NETWORK RAIL New Steelwork Specification XN90/N4 PROTECTIVE SYSTEM XN90/N4-095: Epoxy MIO Protective System FOR THIS ENVIRONMENT: Epoxy MIO Paint System: Life to First Major Maintenance: C2, C3, C4, C5-I, C5-M (BS EN ISO 12944-2) Up to 25 years SPECIFICATION: Surface Preparation: Coat Primer Intermediate Intermediate Finish Blast-clean to Sa2½ (BS EN ISO 8501-1). Surface profile within the range of 70-100m. Material mdft Applied (m) Metagard K232 Zinc Rich 50 Shop Primer Epigrip C267V2 Epoxy MIO 125 Shop Epigrip C267V2 Epoxy MIO 125 Shop Leighs C750V2 Special 50 Shop Finish PADS Reference: 028/980576 Notes on this Specification: Grit abrasives to be used unless otherwise specified. All film thicknesses shown are minimums. A stripe coat of Epigrip C267V2 at 75m mdft is applied by brush between coats 2 and 3. Please see the Leighs C750V2 Technical Data Sheet for recommendations for overcoating of epoxies. It may be necessary to apply more than one coat of finish for certain colour shades (e.g. some pastel shades and bright strong colours). All materials should be obtained from Sherwin-Williams and must be applied in accordance with the relevant Technical Data Sheet. Sherwin-Williams, Tower Works, Kestor Street, Bolton, BL2 2AL, England UK Tel: +44 (0) 1204 521771 Fax: +44 (0) 1204 382115 email: [email protected] website: www.sherwin-williams.com/protectiveEMEA SW1 02/2014 Repair Procedure for Damage Resulting From Transport, Erection, etc The following procedure applies to remedial work of areas of the protective system that have been damaged during transit or erection and includes that caused by any site welding operations. The damaged area shall receive remedial preparation and painting equivalent to the specified protective system. Damaged paintwork should be prepared back to a feathered edge of sound paint. This area, together with a further 50mm into the adjacent areas of sound paintwork, should be appropriately prepared and cleaned down. All paint coats should be applied such that the edges of the sound protective system are enveloped. NATURE OF DAMAGE REMEDIAL TREATMENT Damage to top coat only Lightly abrade and clean down all areas to receive paint. Carefully touch in with one coat of Leighs C750V2 Special Finish to give a minimum dry film thickness of 50m. Prepare as above and carefully touch in with one or two coats of Epigrip C267V2 Epoxy MIO to give a minimum dry film thickness of 125m/coat (depending on depth of damage). Apply one coat of Leighs C750V2 Special Finish to give a minimum dry film thickness of 50m. Spot abrasive blast-clean the exposed steel area in accordance with BS EN ISO 8501-1 to achieve a surface standard of Sa2½. Spot prime the exposed steel with one coat of Metagard K232 Zinc Rich Primer and carefully touch in with two coats of Epigrip C267V2 Epoxy MIO and Leighs C750V2 Special Finish to give minimum dry film thicknesses of 125µm, 125µm and 50m respectively. Damage to top coat and intermediate coat(s) Damage to top coat, intermediate coat(s) and primer Product Information: The following products are components of Network Rail Protective System N4 and are relevant to Sherwin-Williams Registration Certificate Reference XN90/N2-095. These should be used in accordance with the appropriate Product Data Sheets and Network Rail Guidance Note NR/GN/CIV/002: The Use of Protective Coatings and Sealants. Item No. Product Description Volume Solids (%) WFT (µm) DFT (µm) Theoretical Coverage 2 (m /ltr) Minimum Overcoating o Time (20 C) 7.1.3 Metagard K232 Zinc Rich Primer Epigrip C267V2 Epoxy MIO Epigrip C267V2 Epoxy MIO Leighs C750V2 Special Finish 45 111 50 9.0 2½ hrs 75 75 53 167 167 94 125 125 50 6.0 6.0 10.6 5 hrs 5 hrs 4½ hrs 7.2.2 7.2.2 - N.B. The above table is for guidance only. Refer to the appropriate product data sheet for more detail. Sherwin-Williams, Tower Works, Kestor Street, Bolton, BL2 2AL, England UK Tel: +44 (0) 1204 521771 Fax: +44 (0) 1204 382115 email: [email protected] website: www.sherwin-williams.com/protectiveEMEA SW1 02/2014
© Copyright 2024 ExpyDoc