I-DRIVE RESORT AREA /CONVENTION CENTER DISTRICT TRANSPORTATION IMPROVEMENTS I-DRIVE MASTER TRANSIT AND IMPROVEMENT DISTRICT ADVISORY BOARD JULY 30, 2014 Credit: James Davidson PRESENTATION OUTLINE County Projects State Projects Regional Transit Initiatives Other Needs Summary COUNTY PROJECTS International Drive CRA Capital Program I-Drive Transit Lanes I-Drive Widening John Young Parkway Widening John Young/Sand Lake Road Interchange Destination Parkway I-Drive Pedestrian Bridge INTERNATIONAL DRIVE TRANSIT LANES Mobility Improvement Destination Parkway to Sand Lake Road Right-of-Way Agreements Necessary Next Step - Final Design Coordinated with City of Orlando project INTERNATIONAL DRIVE WIDENING Widen from 4 to 6 Lanes Westwood Boulevard (S) to Westwood Boulevard (N) Intersection Improvements at Central Florida Parkway Construction begins – January 2015 Credit: Google JOHN YOUNG PARKWAY WIDENING Widen from 4 to 6 Lanes Add Continuous Right Turn Lanes SR 528 to Florida’s Turnpike Construction Complete - September 2014 Credit: Google JOHN YOUNG/SAND LAKE ROAD INTERCHANGE New Urban Interchange Partnership Project – County/FDOT Design Underway Construction Begins – March 2016 Credit: Google DESTINATION PARKWAY New 4-Lane Roadway International Drive to John Young Parkway East-West Mobility/Convention Center Access Final Phase – Tradeshow Blvd to Lake Cay Construction Begins – January 2015 Credit: Google INTERNATIONAL DRIVE PEDESTRIAN BRIDGE Elevated Pedestrian Crossing at Convention Center West Concourse / Hyatt Regency High Pedestrian Activity Design Complete Construction Begins - April 2015 Credit: MRI / GAI INTERNATIONAL DRIVE PEDESTRIAN BRIDGE Credit: MRI / GAI INTERNATIONAL DRIVE PEDESTRIAN BRIDGE Credit: MRI / GAI INTERNATIONAL DRIVE PEDESTRIAN BRIDGE Credit: MRI / GAI STATE PROJECTS Credit: Google Sand Lake Road Widening SR 528 Widening I-4 Ultimate SAND LAKE ROAD WIDENING Widen from 4 to 6 Lanes Turkey Lake Road to Universal Boulevard Universal Boulevard to John Young Parkway Credit: Google Construction Begins – December 2015 Construction Begins – September 2017 SR 528 WIDENING Florida’s Turnpike Enterprise Widening from 4 to 6 lanes New Express Lane in each direction Interstate 4 to Florida’s Turnpike Construction Begins – June 2015 Credit: Google I-4 ULTIMATE • Add 4 Express Lanes (Variable Tolls) • W. of Kirkman Road to State Road 434 • Construction Begins – Early 2015 • “Beyond I-4 Ultimate” • SR 528 to Kirkman Road • Advance Construction with I-4 Ultimate Credit: moving-4-ward.com REGIONAL TRANSIT INITIATIVES American Maglev Technology Proposal OIA Connector Refresh Alternatives Analysis Credit: Google AMERICAN MAGLEV TECHNOLOGY (AMT) Private Sector Proposal Connecting OIA to Convention Center Proposed Circulator FDOT RFP Selection – May 19, 2014 Authorization to Negotiate Lease Agreements Credit: Google FDOT, County, City, GOAA, Expressway Authority Initial Meetings Held Recently AMERICAN MAGLEV TECHNOLOGY (AMT) Credit: Google, EMMI AMERICAN MAGLEV TECHNOLOGY (AMT) 4 Convention Center North/South Hotel Existing Garage Hotel 3 2 Hotel Convention Center West 1 Legend North/South Circulator 1 2 3 4 Intermodal Station at OCCC Convention Center North/South Convention Center West Pointe Orlando Plan Credit: AMERICAN MAGLEV TECHNOLOGY (AMT) 4 Convention Center North/South Pointe Orlando 3 North/South Circulator 2 Intermodal Station at OCCC 2 Convention Center North/South 3 Convention Center West 4 Pointe Orlando 1 1 Convention Center West Intermodal Station at OCCC Credit: OIA CONNECTOR REFRESH ALTERNATIVES ANALYSIS “Refresh” of 2005 Study I-Drive Resort Area to OIA SunRail Connectivity Bus Rapid Transit (BRT) and Light Rail considered 4 Alternative Alignments Remain American Maglev Proposal Impacts being reviewed Next Step - Preferred Alignment Selection OTHER NEEDS Kirkman Road Extension Convention Center District Circulator Parking Management Strategy Pedestrian Enhancements credit: fdc.com KIRKMAN ROAD EXTENSION • Extension of Existing Roadway South • Lockheed Martin to Destination Parkway • Previously Identified Transportation Need • Corridor Preserved Credit: Google CONVENTION CENTER DISTRICT CIRCULATOR • Connectivity from Convention Center to District Destinations • OCCC Client Advisory Board Top Priority • Traffic Management Strategy • Parking Management Strategy • Supports Placemaking Initiatives SUMMARY I-Drive CRA Capital Program Underway State Roadway Improvements on the Horizon Transit is Essential to Convention Center District Vision Connectivity to the District Transit within the District I-DRIVE RESORT AREA /CONVENTION CENTER DISTRICT TRANSPORTATION IMPROVEMENTS I-DRIVE MASTER TRANSIT AND IMPROVEMENT DISTRICT ADVISORY BOARD JULY 30, 2014 Credit: James Davidson
© Copyright 2024 ExpyDoc