SDE(EP) - 1

NOTICE INVITING QUOTATION
No. NIQ/EEE/BSNL/PN/701
Date 04.12.2014
The Executive Engineer [E], Bharat Sanchar Nigam Ltd., Electrical Division, 1st Floor,
Telephone Exchange, Model Colony, Lakaki Road, Pune - 411016, invites on behalf of the
B.S.N.L. sealed item rate quotations for the following work, for the following work from BSNL
Enlisted Electrical contractors.
Sl.
No.
Name of Work
Estimated Cost
1
Managing
&
Caretaking
of
electromechanical services at Telecom compound,
Baramati, Pune.
(NIQ No. 113/EEE/BSNL/PN/14-15)
Rs 38298.00
Time Limit
Two Months.
Documentary proof of satisfying above conditions, and towards deposition of income tax and Valid
Maharashtra / Goa Value Added Tax Registration & Service Tax Registration. Agency should submit
attested copy of PAN Card.
Last date & time of submission of quotation
Last date & time of opening of quotation
:
:
08.12.2014
08.12.2014
upto 15.00 hours
at 15:30 hours
Conditions and quotation forms can be obtained from this office or can be downloaded from
following website www.maharashtra.bsnl.co.in.
Quotation can be submitted either in the enclosed sheet along with covering letter on printed
letter head or it can be typed on printed letterhead. Name of work shall be clearly written on the
sealed cover.
Executive Engineer (E)
BSNL, Electrical Division, Pune-16.
Copy to: 1. The Superintending Engineer (E), BSNL Electrical Circle, Mumbai.
2. Concerned Contractors.
3. Notice Board & Maharashtra Intranet Portal
Executive Engineer (E)
UNDERTAKING BY CONTRACTOR
ONLY IF THE QUOTATION DOCUMENT IS DOWNLOADED FROM WEBSITE
I / We wish to state that the quotation document was downloaded by me / us from the website
and the same quotation document is sealed and submitted. In case, if there is any change
between the document submitted by me / us and the Draft NIQ, then, the Draft NIQ shall prevail.
Signature of Contractor with SEAL
SDE(EP)
-1-
EE(E)
SCHEDULE OF QUANTITY
Name of Work: - Managing & Caretaking of electro-mechanical services at Telecom
compound, Baramati, Pune
Sr.No.
Description
1
Managing & Caretaking of electromechanical services as per details
given under heading "Size of
services" at T.E. Building Baramati
including monitoring, reporting,
operation of electro-mechanical
services as & when required.
(Note : The EPF will be reimbursed
on submission of documentary
evidence)
Qty.
02 Months
Rate
Unit
Amount
Month
Total :
TERMS AND CONDITIONS:
1) Rates offered by the firms shall be inclusive of all taxes, levies, transportation etc. but exclusive of service
tax and EPF.
2) The firm shall claim service tax with the bill clearly furnishing the complete details of service tax so included.
BSNL, under no circumstances, will consider any claim of service tax not included in the bill. It will be the
firm’s responsibility to settle service tax with service tax authorities. The EPF will be reimbursed on
submission of documentary evidence.
3) No T&P shall be issued to the contractor
4) Payment will be made only after completion of work
5) BSNL has full right to reject all or part of the quotations without giving any reason.
6) Work order shall be given as per CPWD-11 format.
7) Proportionate amount will be deducted from the payment for the period during which services are not
provided.
ADDITIONAL SPECIFICATION
1. The work shall be done as per current CPWD specification for electrical works as amended from time to
time and Indian electricity rules as amended up to date.
2. The work shall be supervised by a qualified Supervisor.
3. The layout of the work will be given by the Engineer-in-charge or his duly authorized representative at
site of work.
4. Unapproved materials if brought to site of work shall have to be removed immediately by contractor at
his cost and risk.
5. The contractor will have to give the following tests at his cost & intimate test results before final bills are
paid. Nothing extra will be paid to him on this account.
a. a) Earth test.
b) Polarity test.
b. c) Insulation test.
d) Earth continuity test.
6. Any damage done to the building by the contractor during the execution of work shall have to be
a. made good at his cost and risk. If he does not do it himself within a reasonable time as
determined
b. by the Executive Engineer (E) then the same will be got done at his cost departmentally after
giving
c. notice to him.
7. While making the end connections of wires, no strand shall be cut and the termination of wire shall
a. be done with necessary lugs and ferrules without any extra payment.
8.
All the Material to be supplied shall be got approved by Engineer-in-charge or his representative.
SDE(EP)
-2-
EE(E)
SIZE OF VARIOUS SERVICES
At Telephone Exchange Building Baramati
(The details in this section are approximate to give an idea of services to be maintained)
A EI & Fans:
(i) Size of Building –
New Bldg.
Old Bldg.
(ii) TE Building:
Light Points:
Fan Points:
Plug Points:
No. of Floors
G+2
G+1
339 points
89 points
58 points - 5A
32 points -15A
14 Nos
02 Nos
Tapped from substation earth
SDB’s:
Main board
Earth Stations
(iii) Staff Quarters:
No of
quarter
Type II
08
Type III
08
Area per Floor
741 sq mtr / flr
280 sq mtr / flr
Light points
Fan points
Plug points
SDB’s
135
140
24
30
10
11
08
08
(iv) Cooling & Heating Appliances:
Geysers, Room Heaters
(v)
NIL
Lightning Conductor:
Size of building :
No. of down conductors
No. of finials
No. of earth stations
(vi) Compound Lighting:
No. of Poles
741 sq mtr New Bldg. + 280 sq mtr Old Bldg.
06 Nos.
04 Nos.
06 Nos.
Year of Installation :- 1994
No. of Fittings
HPSV
16 Nos.
18 Nos.
B
HPMV
03 Nos.
Fluorescent
04 Nos.
Water Pumps:
Year of Installation
No. Of Pumps
Capacity of Pumps
Type of Pumps
Sump Pump / Drainage Pump
SDE(EP)
2013
02 Nos.
3 HP
Monoblock
NIL
-3-
1994
01 No.
3.35HP
Submersible
EE(E)
C
AC Package Units: Re-commissioned on 2014 (Units shifted from T.E.
Pirangut - 15/06/2000 Date of A/T at Pirangut )
Name and location
D
First floor – AC plant
Room for MBM Switch
Room
A/C Appliances
No. of
units
5
Size of Package unit
7 TR each
(Make - M/s Singhsons Refrigeration,
Mumbai)
No. of :
Water cooler
01 no. 15 ltr, M/s Blue Star make
Window A/C Units
Split A/C Units
E
04 nos. x 1.5TR
01 no. 2TR + 01 no. 2 x 1.5TR multi-split
unit
Year of Installation :- 1994
Fire Detection System:
Size of Building -
No. of Floors
Area per Floor
G + 2 Floors
741 Sq. Meter
01 No., 10 Zone at ground floor
02 Nos. (01 no.,12 Zone at first floor & 01
no., 04 Zone at second floor)
Details of MCP:
Details of LCP:
F
No. Of Detectors:
(i) Smoke
(ii) Heat
Fire Fighting System:
Fire Extinguishers:
G
EA Sets:
Total No. of EA Sets Details:
Engine Make
116 Nos.
06 Nos.
NA
Type
Capacity
Numbers
CO2
4.5 kg
17
Re-commissioned on 2014 (EA Sets
shifted from T.E. Pirangut - 2000 Year of
A/T at Pirangut )
02 Sets.
Model
BHP
Water / Air Cooled
AlternatorCapacity (KVA)
Make
Type
Model
No. of LT Panels No. of Earth Stations Interconnection with cables / bustrunking –
SDE(EP)
-4-
M/s KOEL
M/s KOEL
6SL 9088T
154 HP
Water-cooled
6SL 9088T
154 HP
Water-cooled
125
CROMPTON
GREAVES
Brushless
G125NRF
02 Nos.
06 Nos.
Cables
125
CROMPTON
GREAVES
Brushless
G125NRF
EE(E)
H
Sub-Station:
Single line diagram of substation including HT-TR-LT
Panel with sizes of switches
Capacity – (KVA):
HT Voltage – (KV):
Indoor / Outdoor Single Line Diagram of Sub-Station
including HT-TR-LT panel with
sizes of switches –
Transformers –
Year of Installation :- 1994
02 X 250 KVA
22 KV
Indoor
Year Of Mfg. 1988
Re-commissioned in Jan. 2002
Quantity
Capacity (KVA)
Make
02
250
Mahati
HT Panel – M/s. Eswaran Make – 03 Nos. Type : 24 MG, 25 KA, 1600 A
OCB – 3 Nos.
LT Panel – (Including LT Panels installed elsewhere in the building)
Quantity
03 Nos.
No. of Earth Stations
06 Nos.
Capacitor Panel No. & Salient Details
02 Nos. x 125kVAR capacitor panel
with Syntron make Automatic Power
Factor Control Relay and Capacitors of5 KVAR –
02 Nos.
10 KVAR02 Nos.
25 KVAR –
08 Nos.
Over head bus trunking (length)/capacity 1200 A
Interconnection with cables / bus trunking
SDE(EP)
-5-
Bus trunking
EE(E)