ENERGY WORLD CORPORATION LTD. 9A Seaforth Crescent, Seaforth NSW 2092, Australia. Tel : (61 2) 9247 6888 Fax: (61 2) 9247 6100 For personal use only 1 March 2014 The Listing Manager Company Announcement Platform ASX Limited Total no. of page(s): 1 + attachment Dear Sirs, SITE PHOTO PRESENTATION - SENGKANG LNG PROJECT AND PHILIPPINES LNG HUB TERMINAL AND POWER STATION PROJECT The Company is pleased to provide the attached presentation containing construction progress photos for its projects including the Sengkang LNG Project and Philippines LNG Hub Terminal and Power Station Project. These presentations are further to the Company’s Appendix 4D for the half year ended 31 December 2013 previously lodged and the Directors’ Report contained therein. Yours faithfully, For and on behalf of ENERGY WORLD CORPORATION LTD. Brian Allen Executive Director REGISTERED OFFICE ADDRESS 9A Seaforth Crescent, Seaforth NSW 2092, Australia. Tel : (61 2) 9247 6888 Fax: (61 2) 9247 6100 A.C.N. 009 124 994 ENERGY WORLD CORPORATION LIMITED ENERGY WORLD For personal use only CORPORATION LIMITED Site Photo Presentation ENERGY WORLD CORPORATION LIMITED ENERGY WORLD For personal use only CORPORATION LIMITED Indonesian Projects ENERGY WORLD CORPORATION LIMITED For personal use only Sengkang LNG Plant LNG Tank base for 88,000M³ and First Slipform Equipment being Erected ENERGY WORLD CORPORATION LIMITED For personal use only Sengkang LNG Plant LNG Storage Tank: Construction of Bored-Piles, Pile Heads and Base Slab Completed with Assembling of Slipforming Material In Progress ENERGY WORLD CORPORATION LIMITED For personal use only Sengkang LNG Plant LNG Storage Tank: Graveling at Base Slab Storage Tank In Progress ENERGY WORLD CORPORATION LIMITED For personal use only Sengkang LNG Plant LNG Storage Tank: Vertical Trumplates Installation in progress ENERGY WORLD CORPORATION LIMITED For personal use only Sengkang LNG Plant Main Processing Plant Area – Phase I ENERGY WORLD CORPORATION LIMITED For personal use only Sengkang LNG Plant 1st Cold Box Erection ENERGY WORLD CORPORATION LIMITED Sengkang LNG Plant For personal use only Cold Box 1 Cold Box 2 Cold Box 1 Cold Box 2 2nd Cold Box ready for Erection ENERGY WORLD CORPORATION LIMITED For personal use only Sengkang LNG Plant Main Processing Plant Area – Phase I ENERGY WORLD CORPORATION LIMITED For personal use only Sengkang LNG Plant LNG Processing Equipment being Erected ENERGY WORLD CORPORATION LIMITED For personal use only Sengkang LNG Plant Main Processing Plant Area – Pre-treatment Plant of MPA I ENERGY WORLD CORPORATION LIMITED For personal use only Sengkang LNG Plant Main Processing Plant Area – Pre-treatment Plant of MPA I ENERGY WORLD CORPORATION LIMITED For personal use only Sengkang LNG Plant Compressor ENERGY WORLD CORPORATION LIMITED For personal use only Sengkang LNG Plant Compressor ENERGY WORLD CORPORATION LIMITED For personal use only Sengkang LNG Plant Main Processing Area Phase IB ENERGY WORLD CORPORATION LIMITED For personal use only Sengkang LNG Plant Construction of Permanent Jetty ENERGY WORLD CORPORATION LIMITED For personal use only Sengkang LNG Plant Permanent Jetty: Construction of Bored Pile at Loading Platform & Berthing Dolphin In Progress ENERGY WORLD CORPORATION LIMITED For personal use only Sengkang LNG Plant Switch Yard ENERGY WORLD CORPORATION LIMITED For personal use only Sengkang LNG Plant Permanent Workshop / Warehouse ENERGY WORLD CORPORATION LIMITED For personal use only Sengkang LNG Plant EWC Site Visit ENERGY WORLD CORPORATION LIMITED For personal use only Sengkang LNG Plant Main Processing Plant Area – Phase I ENERGY WORLD CORPORATION LIMITED For personal use only Sengkang LNG Plant Compressor ENERGY WORLD CORPORATION LIMITED For personal use only Sengkang LNG Plant Cold Box ENERGY WORLD CORPORATION LIMITED For personal use only Sengkang LNG Plant LNG Marine Loading Arms ENERGY WORLD CORPORATION LIMITED For personal use only Sengkang LNG Plant ENERGY WORLD CORPORATION LIMITED For personal use only Sengkang Power Station ENERGY WORLD CORPORATION LIMITED For personal use only Sengkang Gas Plant ENERGY WORLD CORPORATION LIMITED For personal use only Sengkang Gas Plant ENERGY WORLD CORPORATION LIMITED For personal use only Sengkang Gas Plant Safety First ENERGY WORLD CORPORATION LIMITED For personal use only Drilling / Testing Wasambo Gas Project ENERGY WORLD CORPORATION LIMITED For personal use only Meeting with President of Indonesia Meeting with President of Indonesia, Dr. Susilo Bambang Yudhoyono ENERGY WORLD CORPORATION LIMITED ENERGY WORLD For personal use only CORPORATION LIMITED Construction Progress Photos at Pagbilao LNG Hub Terminal and Power Station ENERGY WORLD CORPORATION LIMITED For personal use only Pagbilao LNG Hub Terminal Foundation and Slipform Assembly for The 130,000M³ LNG Tank ENERGY WORLD CORPORATION LIMITED For personal use only Pagbilao LNG Hub Terminal Installed storage of prestressing ducts and couplers Installation of Vertical rebar at tank wall ongoing ENERGY WORLD CORPORATION LIMITED For personal use only Pagbilao LNG Hub Terminal Installation from copper tube to hydraulic hose until to hydraulic jack ENERGY WORLD CORPORATION LIMITED For personal use only Pagbilao LNG Hub Terminal Installation of prestress duct to trumplate in the tank buttress ENERGY WORLD CORPORATION LIMITED For personal use only Pagbilao LNG Hub Terminal Fabrication and installation of rebar and stressing duct guide at tank wall ongoing ENERGY WORLD CORPORATION LIMITED For personal use only Pagbilao LNG Hub Terminal Slipform Engineering Workshop ENERGY WORLD CORPORATION LIMITED For personal use only Pagbilao LNG Hub Terminal Stripping of hill for the location of roadway and regasification Formation of pipeway and roadway ongoing ENERGY WORLD CORPORATION LIMITED For personal use only Pagbilao LNG Hub Terminal Drilling Rig machine / Piles 1.5M Ø45M Length ENERGY WORLD CORPORATION LIMITED For personal use only Pagbilao LNG Hub Terminal LNG Jetty Foundation ENERGY WORLD CORPORATION LIMITED For personal use only Pagbilao LNG Hub Terminal Jetty Loading Arms ready for Shipping ENERGY WORLD CORPORATION LIMITED For personal use only Pagbilao Power Station Site Artist Impression 600MW CC Power Plant Site Area for the 600MW Combined Cycle Power Station showing Location of LNG Tank and Power Station Site ENERGY WORLD CORPORATION LIMITED For personal use only Pagbilao Power Station Lay-out of round about location going to LNG area and Power Station completed Riprapping for slope protection beside Warehouse B and Power Station ENERGY WORLD CORPORATION LIMITED For personal use only Pagbilao Power Station 200MW Gas Turbine Units ready for Shipping ENERGY WORLD CORPORATION LIMITED For personal use only Pagbilao Power Station Combined Cycle Power Plant – Equipment of Gas Turbine ENERGY WORLD CORPORATION LIMITED For personal use only Australian Projects Abbot Point Eromanga Gilmore Australia ENERGY WORLD CORPORATION LIMITED For personal use only Australia – Gilmore LNG Facility – Placing equipment on the foundations Cold Box ENERGY WORLD CORPORATION LIMITED For personal use only Fueling Station ENERGY WORLD CORPORATION LIMITED For personal use only Site at Abbot Point and Power Station ENERGY WORLD CORPORATION LIMITED South Australia - Southern Cooper Project (PEL 96) PEL 96 • 33.3% Operating Party • Strike Oil Limited Production Status • PEL obtained 13 May 2009 Future Investment Obligation • Being determined For personal use only Percentage Interest of EWC Southern Cooper Project (PEL 96) Location – Epic Energy’s Moomba to Adelaide Gas Pipeline Traverses the Permit Source: Strike Oil Limited Australia PEL 96 ENERGY WORLD CORPORATION LIMITED For personal use only Commencement of Drilling Operations at Le Chiffre 1 (PEL96)
© Copyright 2024 ExpyDoc