Rancho Santiago Community College DistrictWeekly Construction

Rancho Santiago Community College District
Weekly Construction Update
April 25, 2014
Parking Lot #11 Expansion, Road Improvements, Retention Basin
Architect: W+W Architects
Construction Manager: Linik Corp.
Contractor: McCarthy Building Companies, Inc.
Contract Start: 3/3/14
Contract Completion: 9/30/14
Scope: One of three projects within the Campus Improvements Package 4 Project. This project includes replacing the old soccer field with a
new parking lot that will include a new accessible ADA parking and an electric car charging station. Enhancement of storm drainage system
to provide a retention system that will divert storm runoff back into the natural aquifer.
Construction Alerts:
•
Partial closure of north-bound lane on College Ave. to tie-in to existing storm drain line. Flagmen will be present to direct
2-way traffic along the south-bound lane, anticipated 4/26/14. Issued on 4/24/14 to SAC Campus.
•
Shoring is scheduled to begin within the construction area, and an increase in noise and vibration activities will occur in
the ball field area and Parking Lot #9, anticipated 4/28/14-5/2/14. Issued on 4/25/14 to SAC Campus.
•
Excavation is anticipated to begin within the construction area and an increase in noise will occur near the ball fields,
anticipated 4/28/14-5/2/14. Issued on 4/25/14 to SAC Campus.
Status: Recent construction activities are listed below:
•
Rough Grading operations
•
Install shoring beams at the Retention Basin
•
Underground utilities at Parking Lot #11
Upcoming and Current Activities:
•
Excavation at West Retention Basin
•
Install shoring beams at East Retention Basin
•
Fine grading operations at Parking Lot #11
•
Underground utilities at Parking Lot #11
Shoring beams installed between ball fields and tennis
courts.
Grading and underground utility operations at Parking Lot
#11.
Rancho Santiago Community College District
Weekly Construction Update
April 25, 2014
Planetarium Upgrade & Restroom Addition
Architect: W+W Architects
Construction Manager: Linik Corp.
Contractor: McCarthy Building Companies, Inc.
Contract Start: 3/3/14
Contract Completion: 9/30/14
Scope: One of three projects within the Campus Improvements Package 4 Project. This project includes renovating the existing
Tessmann Planetarium, enhancing the building exterior and constructing a new restroom annex.
Construction Alerts:
•
Partial closure of north-bound lane on College Ave. to tie-in to existing storm drain line. Flagmen will be present to direct
2-way traffic along the south-bound lane, anticipated 4/26/14. Issued on 4/24/14 to SAC Campus.
•
Shoring is scheduled to begin within the construction area, and an increase in noise and vibration activities will occur in
the ball field area and Parking Lot #9, anticipated 4/28/14-5/2/14. Issued on 4/25/14 to SAC Campus.
•
Excavation is anticipated to begin within the construction area and an increase in noise will occur near the ball fields,
anticipated 4/28/14-5/2/14. Issued on 4/25/14 to SAC Campus.
Status: Recent construction activities are listed below:
•
Site concrete demolition
•
Rough grading operations
•
Underground utilities
Upcoming and Current Activities:
•
Rough grading operations
•
Underground utilities
Rough grading and underground utility
operations on south side of Building M.
Trenching on east side of Building M.
Activity ID
Activity Name
Orig
Dur
Start
2014
Finish
Apr 27
M Tue W T
Fri Sat
S
May 04
M Tue W T
Fri Sat
S
May 11
M Tue W T
Fri Sat
S
May 18
M Tue W Thu Fri Sat
S
May 25
M Tue W Thu Fri Sat
S
Jun 01
Jun 08
M Tue W Thu Fri Sat S M
RSCCD - Santa Ana College Tessmann Upgrade, Parking Lot #11 and Temporary Village Reflection
Overall Project Summary and Milestones
SUM-115
Parking Lot #11 Expansion Summary
90
13-Mar-14 A
18-Jul-14
SUM-125
Tessmann Planetarium Upgrade Summary
141
13-Mar-14 A
16-Oct-14
Preconstruction
Submittals
Contracts
PR-125
Award Priority 2 Contracts
24
03-Mar-14 A
28-Apr-14
PR-135
Award Priority 3 Contracts
30
03-Mar-14 A
02-May-14
10
07-May-14
20-May-14
24-Apr-14 A
28-Apr-14
Award Priority 2 Contracts
Award Priority 3 Contracts
Underground Chilled Water Submittals
PR18-145
Fab/Deliver: Underground Chilled Water Submittals
Fab/Deliver: Underground Chilled Water Submittals
Fragnet #10 - RFI #36 & 36.1 Chilled Water Submittal
FR10-125
RFI #36.1 Written / Response
5
FR10-135
Revise & Resubmit Chilled Water
3
29-Apr-14
01-May-14
FR10-145
A/E Approve Chilled Water Submittal
3
02-May-14
06-May-14
PR01-135
A/E Approval: Rebar
2
28-Apr-14
29-Apr-14
PR01-145
Fab/Deliver: Rebar
5
30-Apr-14
06-May-14
20
27-Mar-14 A
09-May-14
RFI #36.1 Written / Response
Revise & Resubmit Chilled Water
A/E Approve Chilled Water Submittal
Rebar Submittals
A/E Approval: Rebar
Fab/Deliver: Rebar
Masonry Submittals
PR02-145
Fab/Deliver: Masonry
Fab/Deliver: Masonry
Roofing Submittals
PR13-115
Submittal Prep: Roofing
10
07-Apr-14 A
30-Apr-14
PR13-125
McCarthy Review: Roofing
2
01-May-14
02-May-14
PR13-135
A/E Approval: Roofing
10
05-May-14
16-May-14
Submittal Prep: Roofing
McCarthy Review: Roofing
A/E Approval: Roofing
Trellis Steel Submittals
PR10-135
A/E Approval: Trellis Steel
10
24-Apr-14 A
07-May-14
PR10-145
Fab/Deliver: Trellis Steel
15
08-May-14
29-May-14
A/E Approval: Trellis Steel
Fab/Deliver: Trellis Steel
Canopy Steel Submittals
PR10-165
McCarthy Review: Canopy Steel
2
25-Apr-14 A
28-Apr-14
PR10-175
A/E Approval: Canopy Steel
10
29-Apr-14
12-May-14
McCarthy Review: Canopy Steel
PR10-185
Fab/Deliver: Canopy Steel
15
13-May-14
03-Jun-14
35
18-Apr-14 A
06-Jun-14
Fab/Deliver: M
30
16-Apr-14 A
06-Jun-14
Fab/Deliver: C
A/E Approval: Canopy Steel
Fab/Deliver: Canopy Steel
Modular Building Submittals
PR04-145
Fab/Deliver: Modular Buildings
Precast CDS Water Treatment System Submittals
PR03-145
Fab/Deliver: CDS Water Treatment
Exhaust Fan Submittals
PR05-125
McCarthy Review: EF's
2
08-Apr-14 A
02-May-14
PR05-135
A/E Approval: EF's
10
05-May-14
16-May-14
McCarthy Review: EF's
A/E Approval: EF's
Gravity Ventilator Submittals
PR06-125
McCarthy Review: Gravity Ventilator
2
08-Apr-14 A
02-May-14
PR06-135
A/E Approval: Gravity Ventilator
10
05-May-14
16-May-14
McCarthy Review: Gravity Ventilator
A/E Approval: Gravity Ventilator
Storefront Submittals
PR07-115
Submittal Prep: Storefront
10
15-Apr-14 A
09-May-14
PR07-125
McCarthy Review: Storefront
2
12-May-14
13-May-14
PR07-135
A/E Approval: Storefront
10
14-May-14
28-May-14
10
10-Mar-14 A
28-Apr-14
Submittal Prep: Storefront
McCarthy Review: Storefront
A/E Approval: Storefront
Planting Submittals
PR19-115
Submittal Prep: Planting
Remaining Level of Effort
Milestone
Submittal Prep: Planting
McCarthy Building Companies, Inc.
Page: 1 of 3
Actual Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
RSCCD - Santa Ana College Tessmann Upgrade, Parking Lot #11 and Temporary Village Reflection
Three Week Look-Ahead
Data Date: 28-Apr-14
Activity ID
Activity Name
Orig
Dur
Start
2014
Finish
Apr 27
May 04
M Tue W T Fri Sat S M Tue W T
McCarthy Review: Planting
Fri Sat
S
May 11
M Tue W T
Fri Sat
S
May 18
M Tue W Thu Fri Sat
PR19-125
McCarthy Review: Planting
2
29-Apr-14
30-Apr-14
PR19-135
A/E Approval: Planting
10
01-May-14
14-May-14
PR19-145
Tag/Deliver: Trees
15
15-May-14
05-Jun-14
10
05-May-14
16-May-14
Submittal Prep: Eco-Mesh Screens
10
05-May-14
16-May-14
Submittal Prep: Ceramic Tile
10
05-May-14
16-May-14
Submittal Prep: Metal Panel Soffits
10
05-May-14
16-May-14
Submittal Prep: Display Windows
23-Apr-14 A
29-Apr-14
S
May 25
M Tue W Thu Fri Sat
S
Jun 01
Jun 08
M Tue W Thu Fri Sat S M
A/E Approval: Planting
Tag/Deliver: Trees
Eco-Mesh Screens Submittals
PR08-115
Submittal Prep: Eco-Mesh Screens
Ceramic Tile Submittals
PR09-115
Submittal Prep: Ceramic Tile
Metal Panel Soffit Submittals
PR11-115
Submittal Prep: Metal Panel Soffits
Display Window Submittals
PR12-115
Submittal Prep: Display Windows
Construction
Parking Lot #11 Expansion and Improvements
Site Utilities
Storm Drain
LOT#11-835
Excavate, Pipe, Inspect and Backfill Storm Drain Lines - South
7
Excavate, Pipe, Inspect and Backfill Storm Drain Lines - South
Domestic Water
LOT#11-225
Excavate, Pipe, Inspect and Backfill Domestic Water and Fire
7 Water
28-Apr-14
Lines
06-May-14
Excavate, Pipe, Inspect and Backfill Domestic Water and Fire Water Lines
LOT#11-245
Excavate, Pipe, Inspect and Backfill Site Electrical - North 5
24-Apr-14 A
30-Apr-14
LOT#11-845
Excavate, Pipe, Inspect and Backfill Site Electrical - South 5
01-May-14
07-May-14
Excavate, Pipe, Inspect and Backfill Site Irrigation
5
28-Apr-14
02-May-14
Excavate, Pipe, Inspect and Backfill Site Irrigation
Excavate Footings
Electrical
Excavate, Pipe, Inspect and Backfill Site Electrical - North
Excavate, Pipe, Inspect and Backfill Site Electrical - South
Irrigation
LOT#11-885
North Pedestrian Walkway
East Side
NPW-E-115
Excavate Footings
2
01-May-14
02-May-14
NPW-E-125
Rebar / Anchor Bolts / Dowel Footings
2
07-May-14
08-May-14
NPW-E-135
Pour Footings
1
09-May-14
09-May-14
NPW-E-145
Set Camera Poles
1
12-May-14
12-May-14
Set Camera Poles
NPW-E-155
Electrical Rough-in at CMU
1
12-May-14
12-May-14
Electrical Rough-in at CMU
NPW-E-165
CMU Columns / Fence Pilasters
6
12-May-14
19-May-14
NPW-W-115
Excavate Footings
2
05-May-14
06-May-14
NPW-W-125
Rebar / Anchor Bolts / Dowel Footings
2
09-May-14
12-May-14
NPW-W-135
Pour Footings
1
13-May-14
13-May-14
NPW-W-145
Set Camera Poles
1
14-May-14
14-May-14
Set Camera Poles
NPW-W-155
Electrical Rough-in at CMU
1
14-May-14
14-May-14
Electrical Rough-in at CMU
Rebar / Anchor Bolts / Dowel Footings
Pour Footings
CMU Columns / Fence Pilasters
West Side
Excavate Footings
Rebar / Anchor Bolts / Dowel Footings
Pour Footings
Parking Lot #11 Buildout
LOT#11-455
Grade for Curbs
3
07-May-14
09-May-14
LOT#11-495
Base for Curbs
2
12-May-14
13-May-14
LOT#11-405
F/R/P Curb & Gutter
5
14-May-14
20-May-14
Grade for Curbs
Base for Curbs
F/R/P Curb & Gutter
Fragnet #01 - South Access Road Phasing
FR01-155
Excavate, Pipe, Inspect and Backfill Irrigation Crossing (Off2Hours) 28-Apr-14
29-Apr-14
FR01-145
Excavate, Pipe, Inspect and Backfill Electrical Crossing (Off2Hours)06-May-14
07-May-14
FR01-135
Excavate, Pipe, Inspect and Backfill Storm Drain Crossing 2(Off Hours)
07-May-14
08-May-14
Excavate, Pipe, Inspect and Backfill Irrigation Crossing (Off Hours)
Excavate, Pipe, Inspect and Backfill Electrical Crossing (Off Hours)
Excavate, Pipe, Inspect and Backfill Storm Drain Crossing (Off Hours)
Illuminated Sign on Bristol St.
SIGN-115
Underground Electrical Rough-in
2
08-May-14
09-May-14
SIGN-125
Excavate Footing
1
12-May-14
12-May-14
Remaining Level of Effort
Milestone
Underground Electrical Rough-in
Excavate Footing
McCarthy Building Companies, Inc.
Page: 2 of 3
Actual Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
RSCCD - Santa Ana College Tessmann Upgrade, Parking Lot #11 and Temporary Village Reflection
Three Week Look-Ahead
Data Date: 28-Apr-14
Activity ID
Activity Name
Orig
Dur
Start
Finish
Apr 27
M Tue W T
SIGN-135
Rebar / Anchor Bolts Footing
2
13-May-14
14-May-14
SIGN-145
Form Footing
1
15-May-14
15-May-14
SIGN-155
Pour Footing
1
16-May-14
16-May-14
10
16-Apr-14 A
02-May-14
3
25-Apr-14 A
28-Apr-14
Fri Sat
S
May 04
M Tue W T
Fri Sat
S
2014
May 11
May 18
M Tue W T Fri Sat S M Tue W Thu Fri Sat
Rebar / Anchor Bolts Footing
S
May 25
M Tue W Thu Fri Sat
S
Jun 01
Jun 08
M Tue W Thu Fri Sat S M
Form Footing
Pour Footing
Storm Water Retention Basin
Utility Re-Route & Shoring
LOT#11-805
Install Shoring Beams / Plates
Install Shoring Beams / Plates
Fragnet #08 - Unforeseen Irrigation Conflict with Shoring
FR08-185
Repair Irrigation Line and Wires
Repair Irrigation Line and Wires
Phase 1 - Retention Basin
LOT#11-635
Excavate Retention Basins
5
05-May-14
09-May-14
LOT#11-665
Initial Gravel Base
3
12-May-14
14-May-14
LOT#11-675
Install Percolation System
10
15-May-14
29-May-14
Excavate Retention Basins
Initial Gravel Base
Install Percolation System
Tessmann Planetarium Upgrade and Restroom Addition
Site Preparation
TP-SP-135
Establish SWPPP / Track-out Pads
1
09-May-14
09-May-14
Establish SWPPP / Track-out Pads
TP-SP-205
Survey / Stake for Grading
1
09-May-14
09-May-14
Survey / Stake for Grading
TP-SP-215
Rough Grade Site
4
12-May-14
15-May-14
Rough Grade Site
Fragnet #09 - Unforeseen Transite Pipe
FR09-125
RFI #32 Written / Response
2
18-Apr-14 A
28-Apr-14
FR09-155
Notification to AQMD for Abatement
10
23-Apr-14 A
06-May-14
FR09-145
LVI to Remove Asbestos Pipe
2
07-May-14
08-May-14
Demo / Remove (E) Tree
1
02-May-14
02-May-14
TP-UTIL-115
Excavate, Pipe, Inspect and Backfill Storm Drain Lines
5
25-Apr-14 A
01-May-14
TP-UTIL-125
Excavate, Pipe, Inspect and Backfill Sewer Lines
3
05-May-14
07-May-14
TP-UTIL-135
Excavate, Pipe, Inspect and Backfill Domestic Water Lines4
16-May-14
21-May-14
RFI #32 Written / Response
Notification to AQMD for Abatement
LVI to Remove Asbestos Pipe
Fragnet #11 - Tree Removal for Sewer Line
FR11-125
Demo / Remove (E) Tree
Site Utilities
Remaining Level of Effort
Milestone
Excavate, Pipe, Inspect and Backfill Storm Drain Lines
Excavate, Pipe, Inspect and Backfill Sewer Lines
Excavate, Pipe, Inspect and Backfill Domestic Water Lines
McCarthy Building Companies, Inc.
Page: 3 of 3
Actual Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
RSCCD - Santa Ana College Tessmann Upgrade, Parking Lot #11 and Temporary Village Reflection
Three Week Look-Ahead
Data Date: 28-Apr-14