Rancho Santiago Community College District Weekly Construction Update April 25, 2014 Parking Lot #11 Expansion, Road Improvements, Retention Basin Architect: W+W Architects Construction Manager: Linik Corp. Contractor: McCarthy Building Companies, Inc. Contract Start: 3/3/14 Contract Completion: 9/30/14 Scope: One of three projects within the Campus Improvements Package 4 Project. This project includes replacing the old soccer field with a new parking lot that will include a new accessible ADA parking and an electric car charging station. Enhancement of storm drainage system to provide a retention system that will divert storm runoff back into the natural aquifer. Construction Alerts: • Partial closure of north-bound lane on College Ave. to tie-in to existing storm drain line. Flagmen will be present to direct 2-way traffic along the south-bound lane, anticipated 4/26/14. Issued on 4/24/14 to SAC Campus. • Shoring is scheduled to begin within the construction area, and an increase in noise and vibration activities will occur in the ball field area and Parking Lot #9, anticipated 4/28/14-5/2/14. Issued on 4/25/14 to SAC Campus. • Excavation is anticipated to begin within the construction area and an increase in noise will occur near the ball fields, anticipated 4/28/14-5/2/14. Issued on 4/25/14 to SAC Campus. Status: Recent construction activities are listed below: • Rough Grading operations • Install shoring beams at the Retention Basin • Underground utilities at Parking Lot #11 Upcoming and Current Activities: • Excavation at West Retention Basin • Install shoring beams at East Retention Basin • Fine grading operations at Parking Lot #11 • Underground utilities at Parking Lot #11 Shoring beams installed between ball fields and tennis courts. Grading and underground utility operations at Parking Lot #11. Rancho Santiago Community College District Weekly Construction Update April 25, 2014 Planetarium Upgrade & Restroom Addition Architect: W+W Architects Construction Manager: Linik Corp. Contractor: McCarthy Building Companies, Inc. Contract Start: 3/3/14 Contract Completion: 9/30/14 Scope: One of three projects within the Campus Improvements Package 4 Project. This project includes renovating the existing Tessmann Planetarium, enhancing the building exterior and constructing a new restroom annex. Construction Alerts: • Partial closure of north-bound lane on College Ave. to tie-in to existing storm drain line. Flagmen will be present to direct 2-way traffic along the south-bound lane, anticipated 4/26/14. Issued on 4/24/14 to SAC Campus. • Shoring is scheduled to begin within the construction area, and an increase in noise and vibration activities will occur in the ball field area and Parking Lot #9, anticipated 4/28/14-5/2/14. Issued on 4/25/14 to SAC Campus. • Excavation is anticipated to begin within the construction area and an increase in noise will occur near the ball fields, anticipated 4/28/14-5/2/14. Issued on 4/25/14 to SAC Campus. Status: Recent construction activities are listed below: • Site concrete demolition • Rough grading operations • Underground utilities Upcoming and Current Activities: • Rough grading operations • Underground utilities Rough grading and underground utility operations on south side of Building M. Trenching on east side of Building M. Activity ID Activity Name Orig Dur Start 2014 Finish Apr 27 M Tue W T Fri Sat S May 04 M Tue W T Fri Sat S May 11 M Tue W T Fri Sat S May 18 M Tue W Thu Fri Sat S May 25 M Tue W Thu Fri Sat S Jun 01 Jun 08 M Tue W Thu Fri Sat S M RSCCD - Santa Ana College Tessmann Upgrade, Parking Lot #11 and Temporary Village Reflection Overall Project Summary and Milestones SUM-115 Parking Lot #11 Expansion Summary 90 13-Mar-14 A 18-Jul-14 SUM-125 Tessmann Planetarium Upgrade Summary 141 13-Mar-14 A 16-Oct-14 Preconstruction Submittals Contracts PR-125 Award Priority 2 Contracts 24 03-Mar-14 A 28-Apr-14 PR-135 Award Priority 3 Contracts 30 03-Mar-14 A 02-May-14 10 07-May-14 20-May-14 24-Apr-14 A 28-Apr-14 Award Priority 2 Contracts Award Priority 3 Contracts Underground Chilled Water Submittals PR18-145 Fab/Deliver: Underground Chilled Water Submittals Fab/Deliver: Underground Chilled Water Submittals Fragnet #10 - RFI #36 & 36.1 Chilled Water Submittal FR10-125 RFI #36.1 Written / Response 5 FR10-135 Revise & Resubmit Chilled Water 3 29-Apr-14 01-May-14 FR10-145 A/E Approve Chilled Water Submittal 3 02-May-14 06-May-14 PR01-135 A/E Approval: Rebar 2 28-Apr-14 29-Apr-14 PR01-145 Fab/Deliver: Rebar 5 30-Apr-14 06-May-14 20 27-Mar-14 A 09-May-14 RFI #36.1 Written / Response Revise & Resubmit Chilled Water A/E Approve Chilled Water Submittal Rebar Submittals A/E Approval: Rebar Fab/Deliver: Rebar Masonry Submittals PR02-145 Fab/Deliver: Masonry Fab/Deliver: Masonry Roofing Submittals PR13-115 Submittal Prep: Roofing 10 07-Apr-14 A 30-Apr-14 PR13-125 McCarthy Review: Roofing 2 01-May-14 02-May-14 PR13-135 A/E Approval: Roofing 10 05-May-14 16-May-14 Submittal Prep: Roofing McCarthy Review: Roofing A/E Approval: Roofing Trellis Steel Submittals PR10-135 A/E Approval: Trellis Steel 10 24-Apr-14 A 07-May-14 PR10-145 Fab/Deliver: Trellis Steel 15 08-May-14 29-May-14 A/E Approval: Trellis Steel Fab/Deliver: Trellis Steel Canopy Steel Submittals PR10-165 McCarthy Review: Canopy Steel 2 25-Apr-14 A 28-Apr-14 PR10-175 A/E Approval: Canopy Steel 10 29-Apr-14 12-May-14 McCarthy Review: Canopy Steel PR10-185 Fab/Deliver: Canopy Steel 15 13-May-14 03-Jun-14 35 18-Apr-14 A 06-Jun-14 Fab/Deliver: M 30 16-Apr-14 A 06-Jun-14 Fab/Deliver: C A/E Approval: Canopy Steel Fab/Deliver: Canopy Steel Modular Building Submittals PR04-145 Fab/Deliver: Modular Buildings Precast CDS Water Treatment System Submittals PR03-145 Fab/Deliver: CDS Water Treatment Exhaust Fan Submittals PR05-125 McCarthy Review: EF's 2 08-Apr-14 A 02-May-14 PR05-135 A/E Approval: EF's 10 05-May-14 16-May-14 McCarthy Review: EF's A/E Approval: EF's Gravity Ventilator Submittals PR06-125 McCarthy Review: Gravity Ventilator 2 08-Apr-14 A 02-May-14 PR06-135 A/E Approval: Gravity Ventilator 10 05-May-14 16-May-14 McCarthy Review: Gravity Ventilator A/E Approval: Gravity Ventilator Storefront Submittals PR07-115 Submittal Prep: Storefront 10 15-Apr-14 A 09-May-14 PR07-125 McCarthy Review: Storefront 2 12-May-14 13-May-14 PR07-135 A/E Approval: Storefront 10 14-May-14 28-May-14 10 10-Mar-14 A 28-Apr-14 Submittal Prep: Storefront McCarthy Review: Storefront A/E Approval: Storefront Planting Submittals PR19-115 Submittal Prep: Planting Remaining Level of Effort Milestone Submittal Prep: Planting McCarthy Building Companies, Inc. Page: 1 of 3 Actual Level of Effort Actual Work Remaining Work Critical Remaining Work RSCCD - Santa Ana College Tessmann Upgrade, Parking Lot #11 and Temporary Village Reflection Three Week Look-Ahead Data Date: 28-Apr-14 Activity ID Activity Name Orig Dur Start 2014 Finish Apr 27 May 04 M Tue W T Fri Sat S M Tue W T McCarthy Review: Planting Fri Sat S May 11 M Tue W T Fri Sat S May 18 M Tue W Thu Fri Sat PR19-125 McCarthy Review: Planting 2 29-Apr-14 30-Apr-14 PR19-135 A/E Approval: Planting 10 01-May-14 14-May-14 PR19-145 Tag/Deliver: Trees 15 15-May-14 05-Jun-14 10 05-May-14 16-May-14 Submittal Prep: Eco-Mesh Screens 10 05-May-14 16-May-14 Submittal Prep: Ceramic Tile 10 05-May-14 16-May-14 Submittal Prep: Metal Panel Soffits 10 05-May-14 16-May-14 Submittal Prep: Display Windows 23-Apr-14 A 29-Apr-14 S May 25 M Tue W Thu Fri Sat S Jun 01 Jun 08 M Tue W Thu Fri Sat S M A/E Approval: Planting Tag/Deliver: Trees Eco-Mesh Screens Submittals PR08-115 Submittal Prep: Eco-Mesh Screens Ceramic Tile Submittals PR09-115 Submittal Prep: Ceramic Tile Metal Panel Soffit Submittals PR11-115 Submittal Prep: Metal Panel Soffits Display Window Submittals PR12-115 Submittal Prep: Display Windows Construction Parking Lot #11 Expansion and Improvements Site Utilities Storm Drain LOT#11-835 Excavate, Pipe, Inspect and Backfill Storm Drain Lines - South 7 Excavate, Pipe, Inspect and Backfill Storm Drain Lines - South Domestic Water LOT#11-225 Excavate, Pipe, Inspect and Backfill Domestic Water and Fire 7 Water 28-Apr-14 Lines 06-May-14 Excavate, Pipe, Inspect and Backfill Domestic Water and Fire Water Lines LOT#11-245 Excavate, Pipe, Inspect and Backfill Site Electrical - North 5 24-Apr-14 A 30-Apr-14 LOT#11-845 Excavate, Pipe, Inspect and Backfill Site Electrical - South 5 01-May-14 07-May-14 Excavate, Pipe, Inspect and Backfill Site Irrigation 5 28-Apr-14 02-May-14 Excavate, Pipe, Inspect and Backfill Site Irrigation Excavate Footings Electrical Excavate, Pipe, Inspect and Backfill Site Electrical - North Excavate, Pipe, Inspect and Backfill Site Electrical - South Irrigation LOT#11-885 North Pedestrian Walkway East Side NPW-E-115 Excavate Footings 2 01-May-14 02-May-14 NPW-E-125 Rebar / Anchor Bolts / Dowel Footings 2 07-May-14 08-May-14 NPW-E-135 Pour Footings 1 09-May-14 09-May-14 NPW-E-145 Set Camera Poles 1 12-May-14 12-May-14 Set Camera Poles NPW-E-155 Electrical Rough-in at CMU 1 12-May-14 12-May-14 Electrical Rough-in at CMU NPW-E-165 CMU Columns / Fence Pilasters 6 12-May-14 19-May-14 NPW-W-115 Excavate Footings 2 05-May-14 06-May-14 NPW-W-125 Rebar / Anchor Bolts / Dowel Footings 2 09-May-14 12-May-14 NPW-W-135 Pour Footings 1 13-May-14 13-May-14 NPW-W-145 Set Camera Poles 1 14-May-14 14-May-14 Set Camera Poles NPW-W-155 Electrical Rough-in at CMU 1 14-May-14 14-May-14 Electrical Rough-in at CMU Rebar / Anchor Bolts / Dowel Footings Pour Footings CMU Columns / Fence Pilasters West Side Excavate Footings Rebar / Anchor Bolts / Dowel Footings Pour Footings Parking Lot #11 Buildout LOT#11-455 Grade for Curbs 3 07-May-14 09-May-14 LOT#11-495 Base for Curbs 2 12-May-14 13-May-14 LOT#11-405 F/R/P Curb & Gutter 5 14-May-14 20-May-14 Grade for Curbs Base for Curbs F/R/P Curb & Gutter Fragnet #01 - South Access Road Phasing FR01-155 Excavate, Pipe, Inspect and Backfill Irrigation Crossing (Off2Hours) 28-Apr-14 29-Apr-14 FR01-145 Excavate, Pipe, Inspect and Backfill Electrical Crossing (Off2Hours)06-May-14 07-May-14 FR01-135 Excavate, Pipe, Inspect and Backfill Storm Drain Crossing 2(Off Hours) 07-May-14 08-May-14 Excavate, Pipe, Inspect and Backfill Irrigation Crossing (Off Hours) Excavate, Pipe, Inspect and Backfill Electrical Crossing (Off Hours) Excavate, Pipe, Inspect and Backfill Storm Drain Crossing (Off Hours) Illuminated Sign on Bristol St. SIGN-115 Underground Electrical Rough-in 2 08-May-14 09-May-14 SIGN-125 Excavate Footing 1 12-May-14 12-May-14 Remaining Level of Effort Milestone Underground Electrical Rough-in Excavate Footing McCarthy Building Companies, Inc. Page: 2 of 3 Actual Level of Effort Actual Work Remaining Work Critical Remaining Work RSCCD - Santa Ana College Tessmann Upgrade, Parking Lot #11 and Temporary Village Reflection Three Week Look-Ahead Data Date: 28-Apr-14 Activity ID Activity Name Orig Dur Start Finish Apr 27 M Tue W T SIGN-135 Rebar / Anchor Bolts Footing 2 13-May-14 14-May-14 SIGN-145 Form Footing 1 15-May-14 15-May-14 SIGN-155 Pour Footing 1 16-May-14 16-May-14 10 16-Apr-14 A 02-May-14 3 25-Apr-14 A 28-Apr-14 Fri Sat S May 04 M Tue W T Fri Sat S 2014 May 11 May 18 M Tue W T Fri Sat S M Tue W Thu Fri Sat Rebar / Anchor Bolts Footing S May 25 M Tue W Thu Fri Sat S Jun 01 Jun 08 M Tue W Thu Fri Sat S M Form Footing Pour Footing Storm Water Retention Basin Utility Re-Route & Shoring LOT#11-805 Install Shoring Beams / Plates Install Shoring Beams / Plates Fragnet #08 - Unforeseen Irrigation Conflict with Shoring FR08-185 Repair Irrigation Line and Wires Repair Irrigation Line and Wires Phase 1 - Retention Basin LOT#11-635 Excavate Retention Basins 5 05-May-14 09-May-14 LOT#11-665 Initial Gravel Base 3 12-May-14 14-May-14 LOT#11-675 Install Percolation System 10 15-May-14 29-May-14 Excavate Retention Basins Initial Gravel Base Install Percolation System Tessmann Planetarium Upgrade and Restroom Addition Site Preparation TP-SP-135 Establish SWPPP / Track-out Pads 1 09-May-14 09-May-14 Establish SWPPP / Track-out Pads TP-SP-205 Survey / Stake for Grading 1 09-May-14 09-May-14 Survey / Stake for Grading TP-SP-215 Rough Grade Site 4 12-May-14 15-May-14 Rough Grade Site Fragnet #09 - Unforeseen Transite Pipe FR09-125 RFI #32 Written / Response 2 18-Apr-14 A 28-Apr-14 FR09-155 Notification to AQMD for Abatement 10 23-Apr-14 A 06-May-14 FR09-145 LVI to Remove Asbestos Pipe 2 07-May-14 08-May-14 Demo / Remove (E) Tree 1 02-May-14 02-May-14 TP-UTIL-115 Excavate, Pipe, Inspect and Backfill Storm Drain Lines 5 25-Apr-14 A 01-May-14 TP-UTIL-125 Excavate, Pipe, Inspect and Backfill Sewer Lines 3 05-May-14 07-May-14 TP-UTIL-135 Excavate, Pipe, Inspect and Backfill Domestic Water Lines4 16-May-14 21-May-14 RFI #32 Written / Response Notification to AQMD for Abatement LVI to Remove Asbestos Pipe Fragnet #11 - Tree Removal for Sewer Line FR11-125 Demo / Remove (E) Tree Site Utilities Remaining Level of Effort Milestone Excavate, Pipe, Inspect and Backfill Storm Drain Lines Excavate, Pipe, Inspect and Backfill Sewer Lines Excavate, Pipe, Inspect and Backfill Domestic Water Lines McCarthy Building Companies, Inc. Page: 3 of 3 Actual Level of Effort Actual Work Remaining Work Critical Remaining Work RSCCD - Santa Ana College Tessmann Upgrade, Parking Lot #11 and Temporary Village Reflection Three Week Look-Ahead Data Date: 28-Apr-14
© Copyright 2024 ExpyDoc