SAFE Notice 2014 Number: 2-2166 Kooragang Island Commissioning of Kooragang Coal Terminal (KCT) Arrival Road Resignalling Project To be read in conjunction with Train Alteration Advice (TAA) No 0910-2014 Commencing at 0600 hours Tuesday 30th September 2014 continuous until 0600 hours Friday 3rd October 2014 or until the works are completed, the following works will be carried out as part of the Kooragang KCT Arrival Roads Resignalling Optimisation project. John Holland Rail will install and commission three signal gantries on the Arrival Roads to the Port Waratah Coal Services (PWCS) dump stations at KCT. The gantries will be located at 176.275km, 176.664km and 176.864km with new signals as identified in the table below. Signals numbers K9, K11, and K13 will be upgraded with modified route aspects and signal number K14 will be relocated from 175.102 to 174.402 km. Existing signals numbers K27, K29, K31 and K33 will be booked out of use and permanently removed from the network. In conjunction with re-signalling works number 115 and 124 crossovers will be booked out of use and permanently removed from the network. On completion of the works rail traffic traversing the KCT Arrival Roads to the PWCS Dump Stations will have main line running signals onto and along the Arrival Roads. The junctions at the entrance to the arrival roads will be signalled as an equal speed junction. This arrangement will allow the use of multi-lamp route MLRI indicators (MLRI) in conjunction with a green aspect. FOR THE INFORMATION OF ALL QUALIFIED WORKERS AND USERS OF THE ARTC NETWORK 1 Infrastructure Signalling and Alterations These works will alter the following signalling infrastructure; Signal Number Location (km) Change K9 174.501 km MLRI and subsidiary route indicators added K11 174.982 km K13 174.934 km K14 174.402 km K29 Repeater 176.275 km K31 Repeater K33 Repeater K35 Repeater 176.275 km 176.275 km 176.275 km K29 K31 K33 K35 176.664 176.664 176.664 176.664 K37 176.864 km K39 K41 K43 km km km km 176.864 km 176.864 km 176.864 km New yellow aspect plus new MLRI and subsidiary route indicators Replace Dwarf signal with main line signal with new MLRI and subsidiary route indicators Relocated from 175.102 to 174.402 km New gantry mounted repeater signal New gantry mounted repeater signal New gantry mounted repeater signal New gantry mounted repeater signal New gantry mounted signal New gantry mounted signal New gantry mounted signal New gantry mounted signal Replace K33 Dwarf signal with new gantry mounted signal Replace K31 Dwarf signal with new gantry mounted signal Replace K29 Dwarf signal with new gantry mounted signal Replace K27 Dwarf signal with new gantry mounted signal Alterations to Points Infrastructure These works will alter the following points infrastructure. Points /Crossover Number 115 crossover 124 crossover 109 points Location Change Kooragang Arrival Road 2 to 3 Kooragang Arrival Road 1 to 2 Weighbridge Road to No.3 Arrival Road Permanently Removed Permanently Removed Emergency Operation Lock (EOL) installed. Permanent Speed Sign FOR THE INFORMATION OF ALL QUALIFIED WORKERS AND USERS OF THE ARTC NETWORK 2 An new permanent 15kmh speed sign will be installed for up directional rail traffic at 176.714km leading to the KCT PWCS Dump stations. Safeworking Arrangements An infrastructure Booking Authority (ANRF003) must be compiled as per ANWT 312 and ANPR 704 to book out of use and back into of use, commission and permanently remove infrastructure. All work must be carried out as per the appropriate ARTC Network Rules and Procedures. SAFE Notice recipients must ensure this SAFE Notice is circulated to and understood by all personnel affected by, or needing to know, its content. SAFE Notices must be issued to all affected Qualified Workers. Qualified Workers who receive a SAFE Notice must follow the requirements in the SAFE Notice. Project Manager: Greg Cavanagh Newcastle 15th September 2014 0427 217 450 Approved by Operations Manager North/South Australian Rail Track Corporation FOR THE INFORMATION OF ALL QUALIFIED WORKERS AND USERS OF THE ARTC NETWORK 3 Figure 1: New Infrastructure configuration Kooragang for Arrival Roads 1, 2, 3 and 4 to the PWCS dump stations at Kooragang Coal Terminal. FOR THE INFORMATION OF ALL QUALIFIED WORKERS AND USERS OF THE ARTC NETWORK 4
© Copyright 2024 ExpyDoc