2014 OCA Booklet.xlsx

ODOT District One
Construction Year 2014-2016 Projects
Summary
2014
2015
2016
Number
Cost
of
Projects
Number
of
Projects
Cost
Number
of
Projects
Cost
Resurfacing
Bridge
Culverts
Slide Repair
Road Reconstruction
Minor Roadway
Rehab/Miscellaneous
Maintenance
LPA
10
3
1
1
1
$17,053,741
$11,632,926
$236,914
$370,300
$60,883,257
8
3
5
1
0
$16,101,751
$1,610,470
$1,154,818
$512,996
$0
6
5
3
3
0
$9,407,693
$6,749,510
$1,938,913
$1,870,100
$0
3
$1,500,029
1
$895,965
4
$8,577,432
4
13
$3,317,104
$17,052,533
4
16
$2,422,200
$14,971,486
3
10
$2,129,200
$9,484,373
Totals
36
$112,046,804
38
$37,669,686
34
$40,157,221
Type
1
ODOT District One
Construction Year 2014-2016 Projects
Resurfacing Projects
PID
Project Name
Description
2014
Lane Miles Sale date
Construction Year 2014
76823
HAN-330/568-0.00/0.15
75523
HAN/WYA-15-21.52/0.00
82033
WYA-53-11.63/12.95
87208
On SR 330 from SR 15 to the NCL of Vanlue; and SR 568
from Main Street in Findlay to the ECL of Findlay.
On SR 15 from SR 37 to the US 23 interchange in Wyandot
county.
Cost
$17,053,741
6.08 Mi.
Sold
$603,841
40.56 Mi.
Sold
$2,803,470
On SR 53 from the WCL of Upper Sandusky to Marseilles
Ave. and from Wyandot St. to the NCL of Upper Sandusky.
6.16 Mi.
02/06/14
$595,165
DEF/PUT-15/63421.65/0.27/8.33
On SR 15 from the bridge at SLM 21.65 to Shubert Rd; and
SR 634 from SR 189 to SR 613, excluding the overlap
segment with SR 114.
27.38 Mi.
03/13/14
$1,899,079
87195
HAR-68-0.00
On SR 68 from the Logan county line to the SCL of Kenton.
17.72 Mi.
03/13/14
$1,764,172
87205
91943
PUT-115-0.00
HAR-31-0.00
18.72 Mi.
20.90 Mi.
03/13/14
06/05/14
$1,500,621
$1,458,698
80492
ALL-65/81-13.75/19.08
21.80 Mi.
06/26/14
$1,771,164
87200
PAU-127/111-9.67/11.15
21.72 Mi.
07/10/14
$2,043,413
75520
2015
HAN-68/15-12.73/17.38
On SR 115 from the Allen county line to US 244 in Kalida.
On SR 31 from the Union county line to SR 292.
On SR 65 from the SCL to the NCL of Cairo; and SR 81
from just east of the IR 75 interchange to the Hardin county
line.
On US 127 from the SCL of Paulding to the Defiance county
line; and SR 111 from SR 500 to US 127.
On US 68/15 from just south of Lima Ave. to SR 37.
77146
WYA-23/30-10.17/912
Resurface on US 23 from the Conrail R.R. overpass to 0.22
miles south of CR 47; and US 30 from 1.41 miles west of TR
49 to the US 23 interchange. Concrete overlay of deck and
approach slabs and patch and seal all concrete surfaces on
US 23 over CR 182, US 23 over CR 330, and US 23 over
the Little Tymochtee Creek. Patch and seal deck, approach
slabs, and all concrete surfaces on US 23 over the
Sandusky River.
80501
DEF-2/49-2.34/4.01
On SR 2 from the western junction with SR 49 to the ECL of
Hicksville; and SR 49 from SR 2 to the Williams county line.
23.98 Mi.
09/04/14
Construction Year 2015
$2,614,118
$16,101,751
33.16 Mi.
10/30/2014
$5,076,740
20.7 Mi.
10/16/2014
$1,475,237
Resurfacing Projects, cont'd
2
PID
88842
93683
93688
87138
88840
91942
Project Name
Description
Lane Miles Sale date
On SR 12 from the ECL of Arcadia to the Seneca county
HAN-12/18/613line; SR 18 from SR 613 to Fremont St. in Fostoria and from
22.28/6.82/8.12/5.39
Vine St. in Fostoria to the Senica county line; and SR 613
from the ECL of McComb to IR 75.
On US 224 from Main St. in Findlay to the end of the five
HAN-224-13.77
lane section at SLM 17.40.
On SR 49 from the SCL to the NCL of Payne; and SR 613
PAU-49/613-5.78/0.00/6.08
from the Indiana state line to SR 49 in Payne and from SR
500 to US 127.
PUT-114-3.06
On SR 114 from SR 694 to the NCL of Kalida.
On SR 65 from N. Union St. to Elizabeth St.; SR 81 from
Charles St. to N. Elizabeth St. and from N. Union St. to
ALL-65/81/117/309Jackson St.; SR 117 from Seriff Rd. to Shawnee Rd. ,the RJ
7.17/15.81/16.85/12.73/13.86/18
Coleman RR overpass to Elm St. and SR 309 to just east of
.75/10.98
Greely Chapel Rd.; SR 309 from Cole St. to SR 81 (North
St.).
On SR 65 from the NCL of Columbus Grove to the SCL of
PUT-65-1.45/9.58
Ottawa and from the NCL of Ottawa tohe SCL of Leipsic.
28.86 Mi.
10/2/2014
$2,135,586
14.34 Mi.
1/29/2015
$1,424,268
23.56 Mi.
4/9/2015
$1,879,366
9.02 Mi.
12/11/2014
$684,794
12.70 Mi.
7/2015
$1,013,031
24.14 Mi.
7/1/2015
$2,412,729
Construction Year 2016
2016
85090
HAR-67/309-17.55/16.93
87201
PAU-114/637-16.74/1.69
93690
WYA-53/587-15.33/0.00
93698
HAN-224/12/3712.76/13.42/0.67
87210
VAN/PUT-66/697-0.47/0.00
87136
HAN-12-17.51
On SR 67 from the ECL of Kenton to the Wyandot county
line; and SR 309 from CR 171 to the Marion county line.
On SR 114 from the WCL of Grover Hill to the Putnam
county line; and SR 637 from the SCL to the NCL of Grover
Hill.
On SR 53 from the NCL of Upper Sandusky to the Seneca
county line; and SR 587 from SR 53 to the Seneca county
line.
On US 224 from Trenton Ave. to Center St.; SR 12 from
Main Cross St. to Center St.; and SR 37 from Main Cross St.
to Lincoln St.
On SR 66 from Fifth St. in the City of Delphos to US 224;
and SR 697 from the WCL of Delphos to SR 66.
On SR 12 from the ECL of Findlay to the ECL of Arcadia.
Totals
Cost
$9,407,693
32.40 Mi.
10/2015
$3,465,385
16.72 Mi.
10/2015
$1,382,729
19.10 Mi.
10/2015
$1,685,987
6.72 Mi.
1/2016
$773,610
15.18 Mi.
7/2016
$1,211,653
10.40 Mi.
7/2016
Number of
Projects
24
$888,329
Cost
$42,563,185
3
ODOT District One
Construction Year 2014-2016 Projects
Bridge Projects
PID
Project Name
Description
Deck Area Sale date
Cost
Construction Year 2014 Total $11,632,926
2014
84557
HAN-224-11.81
87235
DEF-18-26.02
87853
D01-BM-FY14
2015
84565
VAN-697-1.78
84580
HAR-67-3.29
87854
D01-BM-FY15
2016
84584
PAU-49-7.22
84582
WYA-53-21.85/24.16
83672
WYA-23/15-22.80/2.64
93714
WYA-103/293-5.10/4.76
94347
D01-BM-FY16
Replace US 224 bridge over IR 75. Reconstruct
interchange ramps. Replace approach pavement on US
224 from CR 300 to Broad Ave. (0.36 Miles).
Replace stone arch structure under SR 18 in the City of
Defiance over Preston Run
Miscellaneous bridge maintenacne activities at various
locations throughout District One.
11,980 SF
Sold
$10,648,577
484 SF
Sold
$711,072
N/A
Sold
$273,277
Construction Year 2015 Total
Replace SR 697 bridge over the Little Auglaize River.
2,605 SF
2/26/2015
Replace deck edges and overlay deck on SR 67 bridge over
4,532 SF
3/5/2015
the Scioto River
Miscellaneous bridge maintenacne activities at various
N/A
3/19/2015
locations throughout District One.
Construction Year 2016 Total
Replace SR 49 bridge over Wildcat Creek.
2411 SF
10/2015
Replace bridges on SR 53 over Tymochtee Creek (SLM
10,269 SF
10/2015
21.85) and Thorn Run (SLM 24.16).
Remove two sets of structures over abandoned railroads
24,412 SF
1/2016
and rehab an existing culvert.
Deck overlay on SR 103 bridge over US 23; and SR 293
15,231 SF
1/2016
bridge over Potato Run.
Miscellaneous bridge maintenacne activities at various
N/A
1/2016
locations throughout District One.
Number of
Projects
Totals
11
$1,610,470
$710,496
$399,974
$500,000
$6,749,510
$655,339
$2,318,191
$2,905,000
$370,980
$500,000
Cost
$19,992,906
4
ODOT District One
Construction Year 2014-2016 Projects
Culvert Projects
PID
2014
88854
2015
95479
95481
95495
97366
96801
2016
92936
96193
96196
Project Name
Description
Sale date
Construction Year 2014 Total
Replace culvert under SR 199, approximately 0.7 miles south of SR 103.
Sold
Construction Year 2015 Total
Replace culvert under SR 81, approximately 0.1 miles east of CR 159.
HAR-81-15.13
5/7/2015
Replace culvert under US 224 approximately 0.6 miles east of SR 634.
PUT-224-6.51
5/21/2015
Replace culvert under SR 67 approximately 0.3 miles south of TR 103.
WYA-67-7.76
4/23/2015
Replace culvert under SR 31 just north of TR 190
HAR-31-6.30
7/2015
Replace culvert under SR 37 approximately 0.1 miles south of CR 96.
WYA-37-8.97
7/2015
Construction Year 2016 Total
Replace eleven culverts at various locations on SR 309 and one culvert on
ALL/HAR-235/309-Culverts
10/2015
SR 235.
Replace culvert under SR 114 just west of TR 11.
PAU-114-1.00
1/2016
Replace culvert under SR 637 approximately 0.3 miles south of CR 146.
PAU-637-10.76
1/2016
Number of Projects
Totals
9
WYA-199-13.39
Cost
$236,914
$236,914
$1,154,818
$151,004
$154,022
$361,356
$297,897
$190,539
$1,938,913
$1,548,195
$185,580
$205,138
Cost
$3,330,645
5
ODOT District One
Construction Year 2014-2016 Projects
Slide Repair Projects
PID
Project Name
2014
92445
HAN-15-17.80
2015
92451
VAN-224-11.64
2016
92450
PAU-637-8.63
96143
DEF-24-1.71
96145
WYA-23-9.30
Description
Sale date
Cost
Construction Year 2014 Total $370,300
Repair, regrade and re-vegetate the existing slope and the graded shoulder.
Add pipe underdrain, widen the paved shoulder to face of guardrail and add
9/18/2014
$370,300
curb for the entire length of the guardrail. Add catch basins along the curb as
necessary with outlets at the bottom on the slope.
Construction Year 2015 Total $512,996
Repair, regrade and re-vegetate the existing slope and the graded shoulder.
Add pipe underdrain, widen the paved shoulder to face of guardrail and add
5/2015
$512,996
curb for the entire length of the guardrail. Add catch basins along the curb as
necessary with outlets at the bottom on the slope.
Construction Year 2016 Total $1,870,100
Excavate foreslope and reconstruct with a geotechnically reinforced slope.
4/2016
$527,400
Re-establish vegetation. Reconstruct outside edge of pavement.
Excavate foreslope and reconstruct with a geotechnically reinforced slope.
10/2015
$500,000
Re-establish vegetation.
Excavated and reconstructed with slope drains in the embankment. The
slopes should be flattened to 2.5:1 if possible and revegetated with deep
10/2015
$842,700
rooting plantings.
Number of
Cost
Projects
Totals
5
$2,753,396
6
ODOT District One
Construction Year 2014-2016 Projects
Road Reconstruction
PID
Project Name
Description
89029
Lane Miles
Sale date
Construction Year 2014
2014
ALL-75-0.21
Reconstruct IR 75 from the Auglaize county line to
MM 5.53
21.28 Mi.
Totals
Sold
Number of
Projects
1
Cost
$60,883,257
$60,883,257
Cost
$60,883,257
7
ODOT District One
Construction Year 2014-2016 Projects
Minor Roadway Rehabilitation/Miscellaneous
PID
2014
90775
93700
96181
2015
86634
2016
Project Name
D01-Signal-FY14
HAN-75-3.22
D01-CPR-FY14
Upgrade or reconstruct signals at 3 locations throughout District One.
Minor rehab to repair bad sections and joints.
Repair concrete pavement at various locations throughout District One.
ALL-81-18.10
Install curb and gutters and resurfacing of the roadway.
95274
ALL-309-10.22
90849
ALL-309-0.00
96650
D01-CPR-FY16
ALL-117/50110.76/4.34
84063
Description
On SR309 from Robb Ave. to Cole St., resurface the roadway with asphalt
concrete, replace guard rail, curb, gutter and inlets. Reconstruct signals at
Rosedale Ave. and Cole St.. Remove Grand Ave. extention from Rosedale Ave.
to Kenilworth Ave.
Resurface the roadway with asphalt concrete. Replace the existing curb and
gutter in the Village of Elida. Widen the roadway to meet design standards (5 12' lanes), install new curb and gutter and improve drainage if required from
Pioneer Rd. to just west of Eastown Rd. Replace a 60" culvert near SLM 0.60 on
SR 309.
Repair concrete pavement at various locations throughout District One.
Reconstruction of the SR 117 and SR 501/Wapak Rd intersection.
Length Sale date
Cost
Construction Year 2014 $1,500,029
N/A
Sold
$243,900
11.17 Mi. 1/23/2014
$792,288
NA
3/13/2014
$463,841
Construction Year 2015 $895,965
0.32 Mi.
3/5/2015
$895,965
Construction Year 2016 $8,577,432
0.76 Mi.
10/2015
$1,244,028
8.48 Mi.
1/2016
$5,437,439
NA
1/2016
$1,000,000
NA
1/2016
$895,965
Number of
Cost
Projects
Totals
8
$10,973,426
8
ODOT District One
Construction Year 2014-2016 Projects
Maintenance Projects
PID
Project Name
2014
90644
D01-HS-FY14
84685
D01-PM-FY14
96628
D01-Mowing-FY2014/2015
92422
D01-RPM-FY15
2015
92424
D01-GR-FY15
90647
D01-HS-FY15
92420
D01-PM-FY15
92423
D01-RPM-FY16
2016
92421
D01-PM-FY16
92425
D01-HS-FY16
94378
D01-RPM-FY17
Description
Sale date
Construction Year 2014
Offroad and R/W fence herbicidal spraying on various routes throughout
Sold
District One.
Upgrade existing painted pavement markings on various routes throughout
Sold
District One.
Mowing on 4-lanes routes throughout District One in years 2014 and 2015.
Sold
Replace raised pavement marker castings and or lenses as needed on
7/10/2014
various routes throughout District One.
Construction Year 2015
Repair or replace guardrail sections and or post as needed on various
1/15/2015
routes throughout District One.
Offroad and R/W fence herbicidal spraying on various routes throughout
1/29/2015
District One.
Upgrade existing painted pavement markings on various routes throughout
1/29/2015
District One.
Replace raised pavement marker castings and or lenses as needed on
7/2015
various routes throughout District One.
Construction Year 2016
Upgrade existing painted pavement markings on various routes throughout
1/2016
District One.
Offroad and R/W fence herbicidal spraying on various routes throughout
1/2016
District One.
Replace raised pavement marker castings and or lenses as needed on
7/2016
various routes throughout District One.
Number of
Projects
Totals
11
Cost
$3,317,104
$277,739
$1,527,989
$1,295,376
$216,000
$2,422,200
$400,000
$224,200
$1,569,400
$228,600
$2,129,200
$1,653,400
$236,200
$239,600
Cost
$7,868,504
9
ODOT District One
Construction Year 2014-2016 Projects
LPA Projects
PID
2014
92339
90948
90953
92452
91899
92337
85500
93787
77305
95298
92471
83342
97122
2015
84904
93783
96711
Project Name
Description
Sale date
Construction Year 2014
WYA-CR47 Indian Mill Bridge
Restore the historic Indian Mill Bridge over the Sandusky River.
Sold
Modify Elizabeth St. and West St. to one-way, one lane operations
ALL-Lima Elizabeth/West St
Sold
between Elm St. and North St. Convert Elizabeth St. and West St. to
two-way operations south of Elm St. and north of North St.
Construct sidewalk/trail along Lima Ave. from Logan Ave. to Lake
HAN-SRTS-Donnell Middle
Cascades Parkway. Extend sidewalk along Lake Cascades Parkway
Sold
School
to W. McPherson Ave. and stop at W. West St.
HAN-224-15.67
Upgrade or reconstruct signals on Tiffin Ave.
Sold
HAR-Ada-Lima Ave. Phase III
Reconstruction and widening from the ECL of Ada to Main St.
Sold
Construct a bike path from Central Point Buttonbush Wetland Preserve
1/29/2014
ALL-Lima Bikepath Phase V
to existing Ottawa River bikeway.
Rehabilitate bridge piers, guardrail, and wearing surface over the
ALL-WWTP
2/28/2014
Ottawa River.
Full depth pavement repair, milling and resurfacing of approximately
WYA-Marseilles Ave./Eight St. 1.0 mile of Eight St. (SR 81) from Wyandot Ave. to High St. Replace
3/13/2014
10 inch water line the entire length of project.
Replace the Shawnee Rd. bridge over the Ottawa River and install a
ALL-Shawnee Rd.
multi-lane roundabout at the intersection of Ft. Amanda and Shawnee
3/13/2014
Rd.
Resurface sections of Main St., Sandusky St. and Sixth St. in the City
HAN-Findlay FY14 Resurfacing
3/14/2014
of Findlay.
ALL-TR87-0.50 (Hook-Waltz
Replace TR 87 bridge over Sugar Creek.
3/15/2014
Rd.)
HAN-CR501M-0.00
Replace CR 501M bridge over Lye Creek in the City of Findlay.
5/16/2014
Design Build. As part of the Ohio Bridge Partnership Program, replace
ALL-County Bridge 3
bridges on CR 88 over Pike Run at log points 2.62 and 4.17 and on CR 6/5/2014
166 over Wrestle Creek.
Construction Year 2015
VAN-TR41-02
Replace TR 41 bridge over the St. Marys River.
12/15/2014
HAR-Ada-Klingler Rd.
Reconstruction and widening from Lima Ave. to Lincoln St.
1/9/2015
DEF-Bike/Ped Trail-Phase 1
Construct a bike path at the site of the City's reservoir.
1/30/2015
Cost
$17,052,533
$1,695,422
$1,358,397
$182,714
$394,283
$2,146,101
$566,744
$295,224
$1,148,812
$5,482,379
$748,264
$610,751
$723,442
$1,700,000
$14,971,486
$929,498
$1,630,588
$476,700
10
LPA Projects, cont'd
PID
Project Name
Description
96867
87353
Add new sidewalks along Water St. from Jackson St. to Baldwin St.,
along Emerald Rd. from Johnson Rd. to the school and along N. Main
St. from Baldwin St. to Miles St. Add new sidewalk at missing sections
PAU-SRTS-Paulding Sidewalks
on Caroline St. between Grant St. and Emerald Rd. and on George St.
between Walnut and Cherry St. Construct a raised concrete median in
the main school drive.
Add school zone flashing signage, pavement markings, crosswalks
HAN-SRTS-Van Buren
and signage, and sidewalks at the town square.
VAN-Van Wert W. Main St.Reconstruction and widening from Fisher St. to John Brown Rd.
Phase II
HAN-CR12/180/698Resurface with asphalt concrete on CR 12 from SR 103 to CR 37; CR
5.02/0.23/0.00
180 from SR 15 to SR 37; and CR 698 from CR 304 to SR 103.
DEF-CR188-3.90
Widen pavement and improve drainage from SR 18 to Bowman Rd.
PUT-OLD SR12-16.40
Replace Old SR 12 bridge over the Ottawa River.
90217
ALL-Kibby St.
97384
HAN-Findlay FY15 Resurfacing
92830
DEF-SR 111 South Clinton St
90952
88351
93782
94934
TBD
ALL-TR87/TR108/Collett St.
Combination of street rehab and replacement. Profile to be adjusted in
some areas. Includes curb and gutters, sidewalk and drainage work.
Resurface sections of Bright Rd., Lima Ave., Blanchard St., Western
Ave. and Broad Ave. in the City of Findlay.
Widen to provide a center two-way left turn lane. Include curb, gutter
and storm sewer improvements. Signals and signing will also be
upgraded.
Design Build. As part of the Ohio Bridge Partnership Program, replace
the Hook-Waltz Rd. bridge over Little Cranberry Creek and the Neely
Rd. bridge over Dug Run. Replace superstructure on the Collett St.
bridge over the Ottawa River.
90954
ALL-SRTS-Elida Sidewalks
Construct sidewalks along Sunnydale St. and Pioneer Rd. Add school
zone pavement markings on Pioneer Rd. and Sunnydale St. Add
crosswalk pavement markings on Pioneer Rd and Elida Rd. Upgrade
the pedestian signal at the Elida Rd. and Pioneer Rd. intersection.
96263
HAR-SRTS-Ada
Construct sidewalks and curb ramps on Grand Ave. from the school to
Buckeye Ave. and on Highland Ave. from Grand Ave. to Johnson St.
Sale date
Cost
2/10/2015
$824,939
2/10/2015
$81,062
2/10/2015
$2,071,273
2/28/2015
$1,050,000
3/2/2015
3/16/2015
$1,235,900
$1,370,000
4/17/2015
$2,167,308
5/8/2015
$800,000
5/19/2015
$2,013,000
5/21/2015
TBD
6/4/2015
$96,218
6/30/2015
$225,000
11
LPA Projects, cont'd
Description
PID
Project Name
2016
Construction Year 2016
ALL-Cairo Main St.
Reconstruction of Main St.(Lincoln Highway) from the WCL to the ECL
10/2015
Improvements
of Cairo.
ALL-Lima Bike Lanes
Construct bike lanes on Main St. in the City of Lima.
1/20/2016
Construct sidewalks and intersection improvements near West
ALL-SRTS-Lima
Elementary, Unity Elementary, Heritage Elementary and North Middle
1/20/2016
School.
Construct sidewalks and rectangular rapid flash beacons on Second
ALL-SRTS-Spencerville
1/2016
St. from SR 66 to the school.
VAN-Washington St. Phase III
Reconstruction and widening from Fox Rd. to Ervin Rd.
2/11/16
Construct sidewalk along the west side of Harrmann Rd. from the
PAU-SRTS-Antwerp Phase II
school to Canal Rd. and along the north side of Canal Rd. from
4/2016
Harrmann Rd. to Koos Dr.
5/2016
HAN-Findlay FY16 Resurfacing Resurfacing and curb repair in the City of Findlay.
Design Build. As part of the Ohio Bridge Partnership Program, replace
HAR-TR155-7.50
5/19/2016
TR 155 bridge over Taylor Creek.
Design Build. As part of the Ohio Bridge Partnership Program, replace
ALL-CR22-2.56
6/02/2016
Napolean Rd. bridge over Little Hog Creek.
Modify High St. between Metcalf St. and Central Ave. Convert Wayne
ALL-Lima Wayne/High St
St. to a two-way operation between Jameson Ave. and Central Ave.
6/15/2016
95238
96710
96262
96264
96261
93589
97385
TBD
TBD
90949
Sale date
Number of
Projects
Totals
38
Cost
$9,484,373
$2,112,167
$200,615
$460,000
$75,591
$3,441,000
$170,000
$825,000
TBD
TBD
$2,200,000
Cost
$41,508,392
12