1. CONTRACT ID CODE AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT PAGE OF PAGES 1 2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE W91278-14-LRSB-CK01-0001 1 APR 2014 6. ISSUED BY CODE 4. REQUISITION/PURCHASE 2 5. PROJECT NO. (If applicable) MB14EQ34 7. ADMINISTERED BY(If other than item 6) CODE Corps of Engineers 109 St. Joseph St. Mobile, AL 36602 8. NAME AND ADDRESS OF CONTRACTOR 9A. AMENDMENT OF SOLICITATION NO. (No., street, county, State and ZIP code) W91278-14-LRSB-CK01 9B. DATED (SEE ITEM 11) 26 APR 2014 10A. MODIFICATION OF CONTRACT/ORDER NO. 10B. DATED (SEE ITEM 13) CODE FACILITY CODE 11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified. 12. ACCOUNTING AND APPROPRIATION DATA (if required) 13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS, IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b) C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF: D. OTHER E. IMPORTANT: (Specify type of modification and authority) Contractor is not, is required to sign this document and return 14. DESCRIPTION OF AMENDMENT/MODIFICATION The subject solicitation for: copies to the issuing office. (Organized by UCF section headings, including solicitation/contract subject matter where feasible) DESIGN/BUILD VETERINARY CLINIC REPLACEMENT, EGLIN AIR FORCE BASE, FL Is modified in the following: REFER TO THE ENCLOSED REVISIONS FOR AMENDMENT NO. 0001 Except as provided herein, all terms and conditions of the document reference in item 9A or 10A, as Heretofore changed, remains unchanged and in full force and effect. 15A. NAME AND TITLE OF SIGNER 15B. CONTRACTOR/OFFEROR (Type or print) 15C. DATE SIGNED 16A. NAME AND TITLE OF CONTRACTING OFFICE 16B. UNITED STATES OF AMERICA BY 16C. DATE SIGNED (Signature of contracting officer) (Signature of person authorized to sign) NSN 7540-01-152-8070 PREVIOUS EDITION UNUSABLE (Type or print) 30-105 STANDARD FORM 30 (REV. 10-83) Prescribed by GSA DESIGN/BUILD VETERINARY CLINIC REPLACEMENT EGLIN AIR FORCE BASE, FLORIDA W91278-14-LRSB-CK01 MB14EQ34 PART I-REVISIONS MADE BY ADDED AND/OR REPLACEMENT PARAGRAPHS/PAGES/SECTIONS The items listed below are to be replaced by the corresponding added and/or revised paragraphs/pages or sections. Added and/or revised paragraphs/pages or sections are indicated by a note in bottom right hand corner of each paragraph or page. Added sections are hereby made a part of the contract and are to be inserted in the specification in the proper numerical/alphabetical sequence. Within the specifications, deletions from the specifications are indicated by strikethrough, e.g.: deletions are marked with strikethrough and additions to the specifications including revisions/substitutions are indicated in bold, italic and underlined, e.g.: additions are indicated thus. SECTION Corresponding Added or Revised Paragraph, Page, and/or Sections VOLUME 1 RFP Letter Revised Paragraph 7 VOLUME 2 Attachment I Replaced Tab 6 Encl as stated Revised pages of the specifications as indicated in Part I. SF 30 Page 2 Amendment No. 0001 DESIGN/BUILD VETERINARY CLINIC REPLACEMENT EGLIN AIR FORCE BASE, FLORIDA W91278-14-LRSB-CK01 MB14EQ34 RFP LETTER ******************************************************************************************** 7. To enhance your understanding of the task order requirements, a Site Visit is scheduled for 10April 2014 09 April 2014 at 0900 at the Eglin AFB, Florida, in Building 632. For base access to attend the site visit, the Memorandum and Form 90 are required (Base Access Forms follow this RFP Letter). They must be faxed to the Eglin Resident Engineer Office at (850) 882-3600 at least 7-14 days in advance to ensure access. Call the REO Front Desk at (850) 882-1052 only if there are questions about filling out these forms. Note: This process will take a full seven days and cannot be expedited in any manner. Questions asked of government personnel at the conference and government personnel responses shall be non-binding. Official responses will only be made to questions formally submitted to the Bidder’s Inquiry Portal in ProjNet at website http://www.projnet.org/projnet. ******************************************************************************************** (NOTE: The remainder of the letter is unchanged by the amendment.) RFP LETTER AMENDMENT NO. W91278-14-LRSB-CK01-0001 This page was intentionally left blank for duplex printing. 13 FEB 13 CORE PROJECT DELIVERY TEAM & DISTRIBUTIONWEEKLY LIST REPORT TAB 6-PDT DISTRO PROJECT: CONTRACT #: AGENCY NAME OFFICE ROLE/ POSITION ADDRESS E-MAIL PHONE # 1 USACE Robert Schodlbauer USACESAM Project Manager 2 USACE 3 USACE Angela O'Connor USACESAM Christine Busiak USACESAM Mobile District, CESAM-EN-D - 109 St. Joseph Street, Mobile AL, 36628-0001 CESAM-CD-GA - Building 632 Inverness Road, Eglin AFB, FL 32542 4 USACE TBD (MILCON Only) 5 AFCEC Jason Johnson AFCEC/CF MILCON FB Program Manager Medical Facilities Center of Expertise & Standardization-SW Region,7701 Telegraph Rd, Alexandria, VA 22315 AFCEC/CFFB Attn Jason Johnson 3515 S General McMullen San Antonio, TX, 78226-9853 6 AFMSA TBD 7 AFMSA Capt Michael Creasy 8 AFMSA Mr. John Henry 9 BASE CE Elaine HopkinsSoha HFD/SG8F Air Force Attention To: Yadi Ramirez-Peterson Health Project AFMSA/SG8F Health Facilities Division Officer (SG8F) 601 Davy Crockett San Antonio, TX, 78226 HFD/SG8F Project Health 307 Boatner Road, Suite 114 Facilities Eglin Air Force Base, FL 32542 Officer HFD/SG8F Initial Outfitting- See above Directorate CE CE Building 634 Inverness Road, Eglin AFB, Representative FL 32542 Project Engineer Quality Assurance Evaluator USACE/Mx MILCON ONLY Mobile District, CESAM-PM-AF - 109 St. Joseph Street, Mobile AL, 36628-0001 jason.johnson.2 @us.af.mil 210 395-8598 timothy.creasy@ 850-883-9868 eglin.af.mil john.henry.15.ctr 850-883-9711 @us.af.mil EXTENDED PROJECT DELIVERY TEAM SUPPORT 10 USACE Lawrence F. Romett, P.E. 11 USACE TBD (MILCON Only) USACE/CE Medical HNC-ED- Facilities MX Center of Expertise & Standardizatio n USACE/Mx Medical Facilities Center of Expertise & Standardization-SW Region,7701 Telegraph Rd, Alexandria, VA 22315 Larry.F.Romett@ (703) 428-9142 usace.army.mil (571) 225-8891 (Cell) (703) 428-9144 (Fax) see above REPLACED BY AMENDMENT NO. W91278-14-LRSB-CK01-0001 13 FEB 13 CORE PROJECT DELIVERY TEAM & DISTRIBUTIONWEEKLY LIST REPORT TAB 6-PDT DISTRO PROJECT: AGENCY CONTRACT #: NAME OFFICE ROLE/ POSITION ADDRESS E-MAIL PHONE # 12 USACE TBD (MILCON Only) 13 AFMSA Ms Yadi Ramirez- HFD/SG8F Office Manager Attention To: Yadi Ramirez-Peterson Peterson AFMSA/SG8F Health Facilities Division 601 Davy Crockett San Antonio, TX, 78226 See above Lt Col Jennifer HFD/SG8F Medical Gruenwald Programs Manager Maj Matt Clugston HFD/SG8F Project See above Execution Lead Capt. Candido HFD/SG8F Initial Outfitting See above Ramirez Lead 14 AFMSA 15 AFMSA 16 AFMSA USACE/Mx see above 17 AFMSA Mr Brian Surber HFD/SG8F IO Program Manager See above 18 AFMSA Nancy Dickinson 19 AFMSA Courtney Gibb HFD/SG8F IO Director, See above Planning & Execution HFD/SG8F Interior Design See above 20 AFMSA Cynthia Miller HFD/SG8F Interior Design See above 21 AFMSA Sharon Roberts 22 AFMSA Don Napierala 23 AFMSA Tommy Phillips See above HFD/SG8F Certified Healthcare Facility Design Professional (HFDP) Sr. MEP Engineer See above HFD/SG8F Air Force Medical Equipment Planner HFD/SG8F Air Force See above Medical Equipment Planner Yadira.Ramirez‐ 210‐925‐1486 (tel) Peterson.ctr@us .af.mil jennifer.gruenwal 210-925-5244 [email protected] matthew.clugsto 210-925-1481 [email protected] candido.ramirez 210-925-1367 (tel) @us.af.mil 210-2491777(cell) brian.surber@us. 210-925-1391 (tel) af.mil 210-204-8688 (cell) nancy.dickinson. 210-925-5215 (tel) [email protected] 405-202-3214 (cell) courtney.gibb@u 210-925-5233 (tel) s.af.mil cynthia.miller.9.ct 210-925-1485 (tel) [email protected] sharon.roberts.3. 210-925-2298 (tel) [email protected] 210-454-2407 (cell) donald.napierala. 210-925-1601(tel) [email protected] tommy.phillips.2. 210-925-5175 [email protected] (tell) REPLACED BY AMENDMENT NO. W91278-14-LRSB-CK01-0001 13 FEB 13 CORE PROJECT DELIVERY TEAM & DISTRIBUTIONWEEKLY LIST REPORT TAB 6-PDT DISTRO PROJECT: CONTRACT #: AGENCY NAME OFFICE ROLE/ POSITION ADDRESS E-MAIL PHONE # TBD 25 DHA Maj Christopher Pechacek 26 AFMOA Christine Toscano AFMOA/S Air Force GAI MSIM Specialist (SGAI) Jesus Soto AFMOA/S Air Force GAI MSIM Specialist (SGAI) 3515 S. General McMullen, Suite 200 San Antonio, TX 78226 christopher.s.pec 703-681-6183 hacek.mil@mail. mil christine.toscano 210-395-9698 (tel) [email protected] 3515 S. General McMullen, Suite 200 San Antonio, TX 78226 jesus.soto.3.ctr @us.af.mil 28 AFMOA General MISM Group AFMOA/S Air Force GAI MSIM Specialist (SGAI) 3516 S. General McMullen, Suite 200 San Antonio, TX 78226 E-MAIL DLD.MSIM.HFO@ correspondence us.af.mil only 29 AF MDG Mr. Terry Trier 96 MDG 30 AF MDG Lt Col Stephanie Dusza 97 MDG Facility Manager Logistics CC 307 Boatner Road, Suite 114 Eglin Air Force Base, FL 32542 see above terence.trier@us. 850-883-8515 af.mil Stephanie.Dusza 850-883-9311 @EGLIN.AF.MIL 31 AF MDG Lt Col Ed LaGrou 98 MDG MDSS/CC see above edward.lagrou@ 850-883-8118 us.af.mil 32 A-E 3 (Peer review) 33 A-E 3 (Peer review) 34 A-E 3 (Peer review) 35 A-E 3 (Peer review) 36 A-E 3 (Peer review) TBD TBD TBD TBD TBD TBD TBD Project Manager (Field) Project Manager (Office) Mechanical see above TBD TBD Electrical see above TBD TBD Life Safety see above 27 AFMOA HFD/SG8F HFD Portfolio Manager DHA-FD Program Manager See above 24 AFMSA 7700 Arlington Blvd, Falls Church, VA 22042 210-395-9707(tel) TBD REPLACED BY AMENDMENT NO. W91278-14-LRSB-CK01-0001 13 FEB 13 CORE PROJECT DELIVERY TEAM & DISTRIBUTIONWEEKLY LIST REPORT TAB 6-PDT DISTRO PROJECT: CONTRACT #: AGENCY NAME OFFICE ROLE/ POSITION ADDRESS E-MAIL PHONE # 37 A-E 3 (Peer review) TBD TBD Structural see above TOTALS: REPLACED BY AMENDMENT NO. W91278-14-LRSB-CK01-0001 13 FEB 13 NOTE: all hard copy drawings are half-sized WEEKLY REPORT TAB 6-PDT DISTRO SUBMITTALS (Design, FFE-LVS, Precon, Closeout) Mtg Invites/ # Submittal #1 Elect Elect Submittal #2 Hard Copy Elect Corrected /Quantified Final Submittal #3 Hard Copy Elect Hard Copy Construction Submittals/Shop SEE ATTACHED SUBMITTAL REGISTER SID/CID Boards Hard Copy Elect (Construction) Hard Copy Elect 1 1 1 1 1 1 1 1 1 1 1 1 2 1 1 4 1 4 1 4 1 4 1 1 3 2 2 2 2 2 2 2 2 2 1 1 4 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 6 1 1 2 1 2 1 2 1 2 1 1 7 1 1 1 1 1 1 1 1 1 1 0 8 1 1 1 1 1 1 1 1 1 1 1 9 1 7 5 7 5 7 5 7 5 2 2 10 1 1 1 1 1 1 1 1 1 1 0 11 0 0 0 0 0 0 0 0 0 0 0 REPLACED BY AMENDMENT NO. W91278-14-LRSB-CK01-0001 13 FEB 13 NOTE: all hard copy drawings are half-sized WEEKLY REPORT TAB 6-PDT DISTRO SUBMITTALS (Design, FFE-LVS, Precon, Closeout) Mtg Invites/ # Submittal #1 Elect Elect Submittal #2 Hard Copy Elect Corrected /Quantified Final Submittal #3 Hard Copy Elect Hard Copy Construction Submittals/Shop SEE ATTACHED SUBMITTAL REGISTER SID/CID Boards Hard Copy Elect (Construction) Hard Copy Elect 12 0 0 0 0 0 0 0 0 0 0 0 13 1 1 2 1 2 1 2 1 2 1 1 14 1 1 1 1 1 1 1 1 1 1 0 1 1 0 1 0 1 0 1 0 1 0 16 1 1 0 1 0 1 0 1 0 1 0 17 1 1 0 1 0 1 0 1 0 1 0 18 1 1 0 1 0 1 0 1 0 1 0 19 1 1 0 1 0 1 0 1 0 1 0 20 1 1 0 1 0 1 0 1 0 1 0 21 1 1 0 1 0 1 0 1 0 1 0 22 1 1 0 1 0 1 0 1 0 1 0 23 1 1 0 1 0 1 0 1 0 1 0 REPLACED BY AMENDMENT NO. W91278-14-LRSB-CK01-0001 13 FEB 13 NOTE: all hard copy drawings are half-sized WEEKLY REPORT TAB 6-PDT DISTRO SUBMITTALS (Design, FFE-LVS, Precon, Closeout) Mtg Invites/ # Submittal #1 Elect Elect Submittal #2 Hard Copy Elect Corrected /Quantified Final Submittal #3 Hard Copy Elect Hard Copy Construction Submittals/Shop SEE ATTACHED SUBMITTAL REGISTER SID/CID Boards Hard Copy Elect (Construction) Hard Copy Elect 24 0 0 0 0 0 0 0 0 0 0 0 25 1 1 0 1 0 1 0 1 0 1 0 26 1 1 0 1 0 1 0 1 0 1 0 27 1 1 0 1 0 1 0 1 0 1 0 28 1 1 0 1 0 1 0 1 0 1 0 29 1 1 0 1 0 1 0 1 0 1 0 30 1 1 0 1 0 1 0 1 0 1 0 31 1 1 0 1 0 1 0 1 0 1 0 32 1 2 2 2 2 2 2 2 2 2 1 33 1 2 2 2 2 2 2 2 2 2 1 34 0 0 0 0 0 0 0 0 0 0 0 35 0 0 0 0 0 0 0 0 0 0 0 36 0 0 0 0 0 0 0 0 0 0 0 0 REPLACED BY AMENDMENT NO. W91278-14-LRSB-CK01-0001 13 FEB 13 NOTE: all hard copy drawings are half-sized WEEKLY REPORT TAB 6-PDT DISTRO SUBMITTALS (Design, FFE-LVS, Precon, Closeout) Mtg Invites/ # 37 Submittal #1 Elect Elect Submittal #2 Hard Copy Elect Corrected /Quantified Final Submittal #3 Hard Copy Elect Hard Copy Construction Submittals/Shop SEE ATTACHED SUBMITTAL REGISTER SID/CID Boards Hard Copy Elect (Construction) Hard Copy Elect 0 0 0 0 0 0 0 0 0 0 0 31 39 26 39 26 39 26 39 26 33 12 REPLACED BY AMENDMENT NO. W91278-14-LRSB-CK01-0001
© Copyright 2024 ExpyDoc