Detailed Sample
Material
Class
Price Code
Description
Takeoff Quantity
Waste
Material Quantity
Material Price
00001
GENERAL
NOTES
GENERAL NOTES
FOR PRICING ONLY
ALL UNSPECIFIED ITEMS BEST
GUESS
ESTIMATE IS USED @
BUILDER'S/SUPPLIER'S RISK
AMT CONSTRUCTION
SERVICES INC ASSUMES NO
LIABILITY
IF PLAN AND DETAIL DISAGREE
ESTIMATE DEFAULTS TO
DETAIL
IF DETAIL NOTE AND DETAIL
DRAWING DISAGREE DEFAULT
TO DETAIL NOTE
IF STURCTURAL AND
ARCHITECTURAL DISAGREE
EST. DEFAULTS TO
STRUCTURAL
IF SPEC BOOK AND
ARCHITECTURAL DISAGREE
EST. DEFAULTS TO SPEC BOOK
STRUCTURAL PLAN MARKED
"NOT FOR CONSTRUCTION"
1.00 note
1.00 note
1.00 note
1.00 note
/note
/note
1.00 note
1.00 note
/note
1.00 note
1.00 note
/note
1.00 note
1.00 note
/note
1.00 note
1.00 note
/note
1.00 note
1.00 note
/note
1.00 note
1.00 note
/note
1.00 note
1.00 note
/note
1.00 note
1.00 note
/note
01000
Eng. Notes
Engineering Notes
No Steel to Steel Connections,
Fasteners , Plates Or Caps Are
Included
Total
Material Cost
AMT
AMT-Andy
Page 3
2/16/2014
Detailed Sample
Material
Class
Price Code
Description
Takeoff Quantity
Waste
Material Quantity
Material Price
Engineering Notes
Structural Framing to be DF/L #2
and Btr UNO
Timber Is DF/LO #2 And Btr
UNO
Headers Assumed (2) 2x10 UNO
Spec
Glulam Beams Are Architectural
Appearence Grade DF/DF
OPTION TO USE TALL (9'-0"or
10'-0") Sheathing in Lieu of 8'-0"
VERIFY OSB SUBSTITUTIONS
Verify use of Z-Max Hangers/
Stainless Hardware @ Treated
Lumber
1.00 note
1.00 note
/note
1.00 note
1.00 note
/note
1.00 note
1.00 note
/note
1.00 note
1.00 note
/note
1.00 note
1.00 note
/note
1.00 note
1.00 note
1.00 note
1.00 note
/note
/note
1.00 note
226.77 lnft
2,367.14 sqft
1.00 note
236.00 lnft
2,438.15 sqft
/note
/lnft
/sqft
5.00 each
5.00 each
/each
149.00 each
124.99 sqft
149.00 each
125.00 sqft
/each
/sqft
413.24 lnft
414.00 lnft
/lnft
02000 Site
Work
Flexible Pavement
Drive to Property Line
Driveway Steel Edging-Curved
Asphalt Driveway Paving-8"Road
Base/4"Gravel/Min 5" Thick
4
3
Retaining Walls
Boulder Column Base
2'-0"x2'-0"x2'-0" Approx
Individually Placed Boulders
Stone Slab Landscape Steps (17)
Steps Shown
03319
Found/Foo
ting
Subdrainage
Foundation Drain- 4" Perf Pipe
Perimeter+80'-0"
Total
Material Cost
AMT
AMT-Andy
Page 4
2/16/2014
Detailed Sample
Material
Class
Price Code
Description
Takeoff Quantity
Waste
Material Quantity
Material Price
Basic Conc. Materials
Found. Waterproofing-Mastic
DISCO 540 (Double Layer 100
Mil. Min.)
Marflex Drain and Dryboard2-3/8" Insulation/drainage medium
Miradrain Drainage Medium
Carlisle CCW-500-R Hot Fluid
Applied Wp Mem @ Uphill
Side-Alternate(delete Eq. SF of
DISCO 540 if Using)
2,913.82 sqft
2,914.00 sqft
/sqft
2,365.17 sqft
3
2,438.00 sqft
/sqft
548.65 sqft
1,178.80 sqft
3
3
566.00 sqft
1,216.00 sqft
/sqft
/sqft
26.00 lnft
24.00 lnft
13.00 lnft
5
5
28.00 lnft
26.00 lnft
13.00 lnft
/lnft
/lnft
/lnft
3.00 roll
/roll
Concrete Forms
Void Form-4"x8"
Void Form-4"x12"
Footing Form-12" Dia Sona Tube
Concrete Accessories
10-mil Plastic Underlayment 1000
SF Roll
Reinforcing Bar Chairs
Anchor Bolts-1/2"x10"
2,301.44 sqft
387.12 lnft
114.00 each
98.00 each
114.00 each
/each
/each
11.00
307.00
0.14
6.38
6.52
/each
/each
/ton
/ton
/ton
Reinforcing Steel
Reinforcing Steel #4 x 40'
Reinforcing Steel #5 x 40'
Reinforcing Steel #4 Lbs/Ton
Reinforcing Steel #5 Lbs/Ton
Reinforcing Steel -TOTAL
ACCUMULATED WEIGHT
414.17
12,251.92
276.66
12,765.64
13,042.31
lnft
lnft
lbs
lbs
lbs
each
each
ton
ton
ton
Cast in Place Concrete
Ready Mix Concrete- 3000
psi-Footer
Ready Mix Concrete- 3000
psi-Wall
Ready Mix Concrete- 3000 psi-Pier
Ready Mix Concrete- 3000
psi-Slab
39.29 cy
39.29 cy
/cy
90.01 cy
90.01 cy
/cy
0.38 cy
48.47 cy
0.38 cy
48.47 cy
/cy
/cy
Total
Material Cost
AMT
AMT-Andy
Page 5
2/16/2014
Detailed Sample
Material
Class
Price Code
Description
Takeoff Quantity
Waste
Material Quantity
Material Price
Cast in Place Concrete
Ready Mix Concrete- TOTAL
ACCUMULATED CY CONCRETE
178.14 cy
178.14 cy
/cy
12.00
152.14
73.72
45.20
23.43
5.00
45.63
6.00
6.00
9.50
31.00
133.46
26.00
each
lnft
lnft
lnft
lnft
lnft
lnft
lnft
lnft
lnft
each
lnft
lnft
12.00
153.00
74.00
46.00
24.00
5.00
46.00
6.00
6.00
10.00
31.00
134.00
26.00
each
lnft
lnft
lnft
lnft
lnft
lnft
lnft
lnft
lnft
each
lnft
lnft
/each
/lnft
/lnft
/lnft
/lnft
/lnft
/lnft
/lnft
/lnft
/lnft
/each
/lnft
/lnft
18.50
23.51
107.21
28.75
6.75
7.27
7.50
6.35
15.31
13.91
31.74
44.39
7.52
4.50
16.00
28.81
5.00
lnft
lnft
lnft
lnft
lnft
lnft
lnft
lnft
lnft
lnft
lnft
lnft
lnft
lnft
lnft
lnft
lnft
19.00
24.00
108.00
29.00
7.00
8.00
8.00
7.00
16.00
14.00
32.00
45.00
8.00
5.00
17.00
29.00
5.00
lnft
lnft
lnft
lnft
lnft
lnft
lnft
lnft
lnft
lnft
lnft
lnft
lnft
lnft
lnft
lnft
lnft
/lnft
/lnft
/lnft
/lnft
/lnft
/lnft
/lnft
/lnft
/lnft
/lnft
/lnft
/lnft
/lnft
/lnft
/lnft
/lnft
/lnft
Footings/Walls
Footer Step
Footer- Lnft of 8"x16"
Footer-Lnft of 12"x24"
Footer-Lnft of 12"x32"
Footer-Lnft of 12"x40"
Footer-Lnft of 12"x44"
Footer-Lnft of 12"x46"
Footer-Lnft of 12"x48"
Footer-Lnft of 12"x58"
Footer-Lnft of 12"x56"
Wall Step
Concrete Wall-Lnft of Inside Ledge
Concrete Wall 8"x2'-10"-Grade
Beam
Concrete Wall 8"x3'-10"
Concrete Wall 8"x4'-0"
Concrete Wall 8"x4'-6"
Concrete Wall 8"x5'-0"
Concrete Wall 8"x5'-6"
Concrete Wall 8"x8'-6"
Concrete Wall 8"x9'-4"
Concrete Wall 8"x9'-10"
Concrete Wall 8"x10'-8"
Concrete Wall 8"x10'-10"
Concrete Wall 8"x11'-2"
Concrete Wall 8"x11'-10"
Concrete Wall 8"x13'-10"
Concrete Wall 8"x15'-10"
Concrete Wall 10"x8'-0"
Concrete Wall 10"x8'-10"
Concrete Wall 10"x10'-0"
Total
Material Cost
AMT
AMT-Andy
Page 6
2/16/2014
Detailed Sample
Material
Class
Price Code
Description
Takeoff Quantity
Waste
Material Quantity
Material Price
Footings/Walls
Concrete Wall 10"x12'-0"
Concrete Wall 10"x13'-6"
Concrete Wall 10"x17'-4"
4.00 lnft
8.50 lnft
20.69 lnft
4.00 lnft
9.00 lnft
21.00 lnft
/lnft
/lnft
/lnft
Conc Pads
Conc Pad-42"x42"x8"
Conc Pad-24"x24"x12"
Conc Pad-30"x30"x12"
Conc Pad-36"x36"x12"
Conc Pad-48"x48"x12"
Conc Pad-60"x60"x18"
Conc Pad-72"x72"x18"
Conc Pad-84"x48"x18"
2.00
7.00
3.00
5.00
2.00
2.00
1.00
1.00
each
each
each
each
each
each
each
each
2.00
7.00
3.00
5.00
2.00
2.00
1.00
1.00
each
each
each
each
each
each
each
each
/each
/each
/each
/each
/each
/each
/each
/each
5.00 each
13.00 lnft
/each
/lnft
Conc Piers
Pier Count- 12" Diameter Piers
Pier Total Lnft-12" Diameter
5.00 each
13.00 lnft
03320
Flatwork
Welded Wire Fabric
6x6 Welded Wire Mesh
3,627.46 sqft
5
3,810.00 sqft
/sqft
930.00 sqft
398.00 sqft
/sqft
/sqft
Flatwork
1-1/2" Conc. Slab @ Raised Deck
5" Conc. Slab-Under Flagstone
Pavers
5" Conc. Slab-Garage/Bsmnt
8" Conc. Slab @ Fire Place
Total LF of Thickened Edge
Total LF of Stepped Slab
929.27 sqft
396.75 sqft
2,301.44
52.07
96.29
24.04
sqft
sqft
lnft
lnft
2,302.00
54.00
98.00
26.00
sqft
sqft
lnft
lnft
/sqft
/sqft
/lnft
/lnft
304.00 CF
/CF
Cementitious Underlayment
1-1/2" Gypcrete SF/CF
04210.12St
one Veneer
Masonry Acces.
2,430.21 sqft
Total
Material Cost
AMT
AMT-Andy
Page 7
2/16/2014
Detailed Sample
Material
Class
Price Code
Description
Takeoff Quantity
Waste
Material Quantity
Material Price
Masonry Acces.
Carlise Miradrain 9000 Drainage
Medium-@ Elevated Deck
929.27 sqft
930.00 sqft
/sqft
Stone Veneer
Stone Veneer Assembly SF(siding)
Stone Veneer Sill LF(siding) 2"
Thick x 8" Width
Stone Veneer Cap LF(siding)
Approx 18" Wide @ Hot Tub
Stone Veneer Sill LF(siding) Wide
@ Stair 2"Thick x 16" Width
Stone Chimney Cap Cap 4"Thick
x 7'-3" x 5'-4"
Sandstone Wall Cap 2" thick
Approx. 2'-0" Wide
Stone Hearth (exterior)-CO Buff
4"x17"x9'-1-1/4"
Stone Hearth (exterior)-CO Buff
4"x11"x4'-0"
Stone Mantle (exterior)-CO Buff
4"x15"x5'-0"
Stone Mantle (exterior)-CO Buff
8"x10-1/4"x4'-6"
Stone Mantle (interior)-CO Buff
7"x15"x4'-9"
Stone Hearth (interior)-CO Buff
4"x17"x9'-1-1/4"
Stone Hearth (interior)-CO Buff
4"x11"x4'-0"
Stone Slab Back Splash @ Out
Door Kitchen
3,290.01 sqft
129.62 lnft
10
10
3,620.00 sqft
144.00 lnft
/sqft
/lnft
34.81 lnft
10
40.00 lnft
/lnft
12.00 lnft
10
14.00 lnft
/lnft
1.00 each
111.17 sqft
1.00 each
10
124.00 sqft
/each
/sqft
1.00 each
1.00 each
/each
1.00 each
1.00 each
/each
1.00 each
1.00 each
/each
1.00 each
1.00 each
/each
1.00 each
1.00 each
/each
1.00 each
1.00 each
/each
1.00 each
1.00 each
/each
84.56 sqft
85.00 sqft
/sqft
6.00 each
156.00 each
124.00 each
6.00 each
156.00 each
124.00 each
/each
/each
/each
Structural Steel Fastener
Titen HD 5/8"x4"
Concrete Wedge Anchors-1/2"x4"
Concrete Wedge Anchors-5/8"x4"
Total
Material Cost
AMT
AMT-Andy
Page 8
2/16/2014
Detailed Sample
Material
Class
Price Code
Description
Takeoff Quantity
L4"x4"x1/4" Steel Lintel-LF @
Stone Veneer
L6"x6"x3/8"Steel Lintel-LF
VERIFY @ House Wall Stone
Veneer (3/A6.8) No Spec @ Struct.
L6"x4"x1/4" Steel Angle
191.91 lnft
Waste
Material Quantity
Material Price
Lintels
192.00 lnft
/lnft
162.00 lnft
/lnft
5.50 lnft
6.00 lnft
/lnft
2,341.88 sqft
2,342.00 sqft
/sqft
158.65 lnft
2
Building Insulation
Carlisle Miradrain 6000 or
Enkadrain 3611R @ Masonry
Walls On Wd Studs
Cor-A-Vent 1/2" Thick Masonry
Vent @ Top Of Stone Veneer
188.70 lnft
4.00 nft
/nft
04810.00U
nit
Masonry
Unit Pavers
Stone Pavers-Morter Set On Slab
Stone Pavers-Morter Set On Deck
Stone Pavers-Individually Placed
Stone Pavers-Sand Set
396.75
929.27
62.46
683.00
sqft
sqft
sqft
sqft
3
3
3
3
410.00
958.00
66.00
704.00
sqft
sqft
sqft
sqft
/sqft
/sqft
/sqft
/sqft
05010 Steel
Structural Steel Fastener
Lag Bolts 3/4"x6" @ Channel
Headers
Lag Bolts 3/4"x7" @ Channel
Headers
74.00 each
74.00 each
/each
33.00 each
33.00 each
/each
1.00 each
1.00 each
/each
1.00 each
1.00 each
/each
Channel Steel
C8x8.5x4'-6" (interior)-Only Width
Called Out
C8x8.5x8'-6" (interior)-Only Width
Called Out
Lintels
Total
Material Cost
AMT
AMT-Andy
Page 9
2/16/2014
Detailed Sample
Material
Class
Price Code
Description
Takeoff Quantity
Waste
Material Quantity
Material Price
Lintels
L8x4x5/16" Steel Angle Slab
Closure
27.95 lnft
28.00 lnft
/lnft
Structural Steel Plates
Plate Steel 3/8"x2'-11-3/16"x5'-3"
Non-Struct Interior @ Fire Place
Plate Steel @ Int. Dr Jamb @
Office 1/4"x6-1/4"x 3'-6" VERIFY
Sizes
Plate Steel @ Int. Dr Jamb @
Office 1/4"x6-1/4"x 6'-4" VERIFY
Sizes
Plate Steel @ Int. Dr Jamb @
Office 1/4"x6-1/4"x 8'-0" VERIFY
Sizes
3.00 each
3.00 each
/each
1.00 each
1.00 each
/each
1.00 each
1.00 each
/each
2.00 each
2.00 each
/each
05010
Steel
Headers
Channel Steel
Non-Struct Steel Headers
C10x15.3x2'-9"
C10x15.3x3'-0"
C10x15.3x3'-3"
C10x15.3x3'-6"
C10x15.3x4'-0"
C10x15.3x4'-3"
C10x15.3x4'-6"
C10x15.3x6'-0"
C10x15.3x7'-4"
C10x15.3x7'-6"
C10x15.3x8'-3"
C10x15.3x8'-6"
C10x15.3x9'-0"
C10x15.3x9'-6"
1.00
1.00
2.00
1.00
4.00
2.00
1.00
4.00
1.00
1.00
11.00
1.00
2.00
11.00
1.00
note
each
each
each
each
each
each
each
each
each
each
each
each
each
each
1.00
1.00
2.00
1.00
4.00
2.00
1.00
4.00
1.00
1.00
11.00
1.00
2.00
11.00
1.00
note
each
each
each
each
each
each
each
each
each
each
each
each
each
each
/note
/each
/each
/each
/each
/each
/each
/each
/each
/each
/each
/each
/each
/each
/each
Total
Material Cost
AMT
AMT-Andy
Page 10
2/16/2014
Detailed Sample
Material
Class
Price Code
Description
Takeoff Quantity
Waste
Material Quantity
Material Price
Channel Steel
C10x15.3x10'-6"
C10x15.3x11'-4"
C10x15.3x11'-6"
C10x15.3x12'-0"
C10x15.3x16'-4"
C10x15.3x18'-0" VERIFY @ OH
Garage Dr
C15x33.9x20'-6" @ West
Livingroom
1.00
1.00
1.00
1.00
1.00
1.00
each
each
each
each
each
each
2.00 each
1.00
1.00
1.00
1.00
1.00
1.00
each
each
each
each
each
each
/each
/each
/each
/each
/each
/each
2.00 each
/each
05012
Steel 1rst
Flr
Structural Steel Fastener
Titen HD 5/8"x5"
Concrete Wedge Anchors-1/2"x10"
Epoxy Anchors-1/2"x6"
Epoxy Anchors-1/2"x8"
Epoxy Anchors-1/2"x10"
14.00
12.00
14.00
2.00
4.00
each
each
each
each
each
14.00
12.00
14.00
2.00
4.00
each
each
each
each
each
/each
/each
/each
/each
/each
1.00 note
1.00 note
/note
1.00 note
1.00 note
/note
4.00
1.00
1.00
1.00
1.00
1.00
1.00
4.00
1.00
1.00
1.00
1.00
1.00
1.00
each
each
each
each
each
each
each
/each
/each
/each
/each
/each
/each
/each
1.00 each
1.00 each
/each
/each
Structural Steel
ALL STEEL LENGTHS ARE
NOMINAL TYP.
Waterproof Deck Steel Included
Here
W8x35x2'-6"
W8x40x7'-6"
W10x15x6'-9"
W10x30x13'-9"
W12x30x11'-6"
W12x30x17'-6"
W12x30x18-3" w/ (4) 1/4x4x0'-8"
Knife PL
W12x30x19'-0"
W12x30x26'-6"
each
each
each
each
each
each
each
1.00 each
1.00 each
Total
Material Cost
AMT
AMT-Andy
Page 11
2/16/2014
Detailed Sample
Material
Class
Price Code
Description
Takeoff Quantity
Waste
Material Quantity
Material Price
Structural Steel
W12x30x31'-0" w/ (14) 1/4x4x0'-8"
Knife PL
W12x50x21-2"
W12x58x19-6"
W16x77x24-9"
1.00 each
1.00 each
/each
1.00 each
1.00 each
2.00 each
1.00 each
1.00 each
2.00 each
/each
/each
/each
1.00 note
1.00 note
/note
5.00 each
5.00 each
/each
5.00 each
5.00 each
/each
1.00
2.00
1.00
2.00
1.00
2.00
1.00
2.00
each
each
each
each
/each
/each
/each
/each
1.00 each
1.00 each
/each
1.00 each
2.00 each
1.00 each
1.00 each
2.00 each
1.00 each
/each
/each
/each
1.00 note
1.00 note
/note
1.00
1.00
2.00
1.00
1.00
1.00
2.00
1.00
/each
/each
/each
/each
Structural Steel-HSS Tube
ALL STEEL LENGTHS ARE
NOMINAL TYP.
HSS3x3x1/4x0'-3"-VERIFY @
Timber Post Cap-No spec
HSS3x3x1/4x2'-0" w/ BsPL #6 &
3/4"x8x0'-8" Cap/Knife PL (at
Timber Post Base)
HSS3x3x1/4x8'-5" w/ BsPL #3
HSS3x3x1/4x9'-7-1/2" w/ BsPL #3
HSS3x3x1/4x9'-8-1/2" w/ BsPL #1
HSS4x4x1/4x7'-11-1/2" w/ Bs PL
#3
HSS4x4x1/4x7'-11-1/2" w/ Bs PL
#4
HSS4x4x1/4x8'-0" w/ BsPL #4
HSS4x4x1/4x9'-4-1/2" w/ BsPL #2
HSS5x5x5/16x8'-0" w/ BsPL #5
each
each
each
each
Channel Steel
ALL STEEL LENGTHS ARE
NOMINAL TYP.
C12x20.7x8'-0" ***
C12x20.7x22'-0"
C12x20.7x24'-0"
C12x20.7x48'-9"
each
each
each
each
each
each
each
each
Lintels
L5"x5"x5/16" Steel Angle
13.00 lnft
14.00 lnft
/lnft
Structural Steel Plates
BS PL 1"x5-1/2"x1'-0"
#5
1.00 each
1.00 each
/each
Total
Material Cost
AMT
AMT-Andy
Page 12
2/16/2014
Detailed Sample
Material
Class
Price Code
Description
Takeoff Quantity
Waste
Material Quantity
Material Price
Structural Steel Plates
BS PL 1"x10"x0'-10" #2
BS PL 3/4"x8"x0'-8" #6
BS PL 3/4"x10"x0'-10" #1
BS PL 5/8"x5"x0'-10" #3
BS PL 5/8"x5"x0'-11" #4
2.00
1.00
1.00
5.00
2.00
each
each
each
each
each
2.00
1.00
1.00
5.00
2.00
each
each
each
each
each
/each
/each
/each
/each
/each
Metal Decking
Struc Metal Decking 2" x 20 Ga.
55.53 sqft
10
62.00 sqft
/sqft
8.00 each
12.00 each
/each
/each
05013
Steel 2nd
Flr
Structural Steel Fastener
Concrete Wedge Anchors-1/2"x10"
Epoxy Anchors-1/2"x6"
8.00 each
12.00 each
Structural Steel
W10x26x16'-0"
W12x19x15'-0"
W12x30x18-6"
W12x40x14'-0"
W12x40x18-6"
W12x58x19-0"
1.00
1.00
1.00
1.00
1.00
1.00
each
each
each
each
each
each
1.00
1.00
1.00
1.00
1.00
1.00
each
each
each
each
each
each
/each
/each
/each
/each
/each
/each
1.00
3.00
1.00
1.00
1.00
each
each
each
each
each
1.00
3.00
1.00
1.00
1.00
each
each
each
each
each
/each
/each
/each
/each
/each
1.00 each
1.00 each
/each
1.00 each
1.00 each
/each
1.00 each
1.00 each
/each
Structural Steel-HSS Tube
HSS3x3x1/4x6'-2-1/2" w/ BsPL #4
HSS3x3x1/4x9'-1-3/4" w/ BsPL #4
HSS3x3x1/4x9'-1-3/4" w/ BsPL #3
HSS3x3x1/4x10'-3"
HSS3x3x1/4x10'-4-3/4" w/ BsPL
#1
HSS3x3x1/4x22'-4-1/2" w/ BsPL
#3
HSS5x5x5/16x19'-9-1/2" w/ BsPL
#2
HSS5x10x1/4x5-'-6"
Structural Steel Plates
Total
Material Cost
AMT
AMT-Andy
Page 13
2/16/2014
Detailed Sample
Material
Class
Price Code
Description
Takeoff Quantity
Waste
Material Quantity
Material Price
Structural Steel Plates
BS PL 1"x10"x0'-10" #2
BS PL 3/4"x10"x0'-10" #1
BS PL 5/8"x5"x0'-10" #3
BS PL 5/8"x5"x0'-11" #4
1.00
1.00
2.00
4.00
each
each
each
each
1.00
1.00
2.00
4.00
each
each
each
each
/each
/each
/each
/each
12.00 each
10.00 each
4.00 each
12.00 each
10.00 each
4.00 each
/each
/each
/each
1.00 each
1.00 each
/each
1.00
1.00
1.00
1.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
1.00
1.00
1.00
1.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
each
each
each
each
each
each
each
each
each
each
each
each
each
/each
/each
/each
/each
/each
/each
/each
/each
/each
/each
/each
/each
/each
1.00 each
1.00 each
/each
1.00 each
1.00 each
/each
05014
Steel @
Roof
Structural Steel Fastener
Epoxt Anchors-1/2"x4"
Epoxt Anchors-1/2"x6"
Epoxt Anchors-1/2"x10"
Structural Steel
HP8x36x6'-6" Column w/
3/4x10x0'-10" Top And Btm
W10x19x8'-10"
W10x19x9'-3"
W10x22x8'-0"
W10x26x3'-0"
W10x26x5'-0"
W10x26x6'-10"
W10x26x11'-9"
W10x30x19'-0"
W10x30x19'-9"
W10x30x21'-9"
W10x30x27'-8"
W10x68x21'-6"
W12x30x9'-3" w/ (3) Knife Plate
for GL Beam @ Low Entry
W12x30x17'-0" w/ (2) KP @
Timber Brace
W12x30x30'-0" w/ (3) KP @
Timber Brace
each
each
each
each
each
each
each
each
each
each
each
each
each
Total
Material Cost
AMT
AMT-Andy
Page 14
2/16/2014
Detailed Sample
Material
Class
Price Code
Description
Takeoff Quantity
Waste
Material Quantity
Material Price
Structural Steel
W14x48x44'-10" w/ (11) KP @ GL
Beam
W14x48x44'-10" w/ (11) KP @ GL
Beam &(3) KP @ Timber Kicker
W14x61x44'-5"
W14x68x22'-0"
1.00 each
1.00 each
/each
1.00 each
1.00 each
/each
1.00 each
1.00 each
1.00 each
1.00 each
/each
/each
1.00 each
1.00 each
/each
1.00 each
1.00 each
/each
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
each
each
each
each
each
each
each
each
/each
/each
/each
/each
/each
/each
/each
/each
2.00 each
2.00 each
/each
1.00
1.00
1.00
2.00
3.00
1.00
1.00
1.00
2.00
3.00
/each
/each
/each
/each
/each
Structural Steel-HSS Tube
HSS3x3x1/4x0'-6" w/ Plate and
Base (no Spec) Timber Base
(1/A6.1)
HSS3x3x1/4x2'-0" w/ BsPL #6 &
3/4"x8x0'-8" Cap/Knife PL (at
Timber Post Base)
HSS3x3x1/4x13'-9"
HSS3x3x1/4x14'-8" w/ BsPL #4
HSS3x3x3/16x2'-8"
HSS3x3x3/16x4'-3" w/ BsPL #3
HSS3x3x3/16x13'-4" w/ BsPL #3
HSS3x3x3/16x14'-6" w/ BsPL #3
HSS3x3x3/16x15'-6" w/ BsPL #4
HSS4x4x1/4x0'-4" w/ 1/2"x9x0'-9"
Plate& Knife Plate Timber
Cap(1/A6.6)
HSS4x4x1/4x3'-11" For Chimney
Cap Support
HSS4x4x1/4x4'-4"
HSS4x4x1/4x13'-1"
HSS4x4x1/4x13'-10"
HSS5x3x1/4x4'-0"
HSS6x6x1/4x0'-3"
w/3/4"x9-1/2x0'-9-1/2" BsPL/KP @
Timber Column (8/A6.9)
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
Total
Material Cost
AMT
AMT-Andy
Page 15
2/16/2014
Detailed Sample
Material
Class
Price Code
Description
Takeoff Quantity
Waste
Material Quantity
Material Price
Structural Steel-HSS Tube
HSS6x6x1/4x0'-6"w/3/4"x9-1/2x0'9-1/2" Cap/KP &5/8"x12x1'0"BsPL
@ Timber Column (8/A6.9)
3.00 each
3.00 each
/each
1.00 each
3.00 each
2.00 each
1.00 each
3.00 each
2.00 each
/each
/each
/each
4.00 each
4.00 each
/each
2.00 each
2.00 each
/each
Structural Steel Plates
BS PL 3/4"x8"x0'-8" #6
BS PL 5/8"x5"x0'-10" #3
BS PL 5/8"x5"x0'-11" #4
05580
MtlFabricat
ion
Metal Stairs
Custom Steel Stair Carriage 9'-6"
Nominal-(2)C8x11.5 w/ 1/2" Stl
Tread Pans
Custom Steel Stair Carriage 11'-0"
Nominal-(2)C8x11.5 w/ 1/2" Stl
Tread Pans
Mtl Handrails/Railings
Lnft of Metal Guardrail @ Deck
Lnft of Metal Guardrail @ Interior
Stairs
110.39 lnft
69.88 lnft
111.00 lnft
70.00 lnft
/lnft
/lnft
06001
Frame
Sundries
Fasteners
Framing Nail Allowance
Sheathing Nail Allowance
Hanger Nail Allowance
Siding Nail Allowance
Timber and/or Steel Bolt Allowance
Steel Shims
Sheet Waterproofing
1.00
1.00
1.00
1.00
1.00
35.71
allw
allw
allw
allw
allw
lbs
1.00
1.00
1.00
1.00
1.00
36.00
allw
allw
allw
allw
allw
lbs
/allw
/allw
/allw
/allw
/allw
/lbs
Total
Material Cost
AMT
AMT-Andy
Page 16
2/16/2014
Detailed Sample
Material
Class
Price Code
Description
Takeoff Quantity
Waste
Material Quantity
Material Price
Sheet Waterproofing
Ice and Water Guard -Base Of
Wall -LF/Roll
177.57 lnft
2.37 Roll
/Roll
260.36 lnft
30.74 lnft
6.00 roll
1.00 roll
/roll
/roll
Building Insulation
Sill Seal 6"x 50ft Roll
Sill Seal 7-1/2"x 50ft Roll
06110.01Wl
k Out Wall
Bsmnt Ext. Walls
4x8x7/16" OSB Wall Sheathing
2x6x16 Treated Sills
2x6x16 Plate
2x4x12 Bracing Stock
2x6x10 Wall Stud
951.85
6.75
21.28
5.46
130.15
sqft
each
each
each
each
30.00
7.00
22.00
6.00
131.00
each
each
each
each
each
/each
/each
/each
/each
/each
1.00 note
1.00 note
/note
8.00 each
8.00 each
/each
3.00 each
4.00 each
3.00 each
4.00 each
/each
/each
4.00 each
4.00 each
/each
Bsmnt Ext. Wall Headers
Interior and Exterior Struct.
Headers Included Here
1-3/4"x5-1/2"x21' LVL Wall Stud
@ Elevator Shaft
1-3/4"x9-1/2"x5' LVL Header
1-3/4"x11-7/8"x21' LVL Blocking
@ Elevator Shaft (No Spec)
2x10x12 Headers
06110.03
Bsmnt Int
W
Bsmnt Interior Walls
2x4x16 Treated Sill
2x6x16 Treated Sills
2x4x16 Plate
2x6x16 Plate
2x4x10 Wall Stud
2x4x12 Wall Stud
2x4x16 Wall Stud
7.00
6.62
19.48
18.36
75.40
24.06
13.22
each
each
each
each
each
each
each
7.00
7.00
20.00
19.00
76.00
25.00
14.00
each
each
each
each
each
each
each
/each
/each
/each
/each
/each
/each
/each
Total
Material Cost
AMT
AMT-Andy
Page 17
2/16/2014
Detailed Sample
Material
Class
Price Code
Description
Takeoff Quantity
Waste
Material Quantity
Material Price
Bsmnt Interior Walls
2x6x10 Wall Stud
127.92 each
128.00 each
/each
1.00 note
1.00 note
/note
28.00 each
2,194.00 Lnft
/each
/Lnft
100.00 sqft
4.00 each
/each
2,622.36 sqft
100.00 sqft
82.00 each
4.00 each
/each
/each
06110.10
1st Sub Flr
1rst Sub Flr
Water Proof Deck Material
Included Here
Construction Adhesive-Qt
3x6 T&G Decking R/L DF Wire
brush Tex. 1/8"x1/8" Joint Reveal
4x8x5/8" OSB Sheathing For I
Joist Web Packing
4x8x3/4" T&G OSB Sheathing
4x8x3/4" OSB Sheathing For I
Joist Web Packing
2x8x10 Treated Blocking
2x8x12 Treated Blocking
2x12x8 Treated Ledger
2x12x10 Treated Ledger
2x10x16 Treated Sills
2x8x12 Steel Beam Nailer
Lnft/Ea
2x10x12 Steel Beam Nailer Lnft/Ea
2x12x12 Steel Beam Nailer Lnft/Ea
27.23 each
960.80 sqft
4.00
4.00
1.00
2.00
2.00
89.79
each
each
each
each
each
lnft
10
each
each
each
each
each
each
/each
/each
/each
/each
/each
/each
2.00 each
8.00 each
/each
/each
2.00 each
2.00 each
1.00 each
2.00 each
2.00 each
1.00 each
/each
/each
/each
2.00
2.00
1.00
6.00
2.00
2.00
1.00
6.00
/each
/each
/each
/each
21.27 lnft
94.38 lnft
4.00
4.00
1.00
2.00
2.00
8.00
1rst Sub Flr Beams
1-3/4"x14"x6' LVL Beam
1-3/4"x14"x7' LVL Beam
1-3/4"x14"x8' LVL Rim-VERIFY
Grid 9/H Pg.S3
1-3/4"x14"x13' LVL Beam
1-3/4"x14"x17' LVL Beam
6x12x10 Cantilevered Deck Beam
6x12x12 Cantilevered Deck Beam
each
each
each
each
each
each
each
each
Total
Material Cost
AMT
AMT-Andy
Page 18
2/16/2014
Detailed Sample
Material
Class
Price Code
Description
Takeoff Quantity
Waste
Material Quantity
Material Price
1rst Sub Flr Beams
6x12x16 Cantilevered Deck Beam
Stock
8x8x8 Brace Exterior (no Spec)
8x8x14 Brace Stock Exterior (no
Spec)
10x10x8 Post Exterior
10x10x14 Post Stock Exterior
1.00 each
1.00 each
/each
1.00 each
1.00 each
1.00 each
1.00 each
/each
/each
2.00 each
1.00 each
2.00 each
1.00 each
/each
/each
1.00 note
1.00 note
/note
1.00
1.00
2.00
1.00
1.00
2.00
2.00
2.00
2.00
4.00
1.00
1.00
2.00
1.00
1.00
2.00
2.00
2.00
2.00
4.00
each
each
each
each
each
each
each
each
each
each
/each
/each
/each
/each
/each
/each
/each
/each
/each
/each
1.00 note
1.00 note
/note
1.00 note
1.00 note
1.00 note
1.00 note
1.00 note
1.00 note
/note
/note
/note
1rst Sub Flr Glulams
These GL Beams Are Under The
Waterproof Deck and Are 24F-V4
DF/DF
GL Beam 6-3/4"x12"x9'-0"
GL Beam 6-3/4"x12"x12'-0"
GL Beam 6-3/4"x12"x13'-0"
GL Beam 6-3/4"x12"x14'-0"
GL Beam 6-3/4"x12"x15'-0"
GL Beam 6-3/4"x12"x19'-0"
GL Beam 6-3/4"x12"x20'-0"
GL Beam 6-3/4"x12"x21'-0"
GL Beam 6-3/4"x12"x22'-0"
GL Beam 6-3/4"x12"x23'-0"
each
each
each
each
each
each
each
each
each
each
1rst Sub Flr I Joists
Joist Lengths Run Through Flush
Steel Beams When Avoiding
Fractions Of A Foot
All Floor Joists Are BCI Typ.
All Floor Joists Are 14" Typ
All Floor Joists Are BCI 6000 1.7
Series Typ
7'-0" I Joist
9'-0" I Joist
11'-0" I Joist
12'-0" I Joist
14'-0" I Joist
3.00
7.00
17.00
3.00
6.00
each
each
each
each
each
3.00
7.00
17.00
3.00
6.00
each
each
each
each
each
/each
/each
/each
/each
/each
Total
Material Cost
AMT
AMT-Andy
Page 19
2/16/2014
Detailed Sample
Material
Class
Price Code
Description
Takeoff Quantity
Waste
Material Quantity
Material Price
1rst Sub Flr I Joists
17'-0" I Joist
18'-0" I Joist
22'-0" I Joist
33'-0" I Joist
14" Blocking Panel
1-1/4"x14" LSL Rim
1.00
2.00
5.00
12.00
40.56
32.67
each
each
each
each
lnft
lnft
1.00
2.00
5.00
12.00
41.00
34.00
each
each
each
each
lnft
lnft
/each
/each
/each
/each
/lnft
/lnft
2,327.40
6.94
51.24
10.85
28.14
34.52
48.33
58.07
35.97
7.00
2.00
18.00
sqft
each
each
each
each
each
each
each
each
each
each
each
73.00
7.00
52.00
12.00
29.00
35.00
49.00
59.00
36.00
7.00
2.00
18.00
each
each
each
each
each
each
each
each
each
each
each
each
/each
/each
/each
/each
/each
/each
/each
/each
/each
/each
/each
/each
7.00
1.00
1.00
3.00
3.00
4.00
3.00
1.00
4.00
3.00
each
each
each
each
each
each
each
each
each
each
7.00
1.00
1.00
3.00
3.00
4.00
3.00
1.00
4.00
3.00
each
each
each
each
each
each
each
each
each
each
/each
/each
/each
/each
/each
/each
/each
/each
/each
/each
3
06110.22
1st Ex Wall
1rst Exterior Walls
4x8x7/16" OSB Wall Sheathing
2x6x16 Treated Sills
2x6x16 Plate
2x4x12 Bracing Stock
2x6x8 Wall Stud
2x6x10 Wall Stud
2x6x12 Wall Stud
2x6x14 Wall Stud
2x6x16 Wall Stud
2x6x18 Wall Stud
2x6x20 Wall Stud
2x6x22 Wall Stud Consider
LVL/LSL
1rst Ext Wall Headers
1-3/4"x5-1/2"x10' LVL Posting
1-3/4"x5-1/2"x12' LVL Posting
1-3/4"x9-1/2"x6' LVL Header
1-3/4"x9-1/2"x7' LVL Header
1-3/4"x9-1/2"x9' LVL Header
1-3/4"x9-1/2"x11' LVL Header
1-3/4"x11-7/8"x13' LVL Header
2x10x8 Headers
2x10x12 Headers
2x12x8 Headers
Total
Material Cost
AMT
AMT-Andy
Page 20
2/16/2014
Detailed Sample
Material
Class
Price Code
Description
Takeoff Quantity
Waste
Material Quantity
Material Price
1rst Ext Wall Headers
2x12x12 Headers
1.00 each
1.00 each
/each
06110.32
1st Int Wal
1rst Interior Walls
2x4x16 Treated Sill
2x6x16 Treated Sills
2x4x16 Plate
2x6x16 Plate
2x4x104-5/8" Wall Stud
2x4x10 Wall Stud
2x4x12 Wall Stud
2x6x10 Wall Stud
2x6x12 Wall Stud
2.52
5.94
29.96
21.67
16.95
117.45
42.63
125.86
7.53
each
each
each
each
each
each
each
each
each
3.00
6.00
30.00
22.00
17.00
118.00
43.00
126.00
8.00
each
each
each
each
each
each
each
each
each
/each
/each
/each
/each
/each
/each
/each
/each
/each
124.00 each
/each
06110.39
1st Flr Hrw
1rst Sub Flr I Jst Hanger
Simpson ITS2.37/14 Top Flange
Hanger (14" BCI 6000)
123.13 each
1rst Flr Fasteners
Concrete Wedge Anchor- 1/2"x4"
Titen HD Conc. Anchor- 5/8"x6"
Titen HD Conc. Anchor- 5/8"x7"
Through Bolt With Nut /Washer1/2"x4"
Through Bolt With Nut /Washer1/2"x5"
Through Bolt With Nut /Washer1/2"x4-3/4"
Through Bolt With Nut /Washer1/2"x11-1/2"
26.00
8.00
11.50
12.00
each
each
each
each
26.00
8.00
12.00
12.00
each
each
each
each
/each
/each
/each
/each
18.00 each
18.00 each
/each
12.00 each
12.00 each
/each
12.00 each
12.00 each
/each
18.00 each
18.00 each
/each
1rst Flr Hardware
Simpson CJT6
Total
Material Cost
AMT
AMT-Andy
Page 21
2/16/2014
Detailed Sample
Material
Class
Price Code
Description
Takeoff Quantity
Waste
Material Quantity
Material Price
1rst Flr Hardware
Simp. MIT414 14" LVL Single
Top Flange Hanger
1.00 each
1.00 each
/each
06110.40
2nd Sub
Flr
2nd Sub Flr
Construction Adhesive-Qt
4x8x3/4" T&G OSB Sheathing
2x4x8 Treated Plate
2x4x14 Treated Plate
2x6x16 Treated Plate
2x12x14 Treated Ledger
2x6x16 Steel Beam Nailer
2x8x10 Steel Beam Nailer
2x10x10 Steel Beam Nailer
2x12x10 Steel Beam Nailer
12.91
1,242.99
1.00
2.00
1.00
2.00
1.00
2.00
2.00
2.00
each
sqft
each
each
each
each
each
each
each
each
14.00
39.00
1.00
2.00
1.00
2.00
1.00
2.00
2.00
2.00
each
each
each
each
each
each
each
each
each
each
/each
/each
/each
/each
/each
/each
/each
/each
/each
/each
2.00 each
3.00 each
2.00 each
3.00 each
/each
/each
1.00 note
1.00 note
/note
1.00 note
1.00 note
1.00 note
1.00 note
1.00 note
1.00 note
/note
/note
/note
2nd Sub Flr Beams
1-3/4"x11-7/8"x9' LVL Beam
1-3/4"x11-7/8"x12' LVL Beam
2nd Sub Flr I Joist
Joist Lengths Run Through Flush
Beams When Avoiding Fractions
Of A Foot
All Floor Joists Are BCI Typ.
All Floor Joists Are 14" Typ
All Floor Joists Are BCI 6000 1.7
Series Typ
7'-0" I Joist
14'-0" I Joist
23'-0" I Joist
29'-0" I Joist
36'-0" I Joist
14" Blocking Panel
3.00
19.00
5.00
10.00
4.00
56.06
each
each
each
each
each
lnft
3.00
19.00
5.00
10.00
4.00
57.00
each
each
each
each
each
lnft
/each
/each
/each
/each
/each
/lnft
Total
Material Cost
AMT
AMT-Andy
Page 22
2/16/2014
Detailed Sample
Material
Class
Price Code
Description
Takeoff Quantity
Waste
Material Quantity
Material Price
2nd Sub Flr I Joist
1-1/4"x14" LSL Rim
115.16 lnft
3
120.00 lnft
/lnft
52.00
3.00
43.00
22.00
121.00
46.00
18.00
each
each
each
each
each
each
each
/each
/each
/each
/each
/each
/each
/each
1.00 note
1.00 note
/note
4.00
6.00
1.00
1.00
6.00
1.00
2.00
3.00
each
each
each
each
each
each
each
each
4.00
6.00
1.00
1.00
6.00
1.00
2.00
3.00
each
each
each
each
each
each
each
each
/each
/each
/each
/each
/each
/each
/each
/each
25.65
17.03
10.13
54.66
56.37
3.00
34.78
each
each
each
each
each
each
each
26.00
18.00
11.00
55.00
57.00
3.00
35.00
each
each
each
each
each
each
each
/each
/each
/each
/each
/each
/each
/each
06110.50
2nd Ex
Wall
2nd Exterior Wall
4x8x7/16" OSB Wall Sheathing
2x6x16 Treated Sill
2x6x16 Plate
2x6x104-5/8" Wall Stud
2x6x10 Wall Stud
2x6x12 Wall Stud
2x6x14 Wall Stud
1,639.40
3.00
42.13
21.63
120.53
45.25
17.50
sqft
each
each
each
each
each
each
2nd Exterior Wall Headers
Interior and Exterior Structural
Headers Included Here
1-3/4"x5-1/2"x6' LVL Posting
1-3/4"x5-1/2"x8' LVL Posting
1-3/4"x9-1/2"x5' LVL Header
1-3/4"x9-1/2"x9' LVL Header
1-3/4"x11-7/8"x10' LVL Header
1-3/4"x14"x12' LVL Header
2x10x10 Headers
2x12x10 Headers
06110.60
2nd Int Wal
2nd Interior Walls
2x4x16 Plate
2x6x16 Plate
2x4x10 Wall Stud
2x4x12 Wall Stud
2x4x14 Wall Stud
2x6x8 Wall Stud
2x6x10 Wall Stud
Total
Material Cost
AMT
AMT-Andy
Page 23
2/16/2014
Detailed Sample
Material
Class
Price Code
Description
Takeoff Quantity
Waste
Material Quantity
Material Price
2nd Interior Walls
2x6x12 Wall Stud
2x6x14 Wall Stud
2x6x16 Wall Stud
14.27 each
12.00 each
2.00 each
15.00 each
12.00 each
2.00 each
/each
/each
/each
61.08 each
62.00 each
/each
24.00 each
24.00 each
/each
1.00 each
1.00 each
/each
175.00 each
1.00 each
/each
/each
06110.69
2nd Flr
Hrw
2nd Sub Flr I Jst Hangers
Simpson ITS2.37/14 Top Flange
Hanger (14" BCI 6000)
2nd Flr Fasteners
Concrete Wedge Anchor- 5/8"x6"
2nd Flr Hardwr
Simp. MIT414 14" LVL Double
Top Flange Hanger
06111.70
Roof
Frame
Roof Framing
4x8x5/8" CDX Sheathing
4x8x3/4" OSB Sheathing @ Steel
Beam Web Packing
2x6 T&G R/L Roof Decking DF
Wire Brush Tex. 1/8"x1/8" Joint
Reveal
2x8x12 Steel Beam Nailer
Lnft/Ea
2x10x12 Steel Beam Nailer Lnft/Ea
2x6x16 Nail Base Edge LF/Ea
2x8x16 Rafter @ Over Frame
2x10x12 Ridge @ Over Frame
2x12 R/L Rafter Blocking
2x12x10 Rafter
2x12x12 Rafter
5,569.30 sqft
19.77 sqft
1,960.00 sqft
10
19.77 lnft
63.77
479.99
7.00
1.00
394.26
33.00
31.00
lnft
lnft
each
each
lnft
each
each
4,924.00 lnft
2.00 each
10
6.00
33.00
7.00
2.00
396.00
33.00
31.00
each
each
each
each
lnft
each
each
/lnft
/each
/each
/each
/each
/each
/lnft
/each
/each
Total
Material Cost
AMT
AMT-Andy
Page 24
2/16/2014
Detailed Sample
Material
Class
Price Code
Description
Takeoff Quantity
Waste
Material Quantity
Material Price
Roof Framing
2x12x14 Rafter
2x12x16 Rafter
2x12x18 Valley Plate @ Over
Frame
3x10x12 Steel Beam Nailer
3x10x10 Steel Beam Nailer
11.00 each
4.00 each
3.00 each
11.00 each
4.00 each
3.00 each
/each
/each
/each
2.00 each
2.00 each
2.00 each
2.00 each
/each
/each
2.00 each
3.00 each
/each
/each
1.53 each
4.98 each
2.00 each
5.00 each
/each
/each
1.00 note
1.00 note
/note
Roof Wall/Chimney Framing
4x8x7/16" OSB Wall Sheathing
4x8x1-1/8" Pwd Sheathing
(Chimney Cap/Steel Beam Nailer)
2x6x16 Plate
2x6x10 Wall Stud
48.85 sqft
78.10 sqft
Roof Beams/Posts
No Struct. Detail Provided For
6x10 Rafter Tail
Attachment-Assumed 2/3 Back
Span @ Unsupported Eave, w/ (8)
4" Timberlok @ Each
1-3/4"x9-1/2"x7' LVL Beam
1-3/4"x11-1/4"x13' LVL Beam
1-3/4"x11-1/4"x15' LVL Rafter
1-3/4"x11-1/4"x16' LVL Rafter
1-3/4"x11-1/4"x18' LVL Rafter
1-3/4"x11-7/8"x8' LVL Beam
1-3/4"x11-7/8"x10' LVL Beam
1-3/4"x14"x6' LVL Beam
1-3/4"x14"x12' LVL Rafter-VERIFY
in 2x12 Roof @ Chimney Grid G/8
pg. S4
4x8x12 Steel Ridge Beam Nailer
4x8x18 Steel Ridge Beam Nailer
6x10x8 Rafter
6x10x10 Rafter
6x10x12 Rafter
1.00
3.00
11.00
22.00
11.00
3.00
2.00
2.00
4.00
each
each
each
each
each
each
each
each
each
1.00
3.00
11.00
22.00
11.00
3.00
2.00
2.00
4.00
each
each
each
each
each
each
each
each
each
/each
/each
/each
/each
/each
/each
/each
/each
/each
1.00
1.00
5.00
14.00
7.00
each
each
each
each
each
1.00
1.00
5.00
14.00
7.00
each
each
each
each
each
/each
/each
/each
/each
/each
Total
Material Cost
AMT
AMT-Andy
Page 25
2/16/2014
Detailed Sample
Material
Class
Price Code
Description
Takeoff Quantity
Waste
Material Quantity
Material Price
Roof Beams/Posts
6x10x14 Rafter
6x10x18 Rafter
6x10x20 Rafter
6x10x22 Rafter
6x10x24 Rafter
6x12x14 Rafter DF #1
6x12x16 Rafter DF#1
6x12x20 Steel Ridge Beam Nailer
6x12x20 Rafter DF #1
6x12x22 Rafter DF #1
6x12x24 Rafter DF #1
8x8x8 Brace
8x8x10 Brace
8x8x14 Brace Stock
8x12x6 Beam
8x12x8 Beam
8x12x10 Beam
8x12x12 Beam
8x12x16 Beam
8x14x12 Steel Ridge Beam Nailer
8x14x20 Steel Ridge Beam Nailer
10x10x8 Post
10x10x10 Post
10x10x12 Post
10x10x16 Post Stock
7.00
2.00
2.00
1.00
2.00
3.00
3.00
1.00
1.00
1.00
3.00
7.00
2.00
1.00
1.00
1.00
2.00
3.00
1.00
2.00
1.00
1.00
2.00
1.00
1.00
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
7.00
2.00
2.00
1.00
2.00
3.00
3.00
1.00
1.00
1.00
3.00
7.00
2.00
1.00
1.00
1.00
2.00
3.00
1.00
2.00
1.00
1.00
2.00
1.00
1.00
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
/each
/each
/each
/each
/each
/each
/each
/each
/each
/each
/each
/each
/each
/each
/each
/each
/each
/each
/each
/each
/each
/each
/each
/each
/each
1.00 note
1.00 note
/note
3.00 each
3.00 each
/each
Roof Glulams
RADIUS IS NOT GIVEN- ALL
MEASUREMENT APPROX.
VERIFY
Arched GL Beam
5-1/8"x12"x14'-0" R= 22'-0"(inside)
Chord=12'-9"
Nail Base Insulation
Total
Material Cost
AMT
AMT-Andy
Page 26
2/16/2014
Detailed Sample
Material
Class
Price Code
Description
Takeoff Quantity
Waste
Material Quantity
Material Price
Nail Base Insulation
Nail Base Insul.4'x8' Panel, 6-1/8"
Thick, 5-1/2" Ridgid+5/8" Pwd.
R25 (min)
4,767.00 sqft
-1
161.00 each
/each
366.00
48.00
18.00
22.00
each
each
each
each
/each
/each
/each
/each
32.00 each
32.00 each
/each
18.00 each
18.00 each
/each
14.00 each
14.00 each
/each
92.00 each
366.00 each
10.00 each
/each
/each
/each
1.00 each
1.00 each
/each
2.00 each
2.00 each
/each
2.00 each
/each
94.00 each
/each
06111.79
Roof Hdwr
Roof Fasteners
Timberlock Screws-4"
Timberlock Screws-6"
Timberlock Screws-8"
Through Bolt With Nut /Washer1/2"x4"
Through Bolt With Nut /Washer1/2"x6"
Through Bolt With Nut /Washer3/4"x8"
366.00
48.00
18.00
22.00
each
each
each
each
Roof Framing Hardware
Simpson LSSU210 Slope/Skew
Face Mount Joist Hanger
Simpson H5 Hurricane Tie
Simpson PSCL 5/8" "H" Clips
Simpson LSSU125 Variable Slope
Joist Hanger (1-3/4" wide)
Simpson LSSU410 Variable Slope
Seat Hanger (2) LVL 3-1/2"
Simp. HUS410 14" LVL Double
Face Mount Hanger
92.00 each
5,569.30 sqft
10.00 each
5
06111.98
Back Out
Backout/Int. Frame Detail
4x8x3/4" CD Pwd Electrical Panel
Backer-FRT
2x4x16 Sleeper 16" OC @
Hardwood Floor Areas
64.00 sqft
1,812.00 sqft
10
Total
Material Cost
AMT
AMT-Andy
Page 27
2/16/2014
Detailed Sample
Material
Class
Price Code
Description
Takeoff Quantity
Waste
Material Quantity
Material Price
Backout/Int. Frame Detail
2x8x12 Treated Blocking
1-3/4"x5-1/2"x10'-0" LVL Struct.
Jamb
1-3/4"x5-1/2"x16'-0" LVL Struct.
Jamb
1-3/4"x5-1/2"x17'-0" LVL Struct.
Jamb
2x4x16 Plate
2x6x16 Plate
2x6x20 Ceiling/Soffit Frame
5.00 each
3.00 each
5.00 each
3.00 each
/each
/each
1.00 each
1.00 each
/each
4.00 each
4.00 each
/each
11.36 each
26.37 each
15.37 each
12.00 each
27.00 each
16.00 each
/each
/each
/each
1.00 note
1.00 note
/note
4.00 each
/each
4.00
4.00
4.00
8.00
each
each
each
each
/each
/each
/each
/each
1.00 note
6.00 each
1.00 note
6.00 each
/note
/each
4.00 each
4.00 each
/each
12.00 each
12.00 each
/each
1.00 note
100.00 each
1.00 note
100.00 each
/note
/each
06111.99
Int Stairs
Interior Stair Framing
NO SPEC @ LOWER STAIR
FRAME TYP.
4x8x3/4" CDX Sub-Tread and
Riser Stock
2x10x8 Flr Joist
2x10x10 Flr Joist
1-3/4"x11-7/8"x6' LVL Stringer
1-3/4"x11-7/8"x9' LVL Stringer
118.92 sqft
4.00
4.00
4.00
8.00
each
each
each
each
Interior Stair Hardware
NO SPEC @ HARDWARE TYP.
Simpson LSU26 Face Mount
Slope/Skew Hanger
Simpson LUS210 Face Mount
Joist Hanger
Simpson LSTA24 Strap Tie
06220.06
Ext. Trim
Exterior Trim Materials
Trim Species is Cedar Typ.
Timberlok Screws 8"
Total
Material Cost
AMT
AMT-Andy
Page 28
2/16/2014
Detailed Sample
Material
Class
Price Code
Description
Takeoff Quantity
Waste
Material Quantity
Material Price
Exterior Trim Materials
1x10 R/L PT Blocking @ Steel
Channel
2x4 R/L Blocking @ Roller Shade
3x 2-5/8" Sill Blocking @ Nail
Base Panel
2x6 T&G Soffit DF Wire Brush
Tex. 1/8"x1/8" Joint Reveal
Fascia Board-2x10 STK Cedar
Window and Door Trim-3x3
Corner Boards-2x6-VERIFY @
Vert Siding
Corner Boards-2x6-Per Detail @
Horz Siding-Mitered Corners Per
Elevation Note
Garage Dr Jamb-1x6x10
Garage Dr Jamb-1x6x20
Garage Dr Jamb-1x10x8
Garage Dr Jamb-1x10x20
57.39 lnft
58.00 lnft
/lnft
129.00 lnft
159.26 lnft
130.00 lnft
160.00 lnft
/lnft
/lnft
83.18 sqft
10
220.00 lnft
/lnft
520.00 lnft
334.18 lnft
144.46 lnft
10
10
10
572.00 lnft
368.00 lnft
160.00 lnft
/lnft
/lnft
/lnft
53.76 lnft
10
60.00 lnft
/lnft
2.00
1.00
2.00
1.00
each
each
each
each
2.00
1.00
2.00
1.00
each
each
each
each
/each
/each
/each
/each
1.00 note
1.00 note
/note
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
/each
/each
/each
/each
Exterior Trim Timber
Non-Structural Exterior TimberMilled to Accept Steel Beam @
Gables
8x12x12 Beam End Stock
8x12x14 Beam End Stock
8x14x14 Beam End Stock
8x14x20 Beam End Stock
each
each
each
each
each
each
each
each
Sheet Metal Flashing/Trim
Masonry Ledge Flashing
Window Head Flashing @
Channel Steel
Window Head Flashing @ 3x3
Wood
Copper Flashing @ Timber
Flexible Flashings
129.62 lnft
219.00 lnft
130.00 lnft
220.00 lnft
/lnft
/lnft
14.09 lnft
16.00 lnft
/lnft
64.11 lnft
66.00 lnft
/lnft
Total
Material Cost
AMT
AMT-Andy
Page 29
2/16/2014
Detailed Sample
Material
Class
Price Code
Description
Takeoff Quantity
Waste
Material Quantity
Material Price
Flexible Flashings
Self Adhesive Bituthene Window
FlashingSelf Adhesive Bituthene- 8" Width
@ Panel Base
817.52 lnft
10
900.00 lnft
/lnft
291.53 lnft
10
322.00 lnft
/lnft
689.41 sqft
10
1,026.00 lnft
/lnft
1,249.55 sqft
10
2,400.00 lnft
/lnft
06220.10
Siding
Siding
Siding/Horizontal-8-7/8" Exposed1x10 Channel Rustic Cedar w/
1/4" Reveal
Vertical Siding-6-7/8" Face 1x8
Shiplap Cedar No Reveal (Scaled)
Nail Base Insulation
Nail Base Insul. 4'x8' Panel 2-5/8"
Thick, 2" Ridgid+5/8" Pwd , R10
(min)
Nail Base Insul. 3-1/8" Thick,
2-1/2" Ridgid+5/8" PT Pwd, R12.5
4,269.84 sqft
134.00 each
/each
829.72 sqft
830.00 sqft
/sqft
4,600.00 sqft
1,940.00 sqft
4,600.00 sqft
1,940.00 sqft
/sqft
/sqft
1.00
10.00
5.00
10.00
1.00
1.00
1.00
10.00
5.00
10.00
1.00
1.00
/note
/each
/each
/each
/each
/each
Building Insulation
SF Building Wrap-Tyvek
Homeslicker w/ Typar
06220.15
Int Timber
Non-Struc Interior Timber
Scaled Where Visable NO SPEC
6x8x8 Rafter
6x8x12 Rafter
6x8x16 Rafter
6x8x18 Rafter
6x8x20 Rafter
06220.16
Int Trim
Stone Veneer
note
each
each
each
each
each
note
each
each
each
each
each
Total
Material Cost
AMT
AMT-Andy
Page 30
2/16/2014
Detailed Sample
Material
Class
Price Code
Description
Takeoff Quantity
Waste
Material Quantity
Material Price
Stone Veneer
Stone Veneer Assembly
SF(Interior)
279.21 sqft
10
54.00 sqft
10
308.00 sqft
/sqft
Interior Trim Materials
4x8x1/4" Veneer Plywood @
Roller Shades
1x10 Beam Wrap
1x12 Beam Wrap
Wood Wall-Reclaimed Wood
Siding-Verticle
1x6 T&G R/L Ceiling Boards
1x6-9/16" Jamb Stock
67.11 lnft
87.83 lnft
396.23 sqft
2.00 each
/each
68.00 lnft
88.00 lnft
436.00 sqft
/lnft
/lnft
/sqft
3,026.00 lnft
58.00 lnft
/lnft
/lnft
196.00 lnft
640.00 lnft
/lnft
/lnft
21.52 lnft
22.00 lnft
/lnft
1,599.51 lnft
1,600.00 lnft
/lnft
1,145.65 sqft
57.56 lnft
10
10
0622B- Int
Baseboard
Interior Base Board
Lnft of Baseboard-Rubber
Lnft of Baseboard-Wood
5/8"x5-1/4" w/ 1/4" Reveal 1/4"
From Upper Edge
Lnft of Baseboard- Master Bdrm
Storage Area (wood Framed
Walls)
195.95 lnft
580.63 lnft
10
0622C-Int
Casing
Interior Casing
Casing 3/4"x2-1/4" w/ 1/4" Reveal
1/4" From Outside Edge
Casing 3/4"x3-1/2"
Casing 4/4x6 Roller Shade Trim
Casing 4/4x8 Custom Sill
Casing 4/4x12" Custom
Extension Jamb
189.10
78.67
8.00
76.52
lnft
lnft
lnft
lnft
190.00
80.00
8.00
78.00
lnft
lnft
lnft
lnft
/lnft
/lnft
/lnft
/lnft
Total
Material Cost
AMT
AMT-Andy
Page 31
2/16/2014
Detailed Sample
Material
Class
Price Code
Description
Takeoff Quantity
Waste
Material Quantity
Material Price
Total
Material Cost
06430
Stairs/Raili
ng
Wood Stairs and Railings
VERIFY TREAD SPECIES-Match
Wood Flooring
Stair Landing 3"x12"x10'-0" (NO
SPEC)
Stair Tread 4'-0" 3"x12" Timber
1.00 note
1.00 note
/note
5.00 each
5.00 each
/each
17.00 each
17.00 each
/each
07210
Insul.
Building Insulation
Vapor Barrier- " Membrane" By
Certainteed
Foundation Furring Wall
Insulation-Cellulose or Closed Cell
Poly
6-1/4"x15" R19 F G Ext Wall
Insulation @ Garage Common
and Storage Walls
Exterior Wall Insulation -Cellulose
or Closed Cell Poly
R50 FG Insulation @ Floor
Insulation @ Ceiling-Cellulose or
Closed Cell Poly
Cellulose or Poly Interior Wall
Insulation
2" Ridgid Exterior Foundation
Insulation-R-10
4" Ridgid Insulation R-20 Under
Slab
2" Ridgid Insul. 60 PSI High
Compresive, Own.Cor.- Formular
600
4,666.40 sqft
4,668.00 sqft
/sqft
1,043.29 sqft
1,043.29 sqft
/sqft
537.96 sqft
537.96 sqft
/sqft
4,666.40 sqft
4,668.00 sqft
/sqft
2,492.26 sqft
2,318.41 sqft
2,494.00 sqft
2,320.00 sqft
/sqft
/sqft
4,710.00 sqft
4,710.00 sqft
0.00
/sqft
0
578.00 sqft
0.00
/sqft
0
548.65 sqft
5
2,322.94 sqft
2,324.00 sqft
/sqft
396.75 sqft
398.00 sqft
/sqft
AMT
AMT-Andy
Page 32
2/16/2014
Detailed Sample
Material
Class
Price Code
Description
Takeoff Quantity
Waste
Material Quantity
Material Price
07300
Roofing
Shingle Roofing
Shingle RoofingCertainteed
Presidential Shake
Felt Paper Underlayment #30 Lb
Ice and Water Guard -Full
Coverage -SF
Ridge Shingles
Eave Shingles
Rake Shingles
2,345.42 sqft
5
25.00 Sq
/Sq
5,229.53 sqft
5,046.00 sqft
10
5
58.00 Sq
53.00 Sq
/Sq
/Sq
110.93 lnft
98.00 lnft
115.00 lnft
5
5
5
5.00 bndl
2.00 bndl
2.00 bndl
/bndl
/bndl
/bndl
1,034.00 sqft
/sqft
Membrane Roofing
Membrane Roofing VERIFY @
Waterproof Deck
1,033.89 sqft
Sheet Metal Roofing
Metal Roofing- Corregated Cold
Rolled 7/8" 24 Ga.
Lnft Of Metal Ridge
Lnft Of Metal Eave
Lnft Of Metal Rake
3,014.56 sqft
5
3,166.00 sqft
/sqft
30.21 lnft
150.00 lnft
157.00 lnft
5
5
5
32.00 lnft
158.00 lnft
166.00 lnft
/lnft
/lnft
/lnft
62.00 lnft
99.03 lnft
120.00 lnft
/lnft
/lnft
/lnft
40.00 sht
/sht
301.00 sht
/sht
07710
Manuf.Rf
Spec.
Manuf. Roof Specialties
5" Round Corten Gutter
3" Downspout
Buried Downspout to Grade
(20'-0" per )
60.98 lnft
99.03 lnft
120.00 lnft
0925 Gyp
Board
Gypsum Board
3'x5'x1/2" Cementitious Backer
Board -Wall
4x12x5/8" Gyp Board
568.66 sqft
14,438.05 sqft
5
Total
Material Cost
AMT
AMT-Andy
Page 33
2/16/2014
Detailed Sample
Material
Class
Price Code
Description
Takeoff Quantity
Waste
Material Quantity
Material Price
Gypsum Board
4x12x5/8" Gyp Board -Quiet
Roock-OPtional @ Master
Bedroom Ceiling
4x12x5/8" Type X Gyp Board
4x12x5/8" MR Gyp Board
874.20 sqft
19.00 sht
/sht
2,426.14 sqft
1,212.75 sqft
51.00 sht
26.00 sht
/sht
/sht
37.27 sqft
167.93 sqft
32.39 sqft
38.00 sqft
168.00 sqft
34.00 sqft
/sqft
/sqft
/sqft
10.50 sqft
12.00 sqft
/sqft
36.63 sqft
10.50 sqft
38.00 sqft
12.00 sqft
/sqft
/sqft
4.50 sqft
6.00 sqft
/sqft
36.63 sqft
10.50 sqft
38.00 sqft
12.00 sqft
/sqft
/sqft
4.50 sqft
6.00 sqft
/sqft
27.64 sqft
12.00 sqft
28.00 sqft
12.00 sqft
/sqft
/sqft
4.50 sqft
6.00 sqft
/sqft
50.00 lnft
/lnft
0930.F Tile
Floor
Ceramic Tile-Floors
Floor Tile-Laundy Room (17)
Floor Tile -Master Bathroom (26)
Floor Tile-Master Shower Floor
(126)
Floor Tile-Master Shower
Benchtop
Floor Tile-Bath #4 (93)
Floor Tile-Shower Floor Bath #4
(93)
Floor Tile Shower Benchtop Bath
#4 (93)
Floor Tile-Bath #3 (94)
Floor Tile-Shower Floor Bath #3
(94)
Floor Tile Shower Benchtop Bath
#3 (94)
Floor Tile-Bath #2 (100)
Floor Tile-Shower Floor Bath #2
(100)
Floor Tile Shower Benchtop Bath
#2 (100)
0930.WTile Wall
Ceramic Tile-Walls
Tile Base-Master Bath
46.73 lnft
5
Total
Material Cost
AMT
AMT-Andy
Page 34
2/16/2014
Detailed Sample
Material
Class
Price Code
Description
Takeoff Quantity
Waste
Material Quantity
Material Price
Total
Material Cost
Ceramic Tile-Walls
Tile Base-Bath 2
Tile Base-Bath 3
Tile Base-Bath 4
Tile-Wall Master Shower/Tub(126)
Tile-Wall Bathroom #2 Shower
(100)
Tile-Wall Bathroom #3 Shower(94)
Tile-Wall Bathroom #4 Shower(93)
Tile-Wall Laudry
14.99
22.47
25.95
218.11
109.35
lnft
lnft
lnft
sqft
sqft
5
5
5
16.00
24.00
28.00
220.00
110.00
lnft
lnft
lnft
sqft
sqft
115.90 sqft
98.85 sqft
43.62 sqft
116.00 sqft
100.00 sqft
44.00 sqft
444.14 sqft
446.00 sqft
/lnft
/lnft
/lnft
/sqft
0.00 /sqft
0.00
0.00
/sqft
/sqft
/sqft
09330
Quarry
Tile FL
Quarry Tile-Floors
Flagstone Floor-Lower
Level/Stairs/Powder Room
/sqft
09340
Stone Slab
Marble Slab
VERIFY Slab Material-Thickness
Assumed 2-1/2" Typ.
Stone Slab @ Showr Seat Master
Bath 15-1/2"x7'-0"
Stone Slab @ Showr Seat Master
Bath 18"x7'-0"
Stone Slab @ Showr Seat Bath
#2 15-1/2"x3'-3"
Stone Slab @ Showr Seat Bath
#2 18"x3'-3"
Stone Slab @ Showr Seat Bath
#3 15-1/2"x3'-0"
Stone Slab @ Showr Seat Bath
#3 18"x3'-0"
1.00 note
1.00 note
/note
each
each
/each
1.00 each
1.00 each
/each
1.00 each
1.00 each
/each
1.00 each
1.00 each
/each
1.00 each
1.00 each
/each
1.00 each
1.00 each
/each
0
0
0
AMT
AMT-Andy
Page 35
2/16/2014
Detailed Sample
Material
Class
Price Code
Description
Takeoff Quantity
Waste
Material Quantity
Material Price
Marble Slab
Stone Slab @ Showr Seat Bath
#4 15-1/2"x3'-0"
Stone Slab @ Showr Seat Bath
#4 18"x3'-0"
1.00 each
1.00 each
/each
1.00 each
1.00 each
/each
0963
Undecided
Flr
Undecided Finished Floor
Master Bedroom Storage Room
226.44 sqft
228.00 sqft
/sqft
0964
Wood
Flooring
Wood Strip Flooring
Perimeter Cabinet SF RemovedIsland Cabinet SF Included
SF Flooring
1.00 note
1,812.00 sqft
1.00 note
5
1,904.00 sqft
/note
/sqft
0968
Carpet
Carpet
Carpet Bedroom #2 (44)
Carpet Bedroom #3 (94)
Carpet Bedroom #4 (48)
188.00 sqft
212.00 sqft
192.00 sqft
21.00 sqyd
24.00 sqyd
22.00 sqyd
/sqyd
/sqyd
/sqyd
1.00 note
/note
10185
Bath
Access.
Shower Drs
7'-0" Height Assumed- Doors Are
2'-2" wide (scaled)
Glass Shower Door With Fixed
Panels Bath 2
Glass Shower Door With Fixed
Panels Bath 3
1.00 note
38.50 sqft
5,544.00 SI
/SI
35.00 sqft
5,040.00 SI
/SI
Total
Material Cost
AMT
AMT-Andy
Page 36
2/16/2014
Detailed Sample
Material
Class
Price Code
Description
Takeoff Quantity
Waste
Material Quantity
Material Price
Shower Drs
Glass Shower Door With Fixed
Panels Bath 4
Glass Shower Door With Fixed
Panels Master Bath
35.00 sqft
5,040.00 SI
/SI
66.50 sqft
9,576.00 SI
/SI
Total
Material Cost