I-710 Schematic Geometric Plans Reviews for Alternatives

Los Angeles County Metropolitan
Transportation Authority
I-710 Schematic Geometric
Plans Reviews
for
Alternatives 5C & 7
presented to the
Technical Advisory Committee
February 19, 2014
Geometric Focus
2
Alternative 1
• Hot Spots
Alternative 5C
• Truck Bypass
• Buffered Lanes
• Ramp Braiding
Alternative 7
• Freight Corridor Access Points
• Between Freeway & Freight Corridor
• Between Local Street & Freight Corridor
2
3
3
3
1.6 miles
ALT 1
SR-60
I-5
7.4 miles
4
I-105
4
2.7 miles
5
SR-91
3
3.6 miles
4
3
2.5 miles
I-405
3
3
1.6 miles
SR-1
2
OCEAN
EXISTING THRU LANES IN EACH DIRECTION
3
ALT 1
I-5
NORTH
WASHINGTON
ATLANTIC/BANDINI
FLORENCE
CENTRAL
FIRESTONE/SOUTHERN
IMPERIAL
I-105
ROSECRANS
ALONDRA
SR-91
SR91
DEL AMO
I-405
I-405
SANTA FE /
WARDLOW
WILLOW
SOUTH
PCH-ANAHEIM
PICO
Freeway
Hot Spot
DOWNTOWN
I-710
Local
Hot Spot
4
Alternative 1
5
What is a Freeway HOT SPOT?
• High conflict area where incidents
frequently occur
• Correlates with recorded accidents
• Safety and Operation are influenced by
incidents, which include:
• Slowing caused by merging and weaving
• Near misses
• Collisions
5
6
Hot Spot Example:
SB 405 Merging into SB 710
Anatomy of a Merge
Merge: Looking Ahead
Merge: Looking Behind
7
Weaving Example
Short
Distance
Entrance
8
Anatomy of a Weave
Begin Weave: Driver starts from left
Slow truck in front starts on right
9
Anatomy of a Weave
Driver slows & moves right
Driver completes weave over short distance
10
Why do freeways stop?
11
• An incident occurs
• Drivers slow to maintain a safe distance
• Drivers further back see brake lights and slow
down
When traffic volume increases, the frequency
of incidents increases, especially at Hot Spots
Analogy: Water through a funnel
Design Strategies
12
Improve Merging
by adding Auxiliary
Lanes:
• Increases distance
to merge safely
• Reduces incidents
• Reduces
congestion
1
13
Design Strategies
Eliminate Short
Weaving Areas
by Braiding Ramps:
• Eliminates conflict
zone
• Reduces incidents
• Reduces
Over
congestion
Under
1
PRELIMINARY CONCEPT – FOR DICUSSION PURPOSES ONLY
SR-60
Major Infrastructure
Components:
ALT 5C
I-5
• Additional Through Lanes (1 per
direction) Where Needed
• Modernization: Reconfigure
Interchanges and Add Auxiliary
Lanes
Corridor ZE/NZE
Strategies:
• Truck Commercialization
• Incentive Programs
• Exposure Reduction Programs
I-105
SR-91
I-405
Truck Bypass Lane
Buffered Downtown Only Lane
General Purpose Lane
SR-1
OCEAN
Auxiliary Lane / Ramp
Freeway Interchange
Geometric Redesign
Local Interchange
Geometric Redesign
Minor Local Interchange
Improvement
14
PRELIMINARY CONCEPT – FOR DICUSSION PURPOSES ONLY
SR-60
Major Infrastructure
Components:
ALT 7
I-5
• 4-Lane, ZE/NZE Freight Corridor
• Modernization: Reconfigure
Interchanges and Add Auxiliary
Lanes
• No Additional Through Lanes
Corridor ZE/NZE
Strategies:
• Truck Commercialization
• Incentive Programs
• Exposure Reduction Programs
I-105
SR-91
Del Amo
I-405
Freight Corridor Lanes
Freight Corridor Ramps
General Purpose Lane
Auxiliary Lane / Ramp
SR-1
Freeway Interchange
Geometric Redesign
Local Interchange
Geometric Redesign
Minor Local Interchange
Improvement
Shoemaker Bridge
OCEAN
15