ODOT District One Construction Year 2014-2016 Projects Summary 2014 2015 2016 Number Cost of Projects Number of Projects Cost Number of Projects Cost Resurfacing Bridge Culverts Slide Repair Road Reconstruction Minor Roadway Rehab/Miscellaneous Maintenance LPA 10 3 1 1 1 $17,053,741 $11,632,926 $236,914 $370,300 $60,883,257 8 3 5 1 0 $16,101,751 $1,610,470 $1,154,818 $512,996 $0 6 5 3 3 0 $9,407,693 $6,749,510 $1,938,913 $1,870,100 $0 3 $1,500,029 1 $895,965 4 $8,577,432 4 13 $3,317,104 $17,052,533 4 16 $2,422,200 $14,971,486 3 10 $2,129,200 $9,484,373 Totals 36 $112,046,804 38 $37,669,686 34 $40,157,221 Type 1 ODOT District One Construction Year 2014-2016 Projects Resurfacing Projects PID Project Name Description 2014 Lane Miles Sale date Construction Year 2014 76823 HAN-330/568-0.00/0.15 75523 HAN/WYA-15-21.52/0.00 82033 WYA-53-11.63/12.95 87208 On SR 330 from SR 15 to the NCL of Vanlue; and SR 568 from Main Street in Findlay to the ECL of Findlay. On SR 15 from SR 37 to the US 23 interchange in Wyandot county. Cost $17,053,741 6.08 Mi. Sold $603,841 40.56 Mi. Sold $2,803,470 On SR 53 from the WCL of Upper Sandusky to Marseilles Ave. and from Wyandot St. to the NCL of Upper Sandusky. 6.16 Mi. 02/06/14 $595,165 DEF/PUT-15/63421.65/0.27/8.33 On SR 15 from the bridge at SLM 21.65 to Shubert Rd; and SR 634 from SR 189 to SR 613, excluding the overlap segment with SR 114. 27.38 Mi. 03/13/14 $1,899,079 87195 HAR-68-0.00 On SR 68 from the Logan county line to the SCL of Kenton. 17.72 Mi. 03/13/14 $1,764,172 87205 91943 PUT-115-0.00 HAR-31-0.00 18.72 Mi. 20.90 Mi. 03/13/14 06/05/14 $1,500,621 $1,458,698 80492 ALL-65/81-13.75/19.08 21.80 Mi. 06/26/14 $1,771,164 87200 PAU-127/111-9.67/11.15 21.72 Mi. 07/10/14 $2,043,413 75520 2015 HAN-68/15-12.73/17.38 On SR 115 from the Allen county line to US 244 in Kalida. On SR 31 from the Union county line to SR 292. On SR 65 from the SCL to the NCL of Cairo; and SR 81 from just east of the IR 75 interchange to the Hardin county line. On US 127 from the SCL of Paulding to the Defiance county line; and SR 111 from SR 500 to US 127. On US 68/15 from just south of Lima Ave. to SR 37. 77146 WYA-23/30-10.17/912 Resurface on US 23 from the Conrail R.R. overpass to 0.22 miles south of CR 47; and US 30 from 1.41 miles west of TR 49 to the US 23 interchange. Concrete overlay of deck and approach slabs and patch and seal all concrete surfaces on US 23 over CR 182, US 23 over CR 330, and US 23 over the Little Tymochtee Creek. Patch and seal deck, approach slabs, and all concrete surfaces on US 23 over the Sandusky River. 80501 DEF-2/49-2.34/4.01 On SR 2 from the western junction with SR 49 to the ECL of Hicksville; and SR 49 from SR 2 to the Williams county line. 23.98 Mi. 09/04/14 Construction Year 2015 $2,614,118 $16,101,751 33.16 Mi. 10/30/2014 $5,076,740 20.7 Mi. 10/16/2014 $1,475,237 Resurfacing Projects, cont'd 2 PID 88842 93683 93688 87138 88840 91942 Project Name Description Lane Miles Sale date On SR 12 from the ECL of Arcadia to the Seneca county HAN-12/18/613line; SR 18 from SR 613 to Fremont St. in Fostoria and from 22.28/6.82/8.12/5.39 Vine St. in Fostoria to the Senica county line; and SR 613 from the ECL of McComb to IR 75. On US 224 from Main St. in Findlay to the end of the five HAN-224-13.77 lane section at SLM 17.40. On SR 49 from the SCL to the NCL of Payne; and SR 613 PAU-49/613-5.78/0.00/6.08 from the Indiana state line to SR 49 in Payne and from SR 500 to US 127. PUT-114-3.06 On SR 114 from SR 694 to the NCL of Kalida. On SR 65 from N. Union St. to Elizabeth St.; SR 81 from Charles St. to N. Elizabeth St. and from N. Union St. to ALL-65/81/117/309Jackson St.; SR 117 from Seriff Rd. to Shawnee Rd. ,the RJ 7.17/15.81/16.85/12.73/13.86/18 Coleman RR overpass to Elm St. and SR 309 to just east of .75/10.98 Greely Chapel Rd.; SR 309 from Cole St. to SR 81 (North St.). On SR 65 from the NCL of Columbus Grove to the SCL of PUT-65-1.45/9.58 Ottawa and from the NCL of Ottawa tohe SCL of Leipsic. 28.86 Mi. 10/2/2014 $2,135,586 14.34 Mi. 1/29/2015 $1,424,268 23.56 Mi. 4/9/2015 $1,879,366 9.02 Mi. 12/11/2014 $684,794 12.70 Mi. 7/2015 $1,013,031 24.14 Mi. 7/1/2015 $2,412,729 Construction Year 2016 2016 85090 HAR-67/309-17.55/16.93 87201 PAU-114/637-16.74/1.69 93690 WYA-53/587-15.33/0.00 93698 HAN-224/12/3712.76/13.42/0.67 87210 VAN/PUT-66/697-0.47/0.00 87136 HAN-12-17.51 On SR 67 from the ECL of Kenton to the Wyandot county line; and SR 309 from CR 171 to the Marion county line. On SR 114 from the WCL of Grover Hill to the Putnam county line; and SR 637 from the SCL to the NCL of Grover Hill. On SR 53 from the NCL of Upper Sandusky to the Seneca county line; and SR 587 from SR 53 to the Seneca county line. On US 224 from Trenton Ave. to Center St.; SR 12 from Main Cross St. to Center St.; and SR 37 from Main Cross St. to Lincoln St. On SR 66 from Fifth St. in the City of Delphos to US 224; and SR 697 from the WCL of Delphos to SR 66. On SR 12 from the ECL of Findlay to the ECL of Arcadia. Totals Cost $9,407,693 32.40 Mi. 10/2015 $3,465,385 16.72 Mi. 10/2015 $1,382,729 19.10 Mi. 10/2015 $1,685,987 6.72 Mi. 1/2016 $773,610 15.18 Mi. 7/2016 $1,211,653 10.40 Mi. 7/2016 Number of Projects 24 $888,329 Cost $42,563,185 3 ODOT District One Construction Year 2014-2016 Projects Bridge Projects PID Project Name Description Deck Area Sale date Cost Construction Year 2014 Total $11,632,926 2014 84557 HAN-224-11.81 87235 DEF-18-26.02 87853 D01-BM-FY14 2015 84565 VAN-697-1.78 84580 HAR-67-3.29 87854 D01-BM-FY15 2016 84584 PAU-49-7.22 84582 WYA-53-21.85/24.16 83672 WYA-23/15-22.80/2.64 93714 WYA-103/293-5.10/4.76 94347 D01-BM-FY16 Replace US 224 bridge over IR 75. Reconstruct interchange ramps. Replace approach pavement on US 224 from CR 300 to Broad Ave. (0.36 Miles). Replace stone arch structure under SR 18 in the City of Defiance over Preston Run Miscellaneous bridge maintenacne activities at various locations throughout District One. 11,980 SF Sold $10,648,577 484 SF Sold $711,072 N/A Sold $273,277 Construction Year 2015 Total Replace SR 697 bridge over the Little Auglaize River. 2,605 SF 2/26/2015 Replace deck edges and overlay deck on SR 67 bridge over 4,532 SF 3/5/2015 the Scioto River Miscellaneous bridge maintenacne activities at various N/A 3/19/2015 locations throughout District One. Construction Year 2016 Total Replace SR 49 bridge over Wildcat Creek. 2411 SF 10/2015 Replace bridges on SR 53 over Tymochtee Creek (SLM 10,269 SF 10/2015 21.85) and Thorn Run (SLM 24.16). Remove two sets of structures over abandoned railroads 24,412 SF 1/2016 and rehab an existing culvert. Deck overlay on SR 103 bridge over US 23; and SR 293 15,231 SF 1/2016 bridge over Potato Run. Miscellaneous bridge maintenacne activities at various N/A 1/2016 locations throughout District One. Number of Projects Totals 11 $1,610,470 $710,496 $399,974 $500,000 $6,749,510 $655,339 $2,318,191 $2,905,000 $370,980 $500,000 Cost $19,992,906 4 ODOT District One Construction Year 2014-2016 Projects Culvert Projects PID 2014 88854 2015 95479 95481 95495 97366 96801 2016 92936 96193 96196 Project Name Description Sale date Construction Year 2014 Total Replace culvert under SR 199, approximately 0.7 miles south of SR 103. Sold Construction Year 2015 Total Replace culvert under SR 81, approximately 0.1 miles east of CR 159. HAR-81-15.13 5/7/2015 Replace culvert under US 224 approximately 0.6 miles east of SR 634. PUT-224-6.51 5/21/2015 Replace culvert under SR 67 approximately 0.3 miles south of TR 103. WYA-67-7.76 4/23/2015 Replace culvert under SR 31 just north of TR 190 HAR-31-6.30 7/2015 Replace culvert under SR 37 approximately 0.1 miles south of CR 96. WYA-37-8.97 7/2015 Construction Year 2016 Total Replace eleven culverts at various locations on SR 309 and one culvert on ALL/HAR-235/309-Culverts 10/2015 SR 235. Replace culvert under SR 114 just west of TR 11. PAU-114-1.00 1/2016 Replace culvert under SR 637 approximately 0.3 miles south of CR 146. PAU-637-10.76 1/2016 Number of Projects Totals 9 WYA-199-13.39 Cost $236,914 $236,914 $1,154,818 $151,004 $154,022 $361,356 $297,897 $190,539 $1,938,913 $1,548,195 $185,580 $205,138 Cost $3,330,645 5 ODOT District One Construction Year 2014-2016 Projects Slide Repair Projects PID Project Name 2014 92445 HAN-15-17.80 2015 92451 VAN-224-11.64 2016 92450 PAU-637-8.63 96143 DEF-24-1.71 96145 WYA-23-9.30 Description Sale date Cost Construction Year 2014 Total $370,300 Repair, regrade and re-vegetate the existing slope and the graded shoulder. Add pipe underdrain, widen the paved shoulder to face of guardrail and add 9/18/2014 $370,300 curb for the entire length of the guardrail. Add catch basins along the curb as necessary with outlets at the bottom on the slope. Construction Year 2015 Total $512,996 Repair, regrade and re-vegetate the existing slope and the graded shoulder. Add pipe underdrain, widen the paved shoulder to face of guardrail and add 5/2015 $512,996 curb for the entire length of the guardrail. Add catch basins along the curb as necessary with outlets at the bottom on the slope. Construction Year 2016 Total $1,870,100 Excavate foreslope and reconstruct with a geotechnically reinforced slope. 4/2016 $527,400 Re-establish vegetation. Reconstruct outside edge of pavement. Excavate foreslope and reconstruct with a geotechnically reinforced slope. 10/2015 $500,000 Re-establish vegetation. Excavated and reconstructed with slope drains in the embankment. The slopes should be flattened to 2.5:1 if possible and revegetated with deep 10/2015 $842,700 rooting plantings. Number of Cost Projects Totals 5 $2,753,396 6 ODOT District One Construction Year 2014-2016 Projects Road Reconstruction PID Project Name Description 89029 Lane Miles Sale date Construction Year 2014 2014 ALL-75-0.21 Reconstruct IR 75 from the Auglaize county line to MM 5.53 21.28 Mi. Totals Sold Number of Projects 1 Cost $60,883,257 $60,883,257 Cost $60,883,257 7 ODOT District One Construction Year 2014-2016 Projects Minor Roadway Rehabilitation/Miscellaneous PID 2014 90775 93700 96181 2015 86634 2016 Project Name D01-Signal-FY14 HAN-75-3.22 D01-CPR-FY14 Upgrade or reconstruct signals at 3 locations throughout District One. Minor rehab to repair bad sections and joints. Repair concrete pavement at various locations throughout District One. ALL-81-18.10 Install curb and gutters and resurfacing of the roadway. 95274 ALL-309-10.22 90849 ALL-309-0.00 96650 D01-CPR-FY16 ALL-117/50110.76/4.34 84063 Description On SR309 from Robb Ave. to Cole St., resurface the roadway with asphalt concrete, replace guard rail, curb, gutter and inlets. Reconstruct signals at Rosedale Ave. and Cole St.. Remove Grand Ave. extention from Rosedale Ave. to Kenilworth Ave. Resurface the roadway with asphalt concrete. Replace the existing curb and gutter in the Village of Elida. Widen the roadway to meet design standards (5 12' lanes), install new curb and gutter and improve drainage if required from Pioneer Rd. to just west of Eastown Rd. Replace a 60" culvert near SLM 0.60 on SR 309. Repair concrete pavement at various locations throughout District One. Reconstruction of the SR 117 and SR 501/Wapak Rd intersection. Length Sale date Cost Construction Year 2014 $1,500,029 N/A Sold $243,900 11.17 Mi. 1/23/2014 $792,288 NA 3/13/2014 $463,841 Construction Year 2015 $895,965 0.32 Mi. 3/5/2015 $895,965 Construction Year 2016 $8,577,432 0.76 Mi. 10/2015 $1,244,028 8.48 Mi. 1/2016 $5,437,439 NA 1/2016 $1,000,000 NA 1/2016 $895,965 Number of Cost Projects Totals 8 $10,973,426 8 ODOT District One Construction Year 2014-2016 Projects Maintenance Projects PID Project Name 2014 90644 D01-HS-FY14 84685 D01-PM-FY14 96628 D01-Mowing-FY2014/2015 92422 D01-RPM-FY15 2015 92424 D01-GR-FY15 90647 D01-HS-FY15 92420 D01-PM-FY15 92423 D01-RPM-FY16 2016 92421 D01-PM-FY16 92425 D01-HS-FY16 94378 D01-RPM-FY17 Description Sale date Construction Year 2014 Offroad and R/W fence herbicidal spraying on various routes throughout Sold District One. Upgrade existing painted pavement markings on various routes throughout Sold District One. Mowing on 4-lanes routes throughout District One in years 2014 and 2015. Sold Replace raised pavement marker castings and or lenses as needed on 7/10/2014 various routes throughout District One. Construction Year 2015 Repair or replace guardrail sections and or post as needed on various 1/15/2015 routes throughout District One. Offroad and R/W fence herbicidal spraying on various routes throughout 1/29/2015 District One. Upgrade existing painted pavement markings on various routes throughout 1/29/2015 District One. Replace raised pavement marker castings and or lenses as needed on 7/2015 various routes throughout District One. Construction Year 2016 Upgrade existing painted pavement markings on various routes throughout 1/2016 District One. Offroad and R/W fence herbicidal spraying on various routes throughout 1/2016 District One. Replace raised pavement marker castings and or lenses as needed on 7/2016 various routes throughout District One. Number of Projects Totals 11 Cost $3,317,104 $277,739 $1,527,989 $1,295,376 $216,000 $2,422,200 $400,000 $224,200 $1,569,400 $228,600 $2,129,200 $1,653,400 $236,200 $239,600 Cost $7,868,504 9 ODOT District One Construction Year 2014-2016 Projects LPA Projects PID 2014 92339 90948 90953 92452 91899 92337 85500 93787 77305 95298 92471 83342 97122 2015 84904 93783 96711 Project Name Description Sale date Construction Year 2014 WYA-CR47 Indian Mill Bridge Restore the historic Indian Mill Bridge over the Sandusky River. Sold Modify Elizabeth St. and West St. to one-way, one lane operations ALL-Lima Elizabeth/West St Sold between Elm St. and North St. Convert Elizabeth St. and West St. to two-way operations south of Elm St. and north of North St. Construct sidewalk/trail along Lima Ave. from Logan Ave. to Lake HAN-SRTS-Donnell Middle Cascades Parkway. Extend sidewalk along Lake Cascades Parkway Sold School to W. McPherson Ave. and stop at W. West St. HAN-224-15.67 Upgrade or reconstruct signals on Tiffin Ave. Sold HAR-Ada-Lima Ave. Phase III Reconstruction and widening from the ECL of Ada to Main St. Sold Construct a bike path from Central Point Buttonbush Wetland Preserve 1/29/2014 ALL-Lima Bikepath Phase V to existing Ottawa River bikeway. Rehabilitate bridge piers, guardrail, and wearing surface over the ALL-WWTP 2/28/2014 Ottawa River. Full depth pavement repair, milling and resurfacing of approximately WYA-Marseilles Ave./Eight St. 1.0 mile of Eight St. (SR 81) from Wyandot Ave. to High St. Replace 3/13/2014 10 inch water line the entire length of project. Replace the Shawnee Rd. bridge over the Ottawa River and install a ALL-Shawnee Rd. multi-lane roundabout at the intersection of Ft. Amanda and Shawnee 3/13/2014 Rd. Resurface sections of Main St., Sandusky St. and Sixth St. in the City HAN-Findlay FY14 Resurfacing 3/14/2014 of Findlay. ALL-TR87-0.50 (Hook-Waltz Replace TR 87 bridge over Sugar Creek. 3/15/2014 Rd.) HAN-CR501M-0.00 Replace CR 501M bridge over Lye Creek in the City of Findlay. 5/16/2014 Design Build. As part of the Ohio Bridge Partnership Program, replace ALL-County Bridge 3 bridges on CR 88 over Pike Run at log points 2.62 and 4.17 and on CR 6/5/2014 166 over Wrestle Creek. Construction Year 2015 VAN-TR41-02 Replace TR 41 bridge over the St. Marys River. 12/15/2014 HAR-Ada-Klingler Rd. Reconstruction and widening from Lima Ave. to Lincoln St. 1/9/2015 DEF-Bike/Ped Trail-Phase 1 Construct a bike path at the site of the City's reservoir. 1/30/2015 Cost $17,052,533 $1,695,422 $1,358,397 $182,714 $394,283 $2,146,101 $566,744 $295,224 $1,148,812 $5,482,379 $748,264 $610,751 $723,442 $1,700,000 $14,971,486 $929,498 $1,630,588 $476,700 10 LPA Projects, cont'd PID Project Name Description 96867 87353 Add new sidewalks along Water St. from Jackson St. to Baldwin St., along Emerald Rd. from Johnson Rd. to the school and along N. Main St. from Baldwin St. to Miles St. Add new sidewalk at missing sections PAU-SRTS-Paulding Sidewalks on Caroline St. between Grant St. and Emerald Rd. and on George St. between Walnut and Cherry St. Construct a raised concrete median in the main school drive. Add school zone flashing signage, pavement markings, crosswalks HAN-SRTS-Van Buren and signage, and sidewalks at the town square. VAN-Van Wert W. Main St.Reconstruction and widening from Fisher St. to John Brown Rd. Phase II HAN-CR12/180/698Resurface with asphalt concrete on CR 12 from SR 103 to CR 37; CR 5.02/0.23/0.00 180 from SR 15 to SR 37; and CR 698 from CR 304 to SR 103. DEF-CR188-3.90 Widen pavement and improve drainage from SR 18 to Bowman Rd. PUT-OLD SR12-16.40 Replace Old SR 12 bridge over the Ottawa River. 90217 ALL-Kibby St. 97384 HAN-Findlay FY15 Resurfacing 92830 DEF-SR 111 South Clinton St 90952 88351 93782 94934 TBD ALL-TR87/TR108/Collett St. Combination of street rehab and replacement. Profile to be adjusted in some areas. Includes curb and gutters, sidewalk and drainage work. Resurface sections of Bright Rd., Lima Ave., Blanchard St., Western Ave. and Broad Ave. in the City of Findlay. Widen to provide a center two-way left turn lane. Include curb, gutter and storm sewer improvements. Signals and signing will also be upgraded. Design Build. As part of the Ohio Bridge Partnership Program, replace the Hook-Waltz Rd. bridge over Little Cranberry Creek and the Neely Rd. bridge over Dug Run. Replace superstructure on the Collett St. bridge over the Ottawa River. 90954 ALL-SRTS-Elida Sidewalks Construct sidewalks along Sunnydale St. and Pioneer Rd. Add school zone pavement markings on Pioneer Rd. and Sunnydale St. Add crosswalk pavement markings on Pioneer Rd and Elida Rd. Upgrade the pedestian signal at the Elida Rd. and Pioneer Rd. intersection. 96263 HAR-SRTS-Ada Construct sidewalks and curb ramps on Grand Ave. from the school to Buckeye Ave. and on Highland Ave. from Grand Ave. to Johnson St. Sale date Cost 2/10/2015 $824,939 2/10/2015 $81,062 2/10/2015 $2,071,273 2/28/2015 $1,050,000 3/2/2015 3/16/2015 $1,235,900 $1,370,000 4/17/2015 $2,167,308 5/8/2015 $800,000 5/19/2015 $2,013,000 5/21/2015 TBD 6/4/2015 $96,218 6/30/2015 $225,000 11 LPA Projects, cont'd Description PID Project Name 2016 Construction Year 2016 ALL-Cairo Main St. Reconstruction of Main St.(Lincoln Highway) from the WCL to the ECL 10/2015 Improvements of Cairo. ALL-Lima Bike Lanes Construct bike lanes on Main St. in the City of Lima. 1/20/2016 Construct sidewalks and intersection improvements near West ALL-SRTS-Lima Elementary, Unity Elementary, Heritage Elementary and North Middle 1/20/2016 School. Construct sidewalks and rectangular rapid flash beacons on Second ALL-SRTS-Spencerville 1/2016 St. from SR 66 to the school. VAN-Washington St. Phase III Reconstruction and widening from Fox Rd. to Ervin Rd. 2/11/16 Construct sidewalk along the west side of Harrmann Rd. from the PAU-SRTS-Antwerp Phase II school to Canal Rd. and along the north side of Canal Rd. from 4/2016 Harrmann Rd. to Koos Dr. 5/2016 HAN-Findlay FY16 Resurfacing Resurfacing and curb repair in the City of Findlay. Design Build. As part of the Ohio Bridge Partnership Program, replace HAR-TR155-7.50 5/19/2016 TR 155 bridge over Taylor Creek. Design Build. As part of the Ohio Bridge Partnership Program, replace ALL-CR22-2.56 6/02/2016 Napolean Rd. bridge over Little Hog Creek. Modify High St. between Metcalf St. and Central Ave. Convert Wayne ALL-Lima Wayne/High St St. to a two-way operation between Jameson Ave. and Central Ave. 6/15/2016 95238 96710 96262 96264 96261 93589 97385 TBD TBD 90949 Sale date Number of Projects Totals 38 Cost $9,484,373 $2,112,167 $200,615 $460,000 $75,591 $3,441,000 $170,000 $825,000 TBD TBD $2,200,000 Cost $41,508,392 12
© Copyright 2024 ExpyDoc