Construction EHS Program Deliverables - Required Documents & Approvals Document Contractor's Check-In Log Crane pre-operational hoist inspections. Confined Space Entry Excavation Permit Daily Trenching Log Building Surface Penetration Permit Hot work SDSTA 5 point safety system (PAUSE) or equivalent. EHS Statistical Report Crane monthly documented inspections Rigging equipment inspection • Synthetic Web Slings • Wire Rope Slings Confined Space Entry Program Electrical Safety Program Construction Environmental, Health & Safety Plan (CEHSP) including Job Hazard Analyses Particulate Emissions Control Plan for Construction Activities. Pipeline pipe flushing plan 1 1 SOW = (Before) Start of Work Program Element General Requirements Hoisting & Rigging EHS Inspections & Permits, Confined Spaces EHS Inspections & Permits, Excavation EHS Inspections & Permits EHS Inspections & Permits, Building Surface Penetrations EHS Inspections & Permits, Fire Prevention & Protection When Required? Daily Daily, When Required Daily, When Required SURF Form Available? Approval Required EHS Daily, When Required Bldg. Mgr. Daily, When Required Daily, When Required Bldg. Mgr. Bldg. Mgr. Third Party Reviewer, PAI Daily, When Required EHS Inspections & Permits Daily: EHS Inspections & Permits Hoisting & Rigging Hoisting & Rigging Monthly Monthly Periodic Confined Space Control of Hazardous Energy SOW 1 SOW EHS Plan, Hazard Identification and Control Environmental Requirements SOW SOW Env. Mgr. Environmental Requirements SOW Env. Mgr. EHS Electrical Safety Engineer EHS Construction EHS Program Deliverables - Required Documents & Approvals Document Program Element When Required? List of all equipment that is capable of exhausting a gas or particulate into the air Storm Water Discharge Permit Site specific erosion control plan for construction activities that disturb less than one acre Fall Protection Program • Site -Specific Fall Protection Plan • Site-Specific Fall Hazard Analysis • Trained Workers Written Hazard Communication Program Chemical inventory and Material Safety Data Sheets (MSDS) Environmental Requirements SOW Environmental Requirements Environmental Requirements SOW SOW Env. Mgr. Env. Mgr. Fall Protection SOW SURF Project Mgr., EHS POC Hazard Communication Environmental Requirements, Hazard Communication Hazard Identification and Control SOW SOW Hoisting & Rigging EHS Inspections & Permits SOW Weekly JHA with signed“Job Briefing Attendance” sheet Annual crane inspections Weekly EHS Report • Tool Box Talk Attendance • Weekly EHS Report Template • Site-Inspection Form • Pre-Use Inspection • Industrial Hygiene Monitoring Results • Permits Issued Energized Electrical Work Permit (EEWP). SOW SURF Form Available? 3 2 SURF Project Mgr., EHS POC 2 SURF Project Mgr., EHS POC Electrical Safety When Required3 2 Approval Required Env. Mgr. EHS POC (Point of Contact) When performing work covered by this activity, form must be submitted and/or approval is required. Electrical Safety Engineer Construction EHS Program Deliverables - Required Documents & Approvals Document First Report of Injury or Incident Program Element Emergency Response When Required? When required Hoisting and Rigging Lift Plan for complex and critical lifts Asbestos Abatement Plan Hoisting & Rigging When Required Industrial Hygiene Asbestos Abatement Contractors Lead Compliance Plan. List of Radioactive materials or devices Industrial Hygiene Industrial Hygiene When Required When Required Industrial Hygiene Monitoring Results Trained Worker Documentation • Competent/Qualified Person o Aerial Lifts o Mobile/Heavy Equipment o Confined Space Entry o Cranes o Excavation o Fall Protection o Hoisting & Rigging o Scaffolding • Qualified Electrical Worker • Workers Using Respirators • Workers in Hearing Conservation Program Industrial Hygiene Inspections & Permits, Other When Required SOW 4 3 IH = Industrial Hygienist SURF Form Available? Approval Required SURF Project Mgr., EHS POC SURF Project Mgr., EHS POC IH4 Radiation Safety Officer EHS POC
© Copyright 2024 ExpyDoc