Inspection List - 120KB - PlaneSayling Aviation Limited

Sikorsky S-76C++
I N S P E C T I O N S
S/N: 760699 – AFTT. 1074:38 – Annual Inspections – 25th February 2014
The following inspections were completed by Vector Aerospace International Ltd.
Fareham Road, Gosport, Hampshire, PO13 0AA (EASA Approval. UK.145.01164).
Task No.
Description / Work Summary
34/710
34/711
25Hr Inspection carried out.
20 Hr PACs carried out No1 Eng #42195 Tq = +10.6 % T5= +17 C
No2 Eng #42172 Tq= +4.5 % T5= +49 C
30Hr Mag Chips inspection carried out – no debris evident
50Hr Inspection carried out.
600Hr Airframe Inspection carried out.
600Hr Engine Inspection No2 Engine #42172 carried out.
300Hr/1Yr Airframe Inspection carried out.
300Hr/6m Airframe Inspection carried out.
1500Hr/1Yr Airframe Inspection carried out.
1500Hr/2Yr Airframe Inspection carried out.
1 Month Inspection carried out.
6 Month Inspection carried out.
Annual Inspection carried out
Radio Annual Inspection carried out
2Year Avionics Inspection items carried out as detailed on PO
2 Yearly Airframe inspection items carried out as detailed on PO
Tail cone (station 300) splice Tee frame bolts replaced IAW AMM 53-40-07.
P/N: NAS624-12 (X6) B/N: 938297
P/N: NAS625-13 (X2) B/N: 111270004001
Stby Att Emergency Battery O/H carried out. Power supply removed 4-Feb-2014.
Dispatched for O/H + Cap Chk. Serviced Power Supply Battery Fitted and
Tested/Functioned Satisfactory. P/N: 501-1712-01 S/N: 1978
Last Cap Test Date:- 13-Feb-2014
Main Battery Cap chk due – Main battery replaced with customer spare.
Battery P/N: RG380E/44L S/N: 40391571 Removed
Battery P/N: RG380/44 S/N: 40587339 Fitted & Functioned Satis
Last Cap Check dated 23-Feb-2014.
ASB 73-32-32 Carried out on NLG
ASB 76-29-12 carried out no Hyd Line chafing evident
SIB 2009-28 CVFDR Analysed and Calibrated
SIB 2009-28 CVFDR installed and functionally checked
ASB 76-76-7 ECL Throttle quadrant modified (Friction device installed)
AD 2013-0170/MSB 292732822 Version F HMU splines examined.
M/R Spindles removed/disassembled and inspected – no defects.
Qty 4 Spindle Bearing outer races replaced. See WO 34-743 Op 10 for disassembly &
Assembly Certification & dimension check. Outer Races replaced IAW
MM65-12-02 Pg 405 Para 8 & 9 & Page 410 Para 13 & 14 (Rev 29). (DUPES FQ107)
S/N: B199-28812 - Fitted to Black Spindle, S/N: B199-28843 - Fitted to Yellow Spindle,
S/N: B199-28888 - Fitted to Blue Spindle, S/N: B199-28813 - Fitted to Red Spindle.
B/N for All : FAA Form 8130-3 No. 214970 Attached
600H/1Y – Airframe insp carried out
Post Maintenance Ground Runs Carried out
MGB/IGB/TGB Replace Oils
MGB P/N 76351-09600-045 S/N A231-00428 ;IGB P/N 76357-05600-041 S/N A242-00417;
TGB - Oil drained & replenished Ref: 05-20-00
34/712
34/713
34/714
34/716
34/717
34/719
34/720
34/722
34/724
34/725
34/726
34/727
34/729
34/730
34/731
34/732
34/733
34/735
34/736
34/739
34/740
34/741
34/742
34/743
34/744
34/875
34/1607
34/1949
Contact Stephen Ayling – T: +44 (0) 1276 855-340
PlaneSayling Aviation Limited. Building B1H, West Entrance, Fairoaks Airport, Chobham. GU24 8HX UK.
www.PlaneSaylingAviation.com – [email protected]