL CHAR , B) DE – DUST, C) FLY ASH, 9/29/2014 5 FLOW CHART OF THE DRI PROCESS BA GIL TE RS DE DUST 9/29/2014 6 GENERATION OF SOLID WASTE 0.15 MT CHAR 30% 0.08MT DE DUST 16% PER TON OF DRI SOLID WASTE GENERATION IS 0.5 MT 0.225 MT FLY ASH 45% 0.045 MT OTHERS 9% 9/29/2014 7 KILN’S SOLID WASTE BREAKUP % 9 16 45 30 FLY ASH CHAR DE DUST 9/29/2014 OTHERS 8 COOLER DISCHARGE CHAR & DE DUST • IN DRI MAKING THROGUH ROTARY KILNS NON MAGNETIC CHAR CONTAINS ALONG WITH FINISHED PRODUCT. • THIS NON MAGNETC CHAR HAVING GOOD F.C & GCV. • CHAR IS 30% OF TOTAL SOLID WASTE • DE DUST 16% OF TOTAL SOLID WASTE HAVING GOOD F.C & GCV 9/29/2014 9 SIZE ANALYSIS in % +6mm -6 +3mm 0 – 3mm 12.3 22.2 65.5 CHAR SIZE ANALYSIS in % 75 Mesh 25 -75 to 100 Mesh 75 DE DUST 9/29/2014 10 IN PUT COAL ANALYSIS COAL SOURCE V.M % ASH % F.C % GCV Kilo Calories/Kg. IMPORTED COAL S.A 25 - 27 14 - 16 57 - 60 6500 - 6700 INDIGENIOUS COAL 25 - 26 26 - 30 45 - 48 5000 - 5500 SOLID WASTE CHAR & DE DUST ANALYSIS V.M % ASH % F.C % GCV Kilo Calories/Kg. CHAR 1–2 55 - 60 35 - 40 3200 - 3400 DE DUST 2–4 60 - 65 30 - 35 2800 - 3000 9/29/2014 11 COMPARISION OF THE F- GRADE COAL WITH CHAR & DE DUST TYPEOF FUEL V.M ASH F.C GCV K.Cal./Kg. F – GRADE COAL 25 - 28 35 -40 30 - 35 3000 -3200 CHAR 1–2 55 - 60 35 - 40 3200 - 3400 DE -DUST 2–4 60 - 65 30 - 35 2800 - 3000 9/29/2014 12 • DEVELOPED A VALUE ADDED PRODUCT FROM SOLID WASTE, CHAR IS BEING UTILISED AS FUEL IN CFBC / AFBC BOILERS FOR POWER GENERATION • DE – DUST GENERATES THROUGH BAG FILTERS FROM FINISHED PRODUCT CIRCUITS AND IT CONTAINS GOOD CARBON IN PULVERISED CONDITION (-75 to 100 MESH). IS ALSO BEING USED IN CFBC BOILERS (10% MIXED WITH F – GRADE COAL 50 & 40% CHAR) 9/29/2014 13 FUEL REQUIREMENT FOR POWER GENERATION THROUGH AFBC BOILERS (100% F –Grade coal @ Rs.3000/MT) TYPE OF BOILER AFBC 15 MW AFBC 25 MW BOILER CAPACITY MAIN STEAM PRESSURE 70 TPH 60Kgf/cm2 110 TPH 60Kgf/cm2 MAIN STEAM TEMP. COAL REQUIREQUI REMENT PER HOUR. FUEL REQUIREM ENT PER DAY 500 0C 17 MT 410 MT 12.3 732 500 0C 27 MT 648 MT 19.44 736 9/29/2014 FUEL COST PER DAY (Rs. Laks) COST OF STEAM PER MT (Rs.) 14 FUEL REQUIREMENT FOR POWER GENERATION THROUGH CFBC BOILERS (100% F- GRADE COAL @ Rs.3000/MT ) TYPE OF BOILER BOILER CAPACITY MAIN STEAM PRESSURE MAIN STEAM TEMP. COAL FUEL REQUIRE REQUIRE QUIREME MENT / NT /Hr. DAY CFBC 15 MW 75 TPH 66Kgf/cm2 480 0C 20 MT CFBC 25 MW 110 TPH 66Kgf/cm2 480 0C 28 MT 9/29/2014 FUEL COST PER DAY Rs. Laks COST OF STEEM PER TON (Rs) 480 MT 14.40 800 672 MT 20.16 763 15 FUEL REQUIREMENT FOR POWER GENERATION THROUGH AFBE BOILERS (15 MW PLANT) (IN COMBINATION OF F- GRADE COAL AND CHAR) • CONSIDERING THE STEEM GENERATION FROM 15MW AFBC BOILER IS 1680 MT • FUEL COMBINATION IS 60% F- GRADE COAL & 40% CHAR • REQUIREMENT OF F – GRADE COAL = 24*10.9 =261 MT/DAY REUIREMENT OF CHAR = 24*8 = 192 MT/DAY • COST OF THE F-GRADE COAL = 3000*261= Rs.7.83 LAKH COST OF THE CHAR = 1300*192= Rs.2.496 LAKH • TOTAL FUEL COST IS 10.326 LAKHS • SO THE COST SAVINGS BY USING THE CHAR COMBINATION FUEL IS = 12.3 – 10.326 = 1.974 LAKH /DAY 9/29/2014 16 FUEL REQUIREMENT FOR POWER GENERATION THROUGH AFBC BOILERS (60% F –Grade coal @ Rs.3000/MT & 40% char @Rs.1300/MT) TYPE OF BOILER AFBC 15 MW AFBC 25 MW STEAM GENERATION /DAY MT FUEL COST FOR F-GRADE COAL 100% IN (Rs. LAKH) (A) FUEL COST SAVINGS IN COMBINATION STEEM /TON COAL AND CHAR (Rs.) (C) =A-B 60:40 IN (Rs.LAKH) (B) 1680 12.3 10.326 117.50 2640 16.44 16.147 124.74 9/29/2014 17 FUEL REQUIREMENT FOR POWER GENERATION THROUGH AFBE BOILERS (25 MW PLANT) (IN COMBINATION OF F- GRADE COAL AND CHAR) • CONSIDERING THE STEEM GENERATION FROM 25MW AFBC BOILER IS 2640 MT/DA • FUEL COMBINATION IS 60% F- GRADE COAL & 40% CHAR • REQUIREMENT OF F – GRADE COAL = 24*17.4 =417.6 MT/DAY REUIREMENT OF CHAR = 24*11.6 = 278.4 MT/DAY • COST OF THE F-GRADE COAL = 3000*417.6= Rs.12.528 LAKH COST OF THE CHAR = 1300*278.4= Rs. 3.619 LAKH • TOTAL FUEL COST IS 16.147 LAKHS • SO THE COST SAVINGS BY USING THE CHAR COMBINATION FUEL IS = 19.44 – 16.147 = 3.293 LAKH /DAY 9/29/2014 18 FUEL REQUIREMENT FOR POWER GENERATION THROUGH AFBC BOILERS (60% F –Grade coal @ Rs.3000/MT & 40% char @Rs.1300/MT) TYPE OF BOILER CFBC 15 MW CFBC 25 MW STEAM GENERATION /DAY MT FUEL COST FOR F-GRADE COAL 100% IN (Rs. LAKH) (A) FUEL COST SAVINGS IN COMBINATION STEEM /TON COAL AND CHAR (Rs.) (C) =A-B 60:40 IN (Rs.LAKH) (B) 1800 14.40 11.136 181.33 2640 20.16 15.590 173.10 9/29/2014 19 YEARLY SAVINGS • • • • AFBC 15 MW: 06.31 Cr. AFBC 25 MW: 10.54 Cr. CFBC 15 MW: 10.44 Cr. CFBC 25 MW: 14.62 Cr. LIST OF THE PARTIES USING CHAR • • • • • • • • M/S ADHUNIC METALIKS Ltd., M/S MSP STEEL & POWER LTD. M/S VISA STEEL LTD. M/S SHREE GANESH METALIKS LTD M/S SHYAM METALIKS AND ENERGY LTD M/S K P TRADING M/S VIKASH COAL COMPANY M/S SHREE JAGANNATH METALLIC INDUSTRIES 9/29/2014 21 AN APEAL TO THE GOVT. OF INDIA INORDER TO DECLARE CHAR IS NOT A WASTE • IT IS TO BE MANDATED TO UTILISE THE CHAR GENERATED FROM DRI PLANTS IN AFBC /CFBC BASED PLANTS. • ADVISE RAILWAYS TO GIVE SUBSIDY IN FRAIGHT FOR TRANSPORTING. • GIVING TAX EXEMPTIONS ON UTILISING THE CHAR IN POWER PLANTS. 9/29/2014 22 • CONSERVE NATURAL RESOURCES BY USING CHAR GENERATED FROM COAL BASED DRI PLANTS IN AFBC / CFBC BOILER BASED POWER PLANT WHICH OTHERWISE CALLED AS WASTE. • GENERATE WEALTH FROM CHAR (ENERGY SOURCE) WHICH OTHERWISE DECLARED AS WASTE 9/29/2014 23 CORPORATE OFFICE : 202,2nd Floor HMP HOUSE ,4 FAIRLEY PLACE , KOLKATA-711101 REGISTERED OFFICE : 206, 2nd Floor SHREENIKETAN APARTMENT,BARBIL,KEONJHAR ,ODISHA CONTACT NO : +91 9007819992 ; +91 9830870011 ; +91 9937754992 ; +91 9668423900 CONTACT PERSON - SHAKEEL ANSARI (DIRECTOR) EMAIL ID : aryavarta.mn @gmail.com 9/29/2014 24 9/29/2014 25 9/29/2014 26
© Copyright 2025 ExpyDoc