CEED - Karnataka Power Corporation Limited

ANNEXURE-A
KARNATAKA POWER CORPORATION LIMITED
List of Files - Name of the Office : CE(ED)/SEE-1/EE-1
Address: Chief Engineer (Elec. Designs), 'Sudarshan Complex', 3rd Floor, No.22/23, Sheshadri Road, BANGALORE-560 009.
Date of
transfer of
Nature of
Closing date
Sl
Opening
file &
file
File No.
Subject
of file/
Remarks
No.
date of file
authority
Permanent/
Running file
whom
Temporary
transferred
1
LOPO/AC
Maintenance of Air-conditioner’s
Aug-2005
Running file
-
Permanent
Running file
2
LO/UPS
Maintenance of UPS systems
May- 2013
Running file
-
Permanent
Running file
3
LO/DG
Permanent
Running file
4
LO/ EPABX
5
LO/ Ricoh/
6
LO/Maint
7
Maintenance of Diesel-Sets at
Sudarshan Complex & Trade
Feb- 2008
Centre.
Maintenance of 3Nos EPABX /
5Nos of Hybrid 308 EPABX
Nov- 2011
/Telephone lines and spares
Maintenance of Ricoh make photo
June-2008
copier & Fax M/c’s
Maintenance work
Nov -2010
Running file
-
Running file
-
Permanent
Running file
Running file
-
Permanent
Running file
Running file
-
Permanent
Closed
MAINTENANCE OF POWER SUPPLY – ILLUMINATION, COMMUNICATION SYSTEM AND D.G.SET AT BANGALORE BASED
OFFICE COMPLEX.
Maintenance of Ricoh Make
30.06.2006
LO/Ricoh Xerox
Permanent
Xerox Machine
Page 1 of 63
8
LO/AC Maint
Maintenance of Air Conditioners
23.08.2005
-
-
Permanent
9
LO/DG Maint
Maintenance of DG Sets at
Sudarshan Complex and Trade
Centre Building
23.02.2008
-
-
Permanent
10
LOA3E/Fax
Maintenance of Fax Machine
19.01.2005
-
-
Permanent
16.11.2005
-
-
Permanent
01.08.09
Running
-NIL-
Permanent
01.08.09
01.08.09
01.08.09
Running
Running
Running
-NIL-NIL-NIL-
Permanent
Permanent
Permanent
15
Maintenance of UPS Systems of
Bangalore Offices
ESTABLISHMENT CORRESPONDENCE
Transfer/Relief/duty
LOP1E1
report/deputation
LOP1K3
Medical Reimbursement
LOP1F1
Leave & Attendance Vol – I
LOP1F1
Leave & Attendance Vol – II
16
LOP1F1
Correspondence - Vol - I
01.08.09
Running
-NIL-
Permanent
17
LOP1F1
Correspondence - Vol - II
01.08.09
Running
-NIL-
Permanent
LOP1L
Training/Seminars/ ConferenceVol - I
Conference- Vol - II
Disciplinary Matters
Work Force
HTC
Work allocation
Uniform to Employees
Vehicle advance
Shift/Extra wages
Festival Advance Vol-I
09.07.09
Running
-NIL-
Permanent
Running
Running
Running
Running
Running
Running
Running
Running
Running
-NIL-NIL-NIL-NIL-NIL-NIL-NIL-NIL-NIL-
11
12
13
14
18
19
20
21
22
23
24
25
26
27
LAN/UPS
LOP1L
LOP3D1
LOP1C3
LOP1F3
LORO
LOP3C1
LOP1H2
LOP1K9
LOP1H3
09.07.09
10.01.95
09.01.04
10.11.88
16.11.99
10.01.01
30.05.02
01.12.04
21.10.04
Page 2 of 63
Permanent
Permanent
Permanent
Permanent
Permanent
Permanent
Permanent
Permanent
Permanent
28
29
30
31
LOP1H3
LOQ3F
LOA5D1
LOP1C1
Festival Advance Vol-II
Provident Fund
Repairs of Furniture
Promotion/Recruitment
Transport subsidy
21.10.04
17.07.97
09.01.89
07.08.07
32
LOPO/TS
33
34
35
36
37
LOA1D1
LOA1D1
LOP1K1
LOP1K1
LOA6B1
Telephone Bills – Vol-I
Telephone Bills – Vol-II
T.A.Bills, Vol-I
T.A.Bills, Vol-II
Journey Approval
Assets & Liabilities
16.05.08
16.05.08
07.05.09
07.05.09
25.03.08
38
LOPO/Gen
39
LOPO
40
LOA5B1
41
LOP1G
42
43
LOPO
LOP1H1
44
LOA5A
45
LOA5B1
46
LOA5B1
47
LOA5B/EA/TA
Emergent Advance/
Temp.Advance
48
LOW4/A2/ BG's
Releasing
Returning of BG's details
Vol I
07.01.07
09.01.02
Courier Receipts
Stationery/Computer
Consumables
Pay & Allowances/
Incentive/Increment
Miscellaneous
HBA Correspondence
Franking Machine
Correspondence
Imprest Office – Vol-I
Aug;2006
25.08.00
01.11.07
01.01.03
13.06.06
04.04.08
Imprest Office – Vol-II
04.04.08
08.04.99
-
10.12.08
Page 3 of 63
Running
Running
Running
Running
Running
-NIL-NIL-NIL-NIL-
Permanent
Permanent
Permanent
Permanent
-NIL-
Permanent
Running
Running
Running
Running
Running
Running
-NIL-NIL-NIL-NIL-NIL-
Permanent
Permanent
Permanent
Permanent
Permanent
-NIL-
Permanent
Running
Running
-NIL-
Permanent
-NIL-
Permanent
-NIL-
Permanent
-NIL-NIL-
Permanent
Permanent
-NIL-
Permanent
-NIL-
Permanent
-NIL-
Permanent
-NIL-
Permanent
-NIL-
Permanent
Running
Running
Running
Running
Running
Running
Running
Running
49
LOW4/A2/ BG's
Releasing
Returning of BG's details
Vol - II
-
10.12.08
Running
-NIL-
Permanent
50
LOW4/A2/ BG's
Reminders
BG's Reminders - Vol -I & II
08.12.08
Running
-NIL-
Permanent
Running
Running
-NIL-
Permanent
Running
Running
-NIL-
Permanent
2006
onwards
Running
-NIL-
Permanent
51
Original BG's files 1 to 8
52
BG 's Correspondence
53
LOAOE
Bank Guarantees &
Correspondence
IB,SD,performance, Advances,
Corporate etc., & EMD total 8
volumes
Bank Guarantees &
Correspondence
IB,SD,performance, Advances,
Corporate etc., & EMD total 8
volumes
MD's Circular, Memos, SR's - Vol
I & II
Page 4 of 63
KARNATAKA POWER CORPORATION LIMITED
List of Files - 2013-14
Name of the Office: CE(ED)/SEE-1/EE-2
Address: Chief Engineer (Elec. Designs), 'Sudarshan Complex', 3rd Floor, No.22/23, Sheshadri Road, BANGALORE-560 009
Date of
Nature of
Closing
transfer of file
Opening
file
date of file/
& authority
date of file
Permanent/
Running file
whom
Temporary
transferred
Sl
No.
File No.
Subject
1.
LOT14F4/A/ STAGE-II -Vol-I
VARAHI UGPH STAGE-II
(Varahi balance works)
June-2006
May-2007
-
Permanent
Closed
2.
LOT14F4/A/ STAGE-II -Vol - II
VARAHI UGPH STAGE-II
(Varahi erection works)
June- 2007
Jan- 2008
-
Permanent
Closed
3.
LOT14F4/A/ STAGE-II -Vol -III
VARAHI UGPH STAGEII(Varahi erection works)
Feb- 2008
Jan- 2009
-
Permanent
Closed
4.
LOT14F4/A/ STAGE-II -Vol - IV
VARAHI UGPH STAGEII(Varahi balance works)
Feb- 2009
Running file
-
Permanent
Running file
5.
INV(E)/ Shivasamudram VOL-I
Shivasamudram Seasonal
Power House – DPR
July-1995
May-2009
-
Permanent
Closed
6.
INV(E)/ Shivasamudram VOLII
Shivasamudram Seasonal
Power House – DPR
June-2009
Oct-2010
-
Permanent
Closed
Page 5 of 63
Remarks
7.
INV(E)/ Shivasamudram VOL- Shivasamudram Run of the
III
River Project – DPR
Nov-2010
Running file
-
Permanent
Running file
Ghtaprabha Right Bank
Aug- 2008
Canal Power House - DPR
Running file
-
Permanent
Running file
8.
INV(E)/ Ghataprabha
9.
INV(E)/Munirabad - Vol –I
Munirabad DPR
Sep-2006
Oct-2008
-
Permanent
Closed
10.
INV(E)/Munirabad - Vol –II
Munirabad DPR
Nov- 2008
Apr-2010
-
Permanent
Closed
11.
INV(E)/Munirabad - Vol –III
Munirabad -EPC
Sept-2010
Oct-2013
-
Permanent
Closed
12.
INV(E)/Munirabad - Vol –IV
Munirabad-EPC
Nov-2013
Running file
-
Permanent
Running file
13.
INV(E)/Gundia Vol-I
Gundia DPR
Sep-2004
June-2005
-
Permanent
Closed
14.
INV(E)/Gundia Vol-II
Gundia DPR
June-2005
June-2007
-
Permanent
Closed
15.
INV(E)/Gundia Vol-III
Gundia DPR
Sep- 2007
Apr- 2008
-
Permanent
Closed
16.
INV(E)/Gundia Vol-IV
Gundia DPR
May- 2008
Running file
-
Permanent
Running file
17.
INV(E)/Pumped storage
Kali & Sharavathy Pumped
June- 2008
Storage Scheme
Running file
-
Permanent
Running file
18.
INV(E)/Matrix Turbine
Running file
-
Permanent
Running file
Matrix type turbine
Sep- 2008
Page 6 of 63
KPCL/LIS/CON Vol –I
Invoices towards
Consultancy works for all
lift irrigation schemes of
KBJNL/WRD
Aug-1998
Mar-2005
-
Permanent
Closed
20.
KPCL/LIS/CON Vol –II
Invoices towards
Consultancy works for all
lift irrigation schemes of
KBJNL/WRD
April-2005
Running file
-
Permanent
Running file
21.
NPH/R.M & U/1 &3
Nagjhari renovation &
modernization works of Unit June- 2003
- 1& 3- Balance works
Mar-2007
-
Permanent
Closed
22.
NPH/R.M & U/1 &3
Nagjhari renovation &
modernization works of Unit
- 1& 3- Balance works
Apr- 2007
Jun-2012
-
Permanent
Closed
23.
NPH/R.M & U/1 &3
Nagjhari renovation &
modernization works of Unit
- 1& 3- Balance works
Jul-2012
Running file
Received from
Permanent
EE-9/Oct-2012
Running file
24.
LOT/NPH/R&M Vol - I
Refurbishment of Units 1&2
Apr-2011
Aug-2013
Received from
Permanent
EE-9/Oct-2012
Closed
25.
LOT/NPH/R&M Vol - II
Refurbishment of Units 1&2
Sep-2013
Running file
-
Permanent
Running file
26.
KPCL/UKP/LIS/ RajanKollur
Consultancy works for
Rajan Kollur LIS
Oct-2008
Running file
-
Permanent
Running file
19.
Page 7 of 63
27.
LOTI4A/T-OIL Vol-I
Procurement of Turbine
lubricating oil for all the
Hydel Projects
28.
LOTI4A/T-OIL Vol-II
Procurement of Turbine
lubricating oil for all the
Hydel Projects
June- 2008
Jul-2010
-
Permanent
Closed
29.
LOTI4A/T-OIL Vol-III
Procurement of Turbine
lubricating oil for all the
Hydel Projects
Aug-2010
Mar-2012
-
Permanent
Closed
30.
LOTI4A/T-OIL Vol-IV
Procurement of Turbine
lubricating oil for all the
Hydel Projects
Apr-2012
Aug-2013
-
Permanent
Closed
31.
LOTI4A/T-OIL Vol-V
Procurement of Turbine
lubricating oil for all the
Hydel Projects
Sept-2013
Running file
-
Permanent
Running file
Dec-2006
Running file
-
Permanent
Running file
June-2006
Running file
-
Permanent
Running file
32.
RAMAM/CON
33.
LOT17F1C2/ ADPH
Ramam Hydro Electric
Project-Turbine works
consultancy(Consultancy
works to NTPC)
BG's /corporate Guarantee
correspondence( Almatti
balance works)
July- 2005
June- 2008
-
Permanent
Closed
Page 8 of 63
34.
EE-2/SUPA
Procurement of Cross piece
to Supa Power House.
Aug-2000
Running file
35.
LOT/SPH/R&M
Refurbishment of Units-1 &
2
Aug-2012
Running file
36.
EE-2/
SPH/LPH/Kadra/Kodasalli
Kadra & Kodasalli -balance
works- Turbine & its
auxiliary works
correspondence
Oct-2009
Running file
-
Permanent
Running file
37.
NPH/MODEL TESTING
NPH Turbine Model Testing April-2006
Running file
-
Permanent
Running file
Feb-2011
Dec-2012
-
Permanent
Closed
Jan-2013
Mar-2014
-
Permanent
Closed
Apr-2014
Running file
-
Permanent
Running file
Feb-1998
July-2001
-
Permanent
Closed
38.
Lo/CEED/SGS Vol-I
39.
Lo/CEED/SGS Vol-II
40.
Lo/CEED/SGS Vol-III
41.
INV/MGHETRS
Procurement of TGB Shells,
Oil Rotating Sumps &
Chevron Packings for SGS
Units
Procurement of TGB
Shells, Oil Rotating Sumps
& Chevron Packings for
SGS Units
Procurement of TGB
Shells, Oil Rotating Sumps
& Chevron Packings for
SGS Units
MGHE Tail Race Scheme
Page 9 of 63
-
Permanent
Running file
Received from
Permanent
EE-9/Oct-2012
Running file
42.
43.
INV/MGHETRS
MGHE Tail Race Scheme
Mar-2012
Running file
-
Permanent
Running file
LOT/EE-2/Bhadra/R&M
R&M of 2X12MW RBUs of
BHEP-Turbine & its
auxiliaries
Oct-2012
Running file
-
Permanent
Running file
Page 10 of 63
KARNATAKA POWER CORPORATION LIMITED
List of Files - Name of the Office : CEED/SEE-1/EE – 3
Address : Chief Engineer, (Elec. Designs), No.22/23, 3rd Floor, Sudarshan Complex, Seshadri Road, Bangalore - 560009
SL.
NO.
FILE NAME
1
VHEP STAGE-II EPC
1
No. LOT12F4/A/ STAGE-II/
EE-3(Vol-1)
No. LOT12F4/A/ STAGE-II/
EE-3(Vol-2)
No. LOT12F4/A/ STAGE-II/
EE-3(Vol-3)
No. LOT12F4/A/ STAGE-II/
EE-3(Vol-4)
No. LOT12F4/A/ STAGE-II/
EE-3(Vol-5)
No. LOT12F4/A/ STAGE-II/
EE-3(Vol-6)
No. LOT12F4/A/ STAGE-II/
EE-3(Vol-7)
No. LOT12F4/A/ STAGE-II/
EE-3(Vol-8)
No. LOT12F4/A/ STAGE-II/
EE-3(Vol-9)
No. LOT12F4/A/ STAGE-II/
EE-3(Vol-10)
2
3
4
5
6
7
8
9
10
SUBJECT
GENERAL
CORRESPONDANCE
GENERAL
CORRESPONDANCE
GENERAL
CORRESPONDANCE
GENERAL
CORRESPONDANCE
GENERAL
CORRESPONDANCE
GENERAL
CORRESPONDANCE
GENERAL
CORRESPONDANCE
GENERAL
CORRESPONDANCE
GENERAL
CORRESPONDANCE
GENERAL
CORRESPONDANCE
Date of
Closing
transfer of file
Opening
date of file/
& authority
date of file
running file
whom
transferred
FEB '05
JAN '06
JAN '06
MAY '06
JUNE '06
AUG.'06
SEPT.'06
NOV.'06
DEC.'06
MARCH '07
APRIL '07
JULY '07
JUNE '07
OCT.'07
NOV.'07
JAN.'08
FEB.'08
MARCH '08
APRIL '08
JULY '08
Page 11 of 63
-
Nature of
file
permanent/
Temporary
Permanent
Permanent
Permanent
Permanent
Permanent
Permanent
Permanent
Permanent
Permanent
Permanent
Remarks
11
12
13
14
15
16
17
18
19
20
21
No. LOT12F4/A/ STAGE-II/
EE-3 (Vol-11)
No. LOT12F4/A/ STAGE-II/
EE-3(Vol-12)
No. LOT12F4/A/ STAGE-II/
EE-3(Vol-13)
No. LOT12F4/A/ STAGE-II/
EE-3(Vol-14)
No. LOT12F4/A/ STAGE-II/
EE-3(Vol-15)
No. LOT12F4/A/ STAGE-II/
EE-3(Vol-16)
No. LOT12F4/A/ STAGE-II/
EE-3(Vol-17)
No. LOT12F4/A/ STAGE-II/
EE-3(Vol-18)
No. LOT12F4/A/ STAGE-II/
EE-3(Vol-19)
No. LOT12F4/A/ STAGE-II/
EE-3(Vol-20)
No. LOT12F4/A/ STAGE-II/
EE-3(Vol-21)
No. LOT12F4/A/ STAGE-II
(Vol-1)
No. LOT12F4/A/ STAGE-II
(Vol-2)
No. LOT12F4/A/ STAGE-II
(Vol-3)
GENERAL
CORRESPONDANCE
GENERAL
CORRESPONDANCE
GENERAL
CORRESPONDANCE
GENERAL
CORRESPONDANCE
GENERAL
CORRESPONDANCE
GENERAL
CORRESPONDANCE
GENERAL
CORRESPONDANCE
GENERAL
CORRESPONDANCE
GENERAL
CORRESPONDANCE
GENERAL
CORRESPONDANCE
GENERAL
CORRESPONDANCE
PROGRESS REPORT
PROGRESS REPORT
PROGRESS REPORT
AUG.'08
OCT.'08
NOV.'08
DEC.'08
JAN.'09
MARCH. '09
APRIL.'09
JUNE'09
MAY'09
October’09
September’0
9
May’10
JUNE'10
March’11
April’11
Jan’12
Feb’12
May’13
June’13
Feb’14
Jan’14
Running
OCT.06
FEB '08
MARCH
'08
AUG.'08
AUG.'08
Page 12 of 63
NOV.'08
-
Permanent
Permanent
Permanent
Permanent
Permanent
Permanent
Permanent
Permanent
Permanent
Permanent
Permanent
Permanent
Permanent
Permanent
No. LOT12F4/A/ STAGE-II
(Vol-4)
No. LOT12F4/A/ STAGE-II
(Vol-1)
No. LOT12F4/A/ STAGE-II
(Vol-2)
No. LOT12F4/A/ STAGE-II
(Vol-3)
No. LOT12F4/A/ STAGE-II
(Vol-4)
No. LOT12F4/A/ STAGE-II
(Vol-1)
No. LOT12F4/A/ STAGE-II
(Vol-2)
No. LOT12F4/A/ STAGE-II
(Vol-3)
No. LOT12F4/A/ STAGE-II
(Vol-1)
No. LOT12F4/A/ STAGE-II
(Vol-2)
No. LOT12F4/A/ STAGE-II
(Vol-1)
PROGRESS REPORT
NOV.08
JAN.09
CONSOLIDATED
COMMENTS ON
DRAWINGS &
DOCUMENTS
CONSOLIDATED
COMMENTS ON
DRAWINGS &
DOCUMENTS
CONSOLIDATED
COMMENTS ON
DRAWINGS &
DOCUMENTS
CONSOLIDATED
COMMENTS ON
DRAWINGS &
DOCUMENTS
REPLY TO COMMENTS
FROM M/S.VATECH
REPLY TO COMMENTS
FROM M/S.VATECH
REPLY TO COMMENTS
FROM M/S.VATECH
COMMENTS FROM ALL
DIVISIONS
COMMENTS FROM ALL
DIVISIONS
INSPECTION LETTERS
AND REPORTS
OCT.06
NOV.'07
-
Permanent
Permanent
DEC.'07
MAY.'08
Permanent
JUNE '08
AUG.'08
Permanent
SEPT.'08
JUNE '09
Permanent
SEPT.'07
MARCH'08
APRIL '07
OCT.'07
SEPT.'08
DEC.'08
OCT.'07
MARCH '08
APRIL '08
OCT.'08
MARCH
'07
OCT.'08
Page 13 of 63
-
Permanent
Permanent
Permanent
Permanent
Permanent
Permanent
No. LOT12F4/A/ STAGE-II
(Vol-1)
No. LOT12F4/A/STAGE-II
(Vol-1)
No. LOT12F4/A/ STAGE-II
(Vol-2)
No. LOT12F4/A/ STAGE-II
(Vol-1)
No. LOT12F4/A/ STAGE-II
(Vol-2)
No. LOT12F4/A/ STAGE-II
(Vol-1)
No. LOT12F4/A/ STAGE-II
(Vol-1)
No. LOT12F4/A/ STAGE-II
(Vol-2)
No. LOT12F4/A/ STAGE-II
(Vol-3)
No. LOT12F4/A/ STAGE-II
(Vol-4)
No. LOT12F4/A/ STAGE-II
(Vol-1)
No. LOT12F4/A/ STAGE-II
(Vol-2)
No. LOT12F4/A/ STAGE-II
(Vol-3)
No. LOT12F4/A/ STAGE-II/
EE-3(Vol-1)
QAP
DEC'06
JAN '08
SUB VENDORS
DEC '06
AUG.'07
SUB VENDORS
SEPT.'07
NOV.'07
DESPATCH
INSTRUCTIONS
DESPATCH
INSTRUCTIONS
CIVIL APPROVED
DRAWINGS.
APPROVED
DRAWINGS(1-10)
APPROVED DRAWINGS
(11-22)
APPROVED DRAWINGS
(23-29)
APPROVED DRAWINGS
(30 ONWARDS)
APPROVED
DOCUMENTS (1-15)
APPROVED
DOCUMENTS (16-28)
APPROVED
DOCUMENTS (29
ONWARDS)
DRAWINGS(1-20)
MARCH'08
SEPT.'08
AUG'08
DEC'08
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Permanent
Permanent
Permanent
Permanent
Permanent
Permanent
Permanent
Permanent
Permanent
Permanent
Permanent
Permanent
Permanent
Page 14 of 63
-
-
Temporary
No. LOT12F4/A/ STAGE-II/
EE-3(Vol-2)
No. LOT12F4/A/ STAGE-II/
EE-3(Vol-3)
No. LOT12F4/A/ STAGE-II/
EE-3(Vol-4)
No. LOT12F4/A/ STAGE-II/
EE-3(Vol-5)
No. LOT12F4/A/ STAGE-II/
EE-3(Vol-6)
No. LOT12F4/A/ STAGE-II
(Vol-1)
No. LOT12F4/A/ STAGE-II
(Vol-2)
No. LOT12F4/A/ STAGE-II
(Vol-3)
No. LOT12F4/A/ STAGE-II
(Vol-4)
LOT12F4/A/STAGE-II/
AUX.TR.(Vol-1)
DRAWINGS(21-35)
DRAWINGS(36-46)
DRAWINGS(47-74)
DRAWINGS(75-104)
DRAWINGS(105-134)
DOCUMENTS(1-25)
DOCUMENTS(26-62)
DOCUMENTS(63-110)
DOCUMENTS(111-117)
2X2.5MVA AUXILIARY
TRANSFORMER FOR
VHEP-STAGE-II
LOT12F4/A/STAGE-II/
2X2.5MVA AUXILIARY
AUX.TR.(Vol-2)
TRANSFORMER FOR
VHEP-STAGE-II
LOT12F4/A/STAGE-II/ GTS
2X130MVA GENERATOR
TRANSFORMER FOR
VHEP-STAGE-II
LOT12F4/A/STAGE-II/ MDPH BALANCE R&M WORKS
OF MDPH.
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Oct-07
Jun-08
Jul-08
Sep-08
Temporary
Temporary
Temporary
Temporary
Temporary
Temporary
Temporary
Temporary
Temporary
Permanent
Permanent
Feb-08
Jan-09
Jan-09
Mar-10
Page 15 of 63
Permanent
-
Permanent
LOT12F4/A/STAGE-II/ MDPH BALANCE R&M WORKS
OF MDPH.
LOT12F4/A/STAGE-II/ MDPH BALANCE R&M WORKS
OF MDPH.
GENERATIONWRM/GEN
GENERATION RELATED
SUBJECTS.
WRM/GEN
GENERATION RELATED
SUBJECTS.
WRM/GEN
GENERATION RELATED
SUBJECTS.
WRM/GEN
GENERATION RELATED
SUBJECTS.
WRM/GEN
GENERATION RELATED
SUBJECTS.
WRM/GEN
GENERATION RELATED
SUBJECTS.
WRM/GEN
GENERATION RELATED
SUBJECTS.
SPRC
OCC MEETING DETAILS
SPRC
OCC MEETING DETAILS
SPRC
OCC MEETING DETAILS
SPRC
OCC MEETING DETAILS
SPRC
OCC MEETING DETAILS
SPRC
OCC MEETING DETAILS
SPRC
OCC MEETING DETAILS
SPRC
OCC MEETING DETAILS
SPRC
OCC MEETING DETAILS
SPRC
OCC MEETING DETAILS
SPRC
OCC MEETING DETAILS
April-10
June-11
July-11
Sept-13
April'09
Sept.'09
Oct.'09
March '10
April’10
March '11
April’11
March '12
April’12
March '13
April’13
March '14
Apr’14
Running
April '09
Oct.-09
April-09
June 10
Nov.-10
July.-11
Oct-11
Jan.-12
July.-12
Feb.-13
July.-13
Sept.'09
March'10
May'10
Oct'10
June'11
Sep'11
Jan'12
june'12
Jan'13
Jun'13
Oct'13
Page 16 of 63
-
Permanent
Permanent
-
Permanent
Permanent
Permanent
Permanent
Permanent
Permanent
Permanent
Permanent
Permanent
Permanent
Permanent
Permanent
Permanent
Permanent
Permanent
Permanent
Permanent
Permanent
SPRC
JOINT ENERGY METER
READINGS
JOINT ENERGY METER
READINGS
JOINT ENERGY METER
READINGS
JOINT ENERGY METER
READINGS
JOINT ENERGY METER
READINGS
JOINT ENERGY METER
READINGS
JOINT ENERGY METER
READINGS
JOINT ENERGY METER
READINGS
JOINT ENERGY METER
READINGS
JOINT ENERGY METER
READINGS
JOINT ENERGY METER
READINGS
OCC MEETING DETAILS
RECORD OF READINGS.
Nov.-13
Apr-09
Mar'14
oct'09
-
Running
-
Permanent
RECORD OF READINGS.
Nov.09
March'10
-
Permanent
RECORD OF READINGS.
April’10
Aug'10
-
Permanent
RECORD OF READINGS.
Sep’10
Dec'10
-
Permanent
RECORD OF READINGS.
Jan’11
July'11
-
Permanent
RECORD OF READINGS.
Aug.11
Dec'11
-
Permanent
RECORD OF READINGS.
Jan’12
July'12
-
Permanent
RECORD OF READINGS.
Aug.12
Dec'12
-
Permanent
RECORD OF READINGS.
Jan’13
July'13
-
Permanent
RECORD OF READINGS.
Aug.13
Dec'13
-
Permanent
RECORD OF READINGS.
Jan’13
Running
-
Permanent
-
Permanent
-
Permanent
Permanent
Permanent
-
Permanent
SRPC/RGMO
Feb’10
Oct’13
RTI
GENERAL
Running
GHATAPRABHA DAM RIGHT BANK CANAL POWER HOUSE(General)GHEP/GEN
GENERAL
March '10
April’11
GHEP/GEN
GENERAL
May '11
Dec’12
GHEP/GEN
GENERAL
Jan '13
Dec’13
GHEP/GEN
GENERAL
Jan'14
Page 17 of 63
Running
KARNATAKA POWER CORPORATION LIMITED
List of Files - Name of Office:SEE-2/EE-4 Division, updated on 15.05.2014
Address: Chief Engineer (Electrical Designs), 'Sudarshan Complex', 3rd Floor, No.22/23, Sheshadri Road, BANGALORE-560 009.
Sl No.
File no.
1
LOT/EE4/VUGPH U1&2/GOV
2
LOT/EE4/ADPH
3
LOT/EE4/NPH/EXC
4
LOT/EE4/SGS/GOV-Vol - I
5
LOT/EE4/SGS/GOV-Vol - II
6
LOT/EE4/SGS/GOV-Vol - III
7
LOT/EE4/SGS/GOV-Vol - IV
8
LOT/EE4/SGS/GOV-Vol - V
9
LOT/EE4/SGS/GOV-Vol - VI
Subject
VUGPH - Stage -1 ( Units
1&2) - Governors
ADPH- Generator &
Excitation
NPH- Excitation
SGS- Governor - New
requirement of spares &
TSLG Governors
SGS- Governor - New
requirement of spares &
TSLG Governors
SGS- Governor - New
requirement of spares &
TSLG Governors
SGS- Governor - New
requirement of spares &
TSLG Governors
SGS- Governor - New
requirement of spares &
TSLG Governors
SGS- Governor - New
requirement of spares &
TSLG Governors
Opening
date of file/
running file
Closing date of
file / running
file
Date of
transfer of file
& authority
whom
transferred
Nature of
file
permanent/
temporary
Remarks
May'07
-
-
Permanent
-
Jan'07
-
-
Permanent
-
Jun'06
-
-
Permanent
-
Apr'07
Jul'08
-
Permanent
-
Jul'08
Jul'09
-
Permanent
-
Apr'09
Nov’09
-
Permanent
-
Nov’09
Jan’11
-
Permanent
-
Feb’11
Mar’11
-
Permanent
-
Mar’11
Aug’11
-
Permanent
-
Page 18 of 63
10
LOT/EE4/SGS/GOV-Vol - VII
11
LOT/EE4/LPH/GOV- Vol - I
12
LOT/EE4/LPH/GOV - Vol - II
13
LOT/EE4/LPH/GOV- Vol - III
14
LOT/EE4/LPH/GOV-Vol - IV
15
LOT/EE4/LPH/GOV-Vol - V
16
LOT/EE4/LPH/EXC - Vol - I
17
LOT/EE4/NPH/EXC - Vol - II
18
LOT/EE4/Mallapur/ R&M
19
LOT/EE4/Bhadra
20
LOT12F4A/Stg-II
21
LOT/EE4/Progress report
SGS- Governor - New
requirement of spares &
TSLG Governors
Linganamakki Power
House- Governors (VA
TECH)
Linganamakki Power
House- Governors (VA
TECH)
Linganamakki Power
House- Governors (VA
TECH)
Linganamakki Power
House- Governors (VA
TECH)
Linganamakki Power
House- Governors (VA
TECH)
Linganamakki Power
House- Excitation system
(ABB)
Sept’11
-
-
Permanent
-
Dec'06
Mar'07
-
Permanent
-
Apr'07
Mar'08
-
Permanent
-
Mar'08
Sep'08
-
Permanent
-
Sep'08
Feb’14
-
Permanent
-
Feb’14
-
-
Permanent
-
May'07
-
-
Permanent
-
NPH- Governors
Jun'06
-
-
Permanent
-
Mallapur Mini hydel - R&M
Nov'08
-
-
Permanent
-
Feb'08
-
-
Permanent
-
Jun'08
Oct'09
-
Permanent
-
Dec'06
-
-
Permanent
-
Bhadra Power house Governors
Varahi Stg-II Battery
Charger
Progress report
Page 19 of 63
22
LOT/EE4/O&M
O&M of all Power houses
Dec'06
-
-
Permanent
-
23
LOT/EE4/General Vol-14A
General file
Dec'06
July’10
-
Permanent
-
24
LOT/EE4/General Vol-14B
General file
July’10
May’12
-
Permanent
-
25
LOT/EE4/General Vol-15
General file
June’12
-
-
Permanent
-
26
LOT/EE-4/Tech Particulars
27
LOT/EE4/VUGPH STG
II/MDPH
28
LOT/EE4/VUGPH STG II/
29
LOT/EE4/Gerusoppa
30
31
32
33
34
35
LOT/EE4/Rammam
LOT/EE4/VUGPH STG
II/EXC - Vol - I
LOT/EE4/VUGPH STG
II/EXC - Vol - II
LOT/EE4/VUGPH U1&2/EXC
- Vol - I
LOT/EE4/VUGPH U1&2/EXC
- Vol - II
LOT/EE4/VUGPH U1&2/EXC
- Vol - III
Priority of technical
particulars
Varahi Stage-II - ManiDam -(EPC) GOV & EXC
Varahi- Stage- II - Units
3&4 -GOV (EPC)
-
-
-
Permanent
-
Dec'06
-
-
Permanent
-
Apr'07
-
-
Permanent
-
Gerusoppa power house
Feb'07
-
-
Permanent
-
-
-
Permanent
-
May'07
-
-
Permanent
-
Dec'06
May'07
-
Permanent
-
Apr'07
Apr'08
-
Permanent
-
Apr'08
Apr'09
-
Permanent
-
Apr'09
-
-
Permanent
-
Rammam Hydro Electric
Project - Stage-III
(3x40MW)
Varahi Stage- II- Units
3&4 -Excitation system
Varahi Stage- II- Units
3&4 -Excitation system
Varahi Stage- I- Units 1&2
-Excitation system
Varahi Stage- I- Units 1&2
-Excitation system
Varahi Stage- I- Units 1&2
-Excitation system
Page 20 of 63
36
LOT/BAT CHRGR/ VUGPH Vol - I
Battery & Battery chargers
of VUGPH, ODY & MDPH
37
LOT/BAT CHRGR / VUGPH
– Vol- II
38
LOT/WE/Kh-EXT/45-2
39
LOT/EE4/SGS/GOV/ Spares
40
LOT/BTPS& RPCL/LIFT Vol-I
Battery & Battery chargers
of VUGPH, ODY & MDPH
Kappatagudda WF-O&M of
11nos M/cs of Enercon
make
SGS-Procurement of
Hydraulic spares for
Governors
LIFTS- for Bellary & RPCL
quarters
41
LOT/BTPS& RPCL/LIFT VolII
LIFTS- for Bellary & RPCL
quarters
LOT/BTPS& RPCL/LIFT VolIII
LOT/BTPS& RPCL/LIFT VolIV
LOT/BTPS Township/LIFT
Vol-5
LIFTS- for Bellary & RPCL
quarters
LIFTS- for Bellary & RPCL
quarters
42
43
44
45
46
47
48
LOT/BTPS Township/LIFT
Vol-6
LOT/BTPS Township/LIFT
Vol-7
LOT/BTPS Township/LIFT
Vol-8
LOT/RPCL/LIFT Vol-5
Dec'08
Sep'09
-
Permanent
-
Sep'09
-
-
Permanent
-
Jan'09
-
-
Permanent
-
Jan'10
-
-
Permanent
-
Oct'09
Sep’11
-
Permanent
-
Sep'11
Sep’11
-
Permanent
-
Sep'11
Jan’12
-
Permanent
-
Oct'11
Dec’11
-
Permanent
-
LIFTS- for Bellary quarters
Jan’12
Dec’12
-
Permanent
-
LIFTS- for Bellary quarters
Jan’13
May’13
-
Permanent
-
LIFTS- for Bellary quarters
May’13
Apr’14
Permanent
-
LIFTS- for Bellary quarters
May’14
-
Permanent
-
LIFTS- for RPCL quarters
Jan’12
Mar’14
Permanent
-
Page 21 of 63
-
49
LOT/RPCL/LIFT Vol-6
50
LOT/EE4/SRPC/MISC Vol-1
51
LOT/EE4/SRPC/MISC Vol-2
52
LOT/EE4/SRPC/MISC Vol-3
53
LOT/EE4/SRPC/MISC Vol-4
54
LOT/EE4/SRPC/BHEL/ Vol-5
55
LOT/EE4/SRPC/BHEL/ Vol-6
56
LOT/EE4/SRPC/BHEL/ Vol-7
57
LOT/EE4/SRPC/Andritz Vol-1
LIFTS- for RPCL quarters
Restricted Governing
mode operation of Hydro
units of KPCL
Restricted Governing
mode operation of Hydro
units supplied by M/s
BHEL
Restricted Governing
mode operation of Hydro
units supplied by M/s
BHEL
Restricted Governing
mode operation of Hydro
units supplied by M/s
BHEL
Restricted Governing
mode operation of Hydro
units supplied by M/s
BHEL
Restricted Governing
mode operation of Hydro
units supplied by M/s
BHEL
Restricted Governing
mode operation of Hydro
units supplied by M/s
BHEL
Restricted Governing
mode operation of Hydro
units supplied by M/s
Apr’14
-
-
Permanent
-
Feb'10
Dec’10
-
Permanent
-
Dec'10
Mar’11
-
Permanent
-
Apr'11
Jul’11
-
Permanent
-
Aug'11
Aug’12
-
Permanent
-
Sept’12
Apr’13
-
Permanent
-
Apr’13
Feb’14
-
Permanent
-
Mar’14
-
-
Permanent
-
Jul'11
Sept’13
-
Permanent
-
Page 22 of 63
ANDRITZ
58
LOT/EE4/SRPC/Andritz Vol2
59
LOT/GDPH/Exc- Vol-I
60
LOT/GDPH/Exc- Vol-II
61
LOT/GDPH/Exc- Vol-III
62
63
64
65
LOT/EE4/New Projects
LOT/EE4/New Projects
LO/WE/KG/ADD 2 UNITS Vol - I
LO/WE/KG/ADD 2 UNITS Vol - II
66
LO/WE/KG-EXT-45-2
67
LO/WE/KG-EXT-45-3
Restricted Governing
mode operation of Hydro
units supplied by M/s
ANDRITZ
Procurement of static
excitation system for 2
units of GDPH from M/s
Andritz
Procurement of static
excitation system for 2
units of GDPH from M/s
Andritz
Procurement of static
excitation system for 2
units of GDPH from M/s
Andritz
New projectsGRBC(2x10MW)
New projects- Munirabad
additional unit
KGWF Additional units Vol 1 & Vol 2
KGWF Additional units Vol 1 & Vol 2
KGWF - 2.5 MW Extn of
Wind Energy Project
KGWF - General File
Oct’13
-
Permanent
Mar’10
Dec’10
-
Permanent
-
Jan’11
Apr’12
-
Permanent
-
May’12
-
-
Permanent
-
Jan'10
-
-
Permanent
-
Jan'10
-
-
Permanent
-
Feb'02
May'05
-
Permanent
Jun'05
Oct'08
-
Permanent
-
Dec'03
Feb'06
-
Permanent
-
May'06
-
-
Permanent
-
Page 23 of 63
68
LOT/EE4/Gundia HEP
69
LOT/Shivasamudram/R&M/G
ov
70
LOT/EE-4/Rammnam
71
LOT17H&B/ADPH/ LIFT
72
LOT17/F1C1/ADPH/ BC
73
LOT4H6B1
74
LO/WE/KG-EXT-45-2 - Vol - I
75
76
77
LO/WE/KG-EXT-45-2 - Vol II
LO/WE/KG-EXT-45-2 - Vol III
LO/WSS/KREDL
Gundia Hydro Electric
Project - Tech Spec
Shivasamudram Hydro
Electric Project - Tech
spec
Rammam Hydro Electric
Project - Battery & Battery
charger Spec
-
-
-
Permanent
-
Jul'09
-
-
Permanent
-
2006-07
-
-
Permanent
-
ADPH- LIFTS
Jul'03
Mar'05
-
Permanent
-
ADPH- Battery Charger
Nov'02
Mar'06
-
Permanent
-
Aug'99
Apr'06
-
Permanent
-
Feb'03
Feb'04
-
Permanent
Jul'02
Feb'03
-
Permanent
-
May'02
Jul'02
-
Permanent
-
May'04
12-10-2011
Transferred
to CE(GSW)
Permanent
-
Nov’08
Handed over
to SE(E)RO
on
08.04.2010
Permanent
-
Gerusoppa- Battery
Charger
2.5 MW Extn of Wind
Project
2.5 MW Extn of Wind
Project
2.5 MW Extn of Wind
Project
KSCST payment towards
wind measurement at
Chitradurga Hills
78
LOT/EE4/Mallapur/ R&M
Mallapur Mini hydel - R&M
Dec'06
79
LOT/EE4/SGS U#1-5/RGMO
SGS- Units # 1 to 5 –
Implementation of RGMO
Apr’11
Page 24 of 63
Permanent
80
LOT/EE4/SGS U#610/RGMO
81
LOT/EE4/SRPC/RGMO
82
LOT/EE4/Bhadra RB/Gov/
Vol-1
83
LOT/EE4/Bhadra RB/Gov/
Vol-2
84
LOT/EE4/Bhadra RB/Gov/
Vol-3
85
LOT/Bhadra RB/Exc/ Vol-1
86
LOT/MGHE-M’bad/RGMO/
Vol-1
SGS- Units 6 to 10 Implementation of RGMO
by replacement of existing
DIGIPID-02 Governors
with TSLG Governors
ADPH – Implementation of
RGMO
Bhadra River Bed Units –
Replacement of old
Governors with digital
governor & Implementation
of RGMO
Bhadra River Bed Units –
Replacement of old
Governors with digital
governor & Implementation
of RGMO
Bhadra River Bed Units –
Replacement of old
Governors with digital
governor & Implementation
of RGMO
Bhadra River Bed Units –
Replacement of Excitation
System
MGHE & Munirabad Replacement of existing
DTl-595 Governors with
latest AK-1703 digital
governors &
Implementation of RGMO
Nov’12
Permanent
Jun’10
-
-
Permanent
-
Dec‘11
Apr’13
-
Permanent
-
May’13
Apr’14
-
Permanent
-
May‘14
-
-
Permanent
-
Dec’11
-
-
Permanent
-
Dec’11
Feb’14
-
Permanent
-
Page 25 of 63
87
LOT/MGHE-M’bad/RGMO/
Vol-2
MGHE & Munirabad Replacement of existing
DTl-595 Governors with
latest AK-1703 digital
governors &
Implementation of RGMO
Mar’14
Page 26 of 63
-
-
Permanent
-
List of Files Name of Office: CE ED/SE(E)-2/EE(E)-5.
Address: Chief Engineer(Electrical Designs), 'Sudarshan Complex', 3rd Floor, No.22/23, Sheshadri Road, BANGALORE-560 009.
Sl
No.
I.
File No.
Subject
Opening
Date of
File
Closing Date
of
File/Running
File
Date of
Transfer of
File &
Authority
whom
transferred
Nature of
File
Permanent/
Temporary
23.5.06
Running
-
Permanent
KPCL PROJECTS
1
Varahi stage-II-Generators
Supply , Erection, Testing
and commissioning of
generators
2
Varahi stage-II-LTAC system
Supply , Erection, Testing
and commissioning of
LTAC system
23.5.06
Running
-
Permanent
3
Varahi stage-II-HVAC system
Supply , Erection, Testing
and commissioning of
HVAC system
19.6.07
Running
-
Permanent
4
Varahi stage-illumination
system
Supply and installation of
Illumination system
6.10.07
Running
-
Permanent
5
RM&U/CEA/AP
CEA statements-status of
RM&U of generating units
13.6.06
Running
-
Permanent
Page 27 of 63
Remarks
6
Gen/AP/Corr
Correspondence related to
generators of all projects
15.12.06
Running
-
Permanent
7
BDV test kits
Procurement of BDV test kit
to SGS
28.5.09
Running
-
Permanent
8
Lab Eqpts/ AP
Procurement of lab
equipments of all projects
26.7.06
Running
-
Permanent
9
SGS/CABLES
Procurement of copper
XLPE cables to Sharavathy
Generating Station
10.1.07
Running
-
Permanent
24.03.2010
Running
-
Permanent
II
CONSULTANCY PROJECTS
A
1X10MW ADDITIONAL GENERATING UNIT AT
MUNIRABAD DAM POWER HOUSE
1
LOT18F1C2/MUNIRABAD/
EPC
Page 28 of 63
List of files - Name of the Office : CEED/SEE2/EE-6
Address: Chief Engineer(Elec.Designs), 'Sudarshan Complex', 3rd Floor, No.22/23, Seshadri Road, BANGALORE-560 009.
Sl
No
.
File No.
I
EXISTING PROJECTS
1
2
3
Date of
Transfer of
file &
Authority
whom
transferred
Nature of
file
Permanent/
Temporary
Subject
Opening
Date of file
Closing Date
of file/running
file
SVP/PROTN/
Supply & erection of Control
and protection panels for 2
units & 4 lines at Sharavathy
Generating station
Mar-00
Running
-
Permanent
LOT17H5A1/ADPH/PROTN
Supply,
testing
&
commissioning of protection
& metering panels of ADPH
Apr-03
Running
-
Permanent
CEED/EE-6/EM
Supply,
Supervision
of
testing & commissioning of
200 nos. of micro processor
based energy meters for
generating stations of KPCL
Jan-04
Running
-
Permanent
Page 29 of 63
Remarks
4
5
6
7
8
SGS/R&M/ANN
Supply and erection of
microprocessor
based
annunciation
system
at
control room of Sharavathy
Generating Station
Mar-05
Running
-
Permanent
CEED/R&M/Prot/Gen/
Supply,
erection, testing
&commissioning
of
Numerical protection systems
for generators at SGS & NPH
Nov-05
Running
-
Permanent
CEED/R&M/Prot/Lines
Supply
&
erection
of
numerical relay systems for
lines at SGS, NPH, LPH &
retrofit of numerical line
protection relays for NPH.
Kadra & Kodasalli Power
Houses
Nov-05
Running
-
Permanent
CEED/R&M/Prot/Busbar
Supply, erection, testing &
commssioning of numerical
bus bar protection system at
Sharavathy
Generating
Station
Nov-05
Running
-
Permanent
CEED/Mallapur/R&M/Prot
Supply & supervision of
erection of two numbers of
Numerical
Generator
Protection relays for Mallapur
Power House
Mar-06
Running
-
Permanent
Page 30 of 63
Varahi stage II/EE6/Common
file
Implementation of VUGPH
stage-II
pre
bid
correspondences, approval
of civil drawings
Oct-04
Running
-
Permanent
10
Varahi stage II/EE6/protection
Implementation of VUGPH
stage-II
pre
bid
correspondences, approval
of civil drawings
Oct-06
Running
-
Permanent
11
Varahi stage II/EE6/Mani
Implementation of VUGPH
stage-II - MDPH drawings &
documents approval
Jan-07
Running
-
Permanent
12
Varahi stage II/EE6/220 kV
XLPE cable
Implementation of VUGPH
stage-II - 220 kV XLPE cable
Jan-07
Running
-
Permanent
13
Varahi stage II/EE6/SCADA &
Controls
Implementation of VUGPH
stage-II - SCADA & controls
Mar-07
Running
-
Permanent
14
Varahi Stage II/EE6/ LT cable
Implementation of VUGPH
stage-II - LT cables
Dec-07
Running
-
Permanent
15
Varahi Stage II/EE6/ Fiber
optic cable
Implementation of VUGPH
stage-II - Fiber optic cable
Feb-08
Running
-
Permanent
16
LOT/SCADA
Remote operation of hydel
stations
Jan-09
Running
-
Permanent
9
Page 31 of 63
17
18
19
LOT8&9/R&M/PROT
Retrofit of protection system
for generators, lines, bus
coupler & bus bar at Supa
Power
House
and
Generators
&
lines
at
Ghataprabha power house
Jan-09
Running
-
Permanent
LOT/EM/
Procurement of 112 nos.
microprocessor based 0.2
class energy meters with
ABT features and energy
management software for
ADPH & erstwhile VVNL
generating stations
Feb-09
Running
-
Permanent
CEED/SPH/110 KV CVT
Design,
Engineering,
Manufacturing,
quality
surveillance, Supply, Delivery
to site, erection, testing at
suppliers
works,
Transportation,
arranging
transit insurance, Delivery on
FOR
destination
basis
Supply of 4 nos. of CVTs for
Supa Dam Power House.
Jul-12
Running
-
Permanent
Page 32 of 63
20
21
LOT/ CEED/RTPS/Reactor
Tower/
LOT/ CEED/XLPE/NPH
Fabrication & Supply of
Galavanised Steel Structures
for 6 Nos. of 400 KV Switch
yard
Gantry
Towers,
Construction of required RCC
foundation. Erection
&
Commissioning
For
Establishing
63
MVAR,
400KV Bus Reactor Bay
Raichur
Thermal
Power
Station
Design,
Engineering,
Procurement, Supply after
Inspection/ Testing at works,
Delivery to site on FOR
basis, dismantling of existing
11 KV PILC Cable, Laying,
Termination,
Testing
&
Commissioning of 11 KV
XLPE
Single
Core
1000sq.mm Copper Cable for
4 nos.
Of Unit Auxiliary
Transformers of Nagjhari
Power House
Jul-12
Running
-
Permanent
Nov-12
Running
-
Permanent
Page 33 of 63
22
23
LOT/CEED//Prot/Bhadra
Design,
Engineering,
manufacture,
quality
surveillance, Supply, Delivery
to site, 11 KV switch Gear
Cubicle with CTs, PTs, & PT
& SA Cubicle, NGT & NGR
Cubicle, Retrofitting including
dismantling
of
existing
equipment,
Testing,
Commissioning of above for
2 nos. of 12 MW River Bed
Units of Bhadra Hydro
Electric Project.
Jan-13
Running
-
Permanent
LOT/CEED /
Prot/Bhadra/R&M
Design,
Engineering,
Manufacture,
Quality
surveillance,
Supply,
Delivery
to
site,
Dismantling
&
Retrofit/Erection, Testing,
Commissioning
and
handing over of Numerical
Protection
System
for
Generators,
Generator
Transformers & UATs for
two nos. of 12MW River
Bed Units of Bhadra HEP
Jul-12
Running
-
Permanent
Page 34 of 63
24
Correspondence with SRPC
II
NEW PROJECTS
A
GUNDIA HYDRO ELECTRIC PROJECT
1
Gundia / Protection
Supply & erection
protection system
of
2
Gundia / SCADA
Supply & erection
SCADA system
of
B
GHATAPRABHA RIGHT BANK CANAL POWER HOUSE
1
GRBC / Protection
Supply & erection
protection system
of
2
GRBC / SCADA
Supply & erection
SCADA system
of
3
GRBC / Cables
Supply & installation of
cables & cable trays
C
MUNIRABAD DAM POWER HOUSE
Apr-12
Running
-
Nov-08
Running
-
Permanen
t
Nov-08
Running
-
Permanen
t
Feb-10
Running
-
Permanen
t
Feb-10
Running
-
Permanen
t
Running
-
Permanen
t
Page 35 of 63
Permanent
(Additional unit of 10 MW):
1
MBAU / Protection
Supply & erection
protection system
of
2
MBAU / SCADA
Supply & erection
SCADA system
of
3
MBAU / Cables
Supply & installation of
cables & cable trays
D
SHIVASAMUDRAM SEASONAL SCHEME
1
Shivasamudra /Protection
Supply & erection
protection system
of
2
Shivasamudra / SCADA
Supply & erection
SCADA system
of
III
CONSULTANCY PROJECTS
1
Rammam / Protection
Supply & erection
protection system
of
2
Rammam / SCADA
Supply & erection
SCADA system
of
3
Rammam /XLPE
Supply of 132 kV XLPE
Cables
Mar-10
Running
-
Permanen
t
Mar-10
Running
-
Permanen
t
Running
-
Permanen
t
Running
-
Permanen
t
Running
-
Permanen
t
Running
-
Permanen
t
Running
-
Permanen
t
Running
-
Permanen
t
Page 36 of 63
Sl.
No.
KARNATAKA POWER CORPORATION LIMITED
List of Files - Name of the Office : CE(ED)/SEE-1/EE-7
Address : Chief Engineer (Elec.Designs), No.22/23, 3rd Floor, Sudarshan Complex, Sheshadri Road, Bangalore-560009
Date of
transfer of
Nature of
Closing date
Opening
file &
file
File No.
Subject
Remarks
of file/
date of file
authority
Permanent/
Running file
whom
Temporary
transferred
LOT/BHADRA/
RBU/R&M/
Renovation & Modernization of 2
Nos. 12MW River bed generating
units of Bhadra Hydro Electric
Project – Vol -I
April,
2007
December,
2008
-
Permanent
2
LOT/BHADRA/
RBU/R&M/
Renovation & Modernization of 2
Nos. 12MW River bed generating
units of Bhadra Hydro Electric
Project – Vol -IA
January,
2009
February,
2010
-
Permanent
3
LOT/BHADRA/
RBU/R&M/
Renovation & Modernization of 2
Nos. 12MW River bed generating
units of Bhadra Hydro Electric
Project – Vol -II
March,
2010
April,
2011
-
Permanent
4
LOT/BHADRA/
RBU/R&M/
May,
2011
May,
2012
-
Permanent
5
LOT/BHADRA/
RBU/R&M/
June,
2012
Running
-
Permanent
1
Renovation & Modernization of 2
Nos. 12MW River bed generating
units of Bhadra Hydro Electric
Project – Vol -III
Renovation & Modernization of 2
Nos. 12MW River bed generating
units of Bhadra Hydro Electric
Project – Vol. IV (OPU, AC
Page 37 of 63
Pump, D&D, HPCAS, CWP)
6
LOT/BHADRA/
RBU/R&M/
7
LOT/BHADRA/
RBU/R&M/
8
LOT/BHADRA/
RBU/R&M/
Renovation & Modernization of 2
Nos. 12MW River bed generating
units of Bhadra Hydro Electric
Project – Vol. V (Generators,
Cables, BGs)
Renovation & Modernization of 2
Nos. 12MW River bed generating
units of Bhadra Hydro Electric
Project – (TGB, Runner Ass, GA
ass, Turbine shaft, Shaft seal,
OSTD)
May,
2012
Running
-
Permanent
July,
2013
Running
-
Permanent
Renovation & Modernization of 2
Nos. 12MW River bed generating
units of Bhadra Hydro Electric
Project – General
October,
2013
Running
-
Permanent
9
LOT/BHADRA/
RBU/R&M/
Renovation & Modernization of 2
Nos. 12MW River bed generating
units of Bhadra Hydro Electric
Project – BFV, Governor, OPU
October,
2012
Running
-
Permanent
10
LOT/BHADRA/
RBU/R&M/
R&M of 2 Nos. 12MW River bed
generating units of Bhadra Hydro
Electric Project – Progress
Reports submitted by M/s AHPL
December,
2013
Running
-
Permanent
11
LOT/BHADRA/
RBU/R&M/
R&M of 2 Nos. 12MW River bed
generating units of Bhadra Hydro
Electric Project – Weekly
Progress Reports from site
January,
2014
Running
-
Permanent
Page 38 of 63
12
LOT/BHADRA/
RBU/R&M/
R&M of 2 Nos. 12MW River bed
generating units of Bhadra Hydro
Electric Project – MNRE
July,
2012
Running
-
Permanent
13
LOT/BHADRA/
RBU/R&M/
R&M of 2 Nos. 12MW River bed
generating units of Bhadra Hydro
Electric Project – Bills & Invoices
March,
2010
Running
-
Permanent
14
LOT/SHIVA
Shivasamudram project related
works – Vol. I
June,
2008
November,
2008
-
Permanent
15
LOT/SHIVA
Shivasamudram project related
works – Vol. II
November,
2008
October,
2009
-
Permanent
16
LOT/SHIVA
Shivasamudram project related
works – Vol. III
November,
2009
August, 2010
-
Permanent
17
LOT/SHIVA
Shivasamudram project related
works – Vol. IV
September
, 2010
May,
2011
-
Permanent
18
LOT/SHIVA
Shivasamudram project related
works – Vol. V
June,
2011
December,
2011
-
Permanent
19
LOT/SHIVA
Shivasamudram project related
works – Vol. VI
January,
2012
December,
2012
-
Permanent
20
LOT/SHIVA
Shivasamudram project related
works – Vol. VII
January,
2013
Running
-
Permanent
21
LOT/SHIMSHA
Shimshapura project related
works – Vol. I
June,
2008
June,
2010
-
Permanent
Page 39 of 63
22
LOT/SHIMSHA
Shimshapura project related
works – Vol. II
July,
2010
December,
2011
-
Permanent
23
LOT/SHIMSHA
Shimshapura project related
works – Vol. III
January,
2012
Running
-
Permanent
24
LOT/SHIVASHIMSHA/Gen
Shivasamudram & Shimshapura
project – Extra wages
August,
2012
Running
-
Permanent
25
CMG – Minutes
Shivasamudram & Shimshapura
project – CMG
January,
2014
Running
-
Permanent
26
Civil Works
Shivasamudram & Shimshapura
project – Civil works –Vol. I
February,
2011
December,
2011
-
Permanent
27
Civil Works
Shivasamudram & Shimshapura
project – Civil works –Vol. II
January,
2012
August,
2012
-
Permanent
28
Civil Works
Shivasamudram & Shimshapura
project – Civil works
September
,
2012
Running
-
Permanent
29
LOT/SHIVA-SHIMSHA/
Shivasamudram & Shimshapura
project – Vehicles
January,
2011
Running
-
Permanent
30
Solar plant
Shivasamudram & Shimshapura
project – 5MW Solar plant
June,
2011
Running
-
Permanent
31
Solar plant
Shivasamudram & Shimshapura
project – 10MW Solar plant
March,
2014
Running
-
Permanent
Page 40 of 63
32
LOT/SHIVA-SHIMSHA/
Shivasamudram & Shimshapura
project – Security –Vol. I
September
, 2008
December,
2010
-
Permanent
33
LOT/SHIVA-SHIMSHA/
Shivasamudram & Shimshapura
project – Security
June,
2011
Running
-
Permanent
34
LOT/SHIVA-SHIMSHA/
Shivasamudram & Shimshapura
project – Hospital
October,
2008
Running
-
Temporary
35
Circulars
Circulars
July,
2005
Running
-
Permanent
36
Approvals
Shivasamudram & Shimshapura
project – Approvals
November,
2013
Running
-
Permanent
37
LOT/Shiva/
Quarters/
September
, 2012
Running
-
Permanent
Shivasamudram – Permanent
Quarters
38
LOT/SHIVA/ BWSSB
BWSSB – Project IV Stage,
Phase-II – Acquisition of land for
establishing canal intake at
Shivasamudram
39
LOT/SHIVA-SHIMSHA/
Shivasamudram & Shimshapura
project – Tenders & Enquiries
April,
2013
Running
-
Permanent
40
LOT/SHIVA-SHIMSHA/
Shivasamudram & Shimshapura
project – WO & PO
March,
2013
Running
-
Permanent
41
LOT/SHIVA-SHIMSHA/
Shivasamudram & Shimshapura
project – Pollution Control
December,
2013
Running
-
Temporary
42
LOT/SHIMSHA/
BREAKERS
Shimsha – Supply, Erection &
Commissioning of 3.3kV & 6.6kV,
August,
2009
Running
-
Temporary
October,
2009
Running
Page 41 of 63
Transferred
from CE(Y)
Temporary
office to CEED
office
630 Amps, Vacuum Circuit
Breakers along with associated
equipments.
Page 42 of 63
LIST OF FILES – Name of Office: CE(ED)/SEE-2/EE-8
ADDRESS: Chief Engineer (Elec.Designs), "Sudarshan Complex", 3rd Floor, No.22/23, Sheshadri Road,
BANGALORE – 560 009
Sl
No.
File No.
Subject
1
LOT3H3A1/ POWER
SUPPLY
Providing power supply to
GERUSOPPA COLONY from
power house
2
RTPS/POWER
SUPPLY
Providing power supply to
shaktinagar COLONY from
RTPS
3
R&M/123/ 72.5 KVCT/
PROCUREMENT OF 123/72.5
KV Current transformers for
KPCL power houses
Date of
transfer of
file and
authority
whom
transferred
Nature of
file
permanent/
temporary
opening
date of the
file
Closing date
of file/
running
2009, April
Closed
July 2013
NIL
Permanent
2009,
August
Closed
September
2013
NIL
Permanent
Running
NIL
Permanent
2006, April
Page 43 of 63
REMARKS
M/s RIEL
requested for
refund of
penalty after
finalization of
contract and
returning
security
deposit BG.
4
R&M/123/ 72.5 KVPT/
PROCUREMENT OF 123/72.5
KV potential transformers for
KPCL power houses
2006, April
Running
NIL
Permanent
5
R&M/245 KVPT/
PROCUREMENT OF 245 KV
potential transformers for KPCL
power houses
2006, April
Running
NIL
Permanent
6
R&M/245 KVCT/
PROCUREMENT OF 245 KV
Current transformers for KPCL
power houses
2006, April
Running
NIL
Permanent
7
SGS/ADLB/ SM
PROVIDING 2 NOS. 220 KV
ADDITIONAL LINE BAYS AT
SGS
2004,
October
Running
NIL
Permanent
8
SGS/ADLB/ ER
ERECTION AND
COMMISSIONING OF 2 NOS.
220 KV ADDITIONAL LINE
BAYS AT SGS
2004,
October
Running
NIL
Permanent
9
GUNDIA/
GINDIA UNDER GROUND
POWER HOUSE
2004, April
Running
NIL
Permanent
10
LIGHTING/ 2K0810/CGL
PROCUREMENT OF LIGHTING
FITTING AND ACCESSORIES
FROM M/S CGL
2008,
october
Closed
NIL
Permanent
11
LIGHTING/2K0810/SURYA
PROCUREMENT OF LIGHTING
FITTING AND ACCESSORIES
FROM M/S SURYA ROSHINI
2008,
october
Closed
NIL
Permanent
Page 44 of 63
12
LIGHTING 2K08-10
PHILIPS
PROCUREMENT OF LIGHTING
FITTING AND ACCESSORIES
FROM M/S PHILIPS
2008, Sep
Closed
NIL
Permanent
13
LIGHTING/ 2K08-10/
CAPART
PROCUREMENT OF LIGHTING
FITTING AND ACCESSORIES
FROM M/S CAPART
2008,
october
Closed
NIL
Permanent
14
LIGHTING / 2K08-10/
MANAS
PROCUREMENT OF LIGHTING
FITTING AND ACCESSORIES
FROM M/S MANAS
2008, sep
Closed
NIL
Permanent
15
KADRA/POWER
SUPPLY
PROVIDING POWER SUPPLY
TO KPCL COLONY AT KADRA
FROM KADRA POWER HOUSE
2010,
December
Running
NIL
Permanent
16
NPH/POWER SUPPLY
PROVIDING POWER SUPPLY
TO KPCL AMBIKANAGAR
COLONY FROM NAGJHARI
POWER HOUSE
2011,
November
Running
NIL
Permanent
17
RTPS/ SHUNT
REACTOR
ESTABLISHING 1 NO 400KV
SHUNT REACTOR BAY AT
400KV SWITCHYARD IN RTPS
2010,
September
Running
NIL
Permanent
18
VARAHI/ADDL. LINE
BAY
ESTABLISHING 1 NO 220KV
ADDITIONAL LINE BAY AT
VARAHI 220KV SWITCHYARD
2012,
July
Running
NIL
Permanent
19
R&M/123/72.5KV CTs
PTs
SUPPLY OF R&M/123/72.5KV
CTs PTs REQUIRED FOR KPCL
2010,
March
Running
NIL
Permanent
Page 45 of 63
POWER HOUSES
20
R&M/145KV SF6
BREAKERS
SUPPLY OF 145KV SF6
BREAKERS REQUIRED FOR
KPCL POWER HOUSES
2010,
March
Running
NIL
Permanent
21
R&M/245/145KV SF6
BREAKERS
SUPPLY OF 245/145KV SF6
BREAKERS REQUIRED FOR
KPCL POWER HOUSES
2011,
March
Running
NIL
Permanent
22
R&M/123/72.5KV
ISOLATORS
SUPPLY OF 123/72.5KV
ISOLATORS REQUIRED FOR
KPCL POWER HOUSES
2010,
April
Running
NIL
Permanent
23
SHARAVATHY/
POWER SUPPLY
PROVIDING POWER SUPPLY
TO SHARAVATHY COMPLEX(
LINGANAMAKKI, KARGAL &
JOG) FROM LINGANAMAKKI
POWER HOUSE
2013,
May
Running
NIL
Permanent
24
R&M/245 KV
BREAKERS/NPH/
SUPPLY OF 3 NOS 245KV SF6
BREAKERS FOR NAGJHARI
POWER HOUSES
2014,
January
Running
NIL
Permanent
Page 46 of 63
List of Files - Name of the Office :CEED/SEE-1/EE-9
Address: Chief Engineer(Electrical Designs), 'Sudarshan Complex', 3rd Floor, No.22/23, Seshadri Road, BANGALORE-560 009.
Sl
No.
File No.
Subject
Opening
date of
file
Closing date
of
file/Running
file
Date of
transfer of
file &
authority
whom
transferred
Nature of
file
Permanent/
Temporary
1
LOT12EO/ VA
VHEP Stage II-Correspondence
with VATECH
29.07.1991
Running file
-
Permanent
2
LOT12EO
VHEP StageII-Fabrication &
erection penstock steel liners
(IHP)
08.06.2000
Running file
-
Permanent
3
LOT/Customs
Customs KPC/C&F/MD
24.01.2001
Running file
-
Permanent
4
LOT/Custom duty of
RTPS
For clearing and forwarding of
imported goods
24.01.2001
Running file
-
Permanent
5
LOT/Gundia
Gundia HEP –Design fabrication
& erection of pressure
shaft/penstock steel liners
24.02.2005
Running file
-
Permanent
6
LOT/ RAMMAM/ PEN
Rammam HEP Stage III
Fabrication & erection of
penstock
Jan.2007
Running file
-
Permanent
Page 47 of 63
Remarks
Consultancy
work to NTPC
7
LOT9/ CUSTOMS &
LEGAL
Customs & Legal
correspondences
8
LOT/ Pumped Storage
/Pen
9
2007
Running file
-
Permanent
Henni & Bare Halla pumped
storage scheme – Steel
requirement for penstock
16.06.2008
Running file
-
Permanent
Paper file
LOT/SSPH
Cauvery seasonal scheme/Eco
dia & steel requirement
11.03.2008
Running file
-
Permanent
Paper file
10
LOT/ Mahadayi HEP
Mahadayi HEP – Steel
requirement for dam power
house and UGPH
15-Sep2008
Running file
-
Permanent
11
LOT/Bhadra/LB Unit
Reconditioning and rectification
of 2MW LBC Bhadra Unit
02.05.2009
Running file
-
Permanent
12
LOT/MGHE/Steel wire
ropes
Supply of steel wire ropes for
MGHE trolley
26.05.2009
Running file
-
Permanent
13
LOT/MGHE/Dynamic
Braking
Design, supply, erection and
commissioning of ac drive with
dynamic braking for MGHE
trolley
26.05.2009
Running file
-
Permanent
14
LOT/GRBC
Ghataprabha right bank canal
additional units
08.09.2009
Running file
-
Permanent
15
LOT/Safety
Measures relating to safety and
Electrical Supply – CEA 2010
02.11.2011
Running file
-
Permanent
Page 48 of 63
16
LOT/ Progress report
Monthly progress of CEEDReport to H.O
05.10.2012
Running file
-
Permanent
17
LOT/General file
General correspondence
April 2012
Running file
-
Permanent
18
LOT/Audit
Replies to queries & general
correspondence with GM(IA) and
RAO
04.02.2013
Running file
-
Permanent
AG & IA
19
LOT/Budget
Annual plan & budget pertaining
to the works handled by this
office and also Shivasamudram &
Shimsha project & CSD
02.12.2013
Running file
-
Permanent
Annual plan &
budget in one
file
20
LOT/SRPC/RGMO
SRPC/RGMO correspondence
14.06.2013
Running file
-
Permanent
21
LOT/Foreign purchase
orders
Supply of imported spares
01.04.2013
Running file
-
Permanent
22
LOT/Custom duty of
BTPS
For clearing and forwarding of
imported goods
01.04.2013
Running file
-
Permanent
Page 49 of 63
Sl.
No.
1
2
3
4
5
6
7
8
List of Files-Name of the Office: CE(ED)/SE(E)-1/EE-10
Address: Chief Engineer (Electrical Designs), No.22/23, 3rd Floor, Sudarshan Complex, Sheshadri Road, B’lore-09
Date of
transfer of
Nature of
Closing date
file &
file
Opening
Remarks
PO No./File No.
Subject
of file/
authority
date of file
Permanent/
Running file
whom
Temporary
transferred
LOT17F1C5/SP.TR/20
MVA(Vol-1)
20 MVA SPARE GT FOR ADPH
Mar-08
Jul-09
Permanent
-
LOT17F1C5/SP.TR/20
MVA (Vol-2)
LOT17F1C5/SP.TR/20
MVA (Vol-3)
LOT17F1C5/ TORP
(vol-1)
LOT17F1C5/ TORP
(vol-2)
LOT17F1C5/SP.TR/67
MVA, (Vol-1)
LOT17F1C5/SP.TR/67
MVA, (Vol-2)
LOT17F1C5/SP.TR/67
20 MVA SPARE GT FOR ADPH
20 MVA SPARE GT FOR ADPH
2000LPH TRANSFORMER OIL
REGENERATION PLANT.
2000LPH TRANSFORMER OIL
REGENERATION PLANT.
67 MVA SPARE GT FOR ADPH
67 MVA SPARE GT FOR ADPH
67 MVA SPARE GT FOR ADPH
Aug-09
Feb-10
-
Permanent
-
Feb-10
Running
-
Permanent
-
SEPT’200
9
DEC’2010
-
Permanent
-
DEC’2010
Running
Sep-07
Mar-08
-
Permanent
-
Mar-08
Jan-10
-
Permanent
-
Jan-10
Running
-
Permanent
-
Page 50 of 63
Permanent
9
10
11
12
13
14
15
16
17
MVA, (Vol-3)
RTPS
REACTOR/1499(VOL1)
RTPS
REACTOR/1499(VOL2)
RTPS
REACTOR/1499(VOL3)
RTPS
REACTOR/1499(VOL4)
SGS/115MVA GT/1897/
(Vol. 1
SGS/115MVA
GT/1897/(Vol.2)
SGS/115MVA
GT/1897/(Vol.3
NPH/175MVA
GT/1896/(Vol.1)
NPH/175MVA
GT/1896/(Vol.2)
18
NPH/175MVA
GT/1896/(Vol.3
19
NPH/175MVA
GT/1896/(Vol.4
20
LPH/30MVA
GT/524/(Vol.1)
63 MVAR Bus Reactor for RTPS
Sept’2009
Dec’2010
-
Permanent
-
Dec’2010
Sept’2011
-
Permanent
-
Sept’2011
Aug’2012
Aug’2012
Running
-
Permanent
-
Nov’2010
Feb’2012
-
Permanent
-
Feb’2012
Dec’2012
-
Permanent
-
Dec’2012
Running
-
Permanent
-
175 MVA GTs for NPH
Nov’2010
Feb’2012
-
Permanent
-
175 MVA GTs for NPH
Feb’2012
Sept’2012
-
Permanent
-
175 MVA GTs for NPH
Sept’2012
Mar’’2013
-
Permanent
-
-
Permanent
-
-
Permanent
-
63 MVAR Bus Reactor for RTPS
63 MVAR Bus Reactor for RTPS
Permanent
63 MVAR Bus Reactor for RTPS
115 MVA GTs for SGS
115 MVA GTs for SGS
115 MVA GTs for SGS
175 MVA GTs for NPH
Mar’’2013
Running
Aug’2012
30MVA GTs for LPH
Nov’2010
Page 51 of 63
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
LPH/30MVA
GT/524/(Vol.2)
SPH/55MVA
GT/1469(Vol.1)
SPH/55MVA
GT/1469(Vol.2)
SPH/55MVA
GT/1469(Vol.3
SHIVA/20MVA
GT/1160/ (Vol.1)
4x2 MVA
UAT/SGS/(Vol.1)
4x2 MVA
UAT/SGS/(Vol.2)
NPH/2 MVA
UAT/1176(Vol.1)
NPH UAT/NPH/(Vol.2)
NPH UAT/NPH/(Vol.3)
NPH/2 MVA
ST/1188(Vol.1)
LOT12F4/A/STAGE-II/
AUX.TR.(Vol-1)
LOT12F4/A/STAGE-II/
GTs(Vol-1)
SVP/8000/
LOT12F4/A/STAGE-II/
MDPH(VOL-1)
KPCL/CPRI/TR.OIL
TESTING/849(Vol.1)
30MVA GTs for LPH
Aug’2012
Running
-
Permanent
-
55 MVA GTs for SPH
March’201
1
Sept’2011
-
Permanent
-
55 MVA GTs for SPH
Sept’2011
Apr’2012
-
Permanent
-
55 MVA GTs for SPH
Apr’2012
Running
20 MVA GTs for SHIVA
March’201
2
Running
-
Permanent
-
2 MVA UATs for SGS
Feb’2012
Jan’2013
-
Permanent
-
2 MVA UATs for SGS
Jan’2013
Running
-
Permanent
-
2 MVA UATs for NPH
Feb’2012
July’2013
-
Permanent
-
2 MVA UATs for NPH
2 MVA UATs for NPH
July’2013
Sept’2013
March’201
2
Sept’2013
Running
-
Permanent
Permanent
-
Running
-
Permanent
-
Oct-06
Jul-07
Permanent
Feb-08
Jan’09
Permanent
Sept.07
March’10
Permanent
Jan-09
March’10
Permanent
Aug’2010
Feb’2012
2 MVA ST for NPH
2X2.5MVA UATs FOR VHEPSTAGE-II
2X130MVA GENERATOR
TRANSFORMER FOR VHEPSTAGE-II
SPARE GT FOR SGS(CGL)
BALANCE R&M WORKS OF
MDPH.
Transformer oil testing by CPRI
Page 52 of 63
Permanent
-
Permanent
-
37
38
39
40
41
42
KPCL/CPRI/TR.OIL
TESTING/849 (Vol.2)
LOT4F1C3/TR.OIL/296
6/(Vol.1)
LOT4F1C3/TR.OIL/296
6/(Vol.1)
LOT4F1C5/TR.OIL/(VO
L-1)
LOT4F1C5/TR.OIL/(VO
L-2)
LOT4F1C5/TR.OIL/(VO
L-3)
LOT4F1C5/TPI(Vol-1)
43
44
LOT4F1C5/TPI(Vol-2)
45
46
47
48
49
50
51
52
53
GHEP/GEN
GHEP/GTs
GHEP/UATs
GHEP/FF&M
MUNIRABAD/GEN
MUNIRABAD/GT
MUNIRABAD/UAT
MUNIRABAD/FF& MS
STRP/SP GT/
Transformer oil testing by CPRI
PROCUREMENT OF TR.OIL
FROM M/s.Raj Petro Specialities.
PROCUREMENT OF TR.OIL
FROM M/s.Raj Petro Specialities.
281.67KL OF TR. OIL FOR KPCL
PROJECT
281.67KL OF TR. OIL FOR KPCL
PROJECT
281.67KL OF TR. OIL FOR KPCL
PROJECT
THIRD PARTY INSPECTION OF
GT
THIRD PARTY INSPECTION OF
GT
GTs for GHEP
GTs for GHEP
GTs for GHEP
GTs for GHEP
M’BAD GTs & UATs
M’BAD GTs & UATs
M’BAD GTs & UATs
SP.GT FOR STRP
Feb’2012
Running
-
Permanent
Aug’2010
Sept’2012
-
Permanent
Sept’2012
Running
-
Permanent
Oct-06
Mar-07
Permanent
Mar-07
APR’07
Permanent
FEB’06
MAY’07
Permanent
Oct-06
Jul-07
-
Permanent
Jul-07
Aug’08
-
Permanent
March '10
March '10
March '10
March '10
March '10
March '10
March '10
March '10
March '10
Running
Running
Running
Running
Running
Running
Running
Running
Running
-
Permanent
Permanent
Permanent
Permanent
Permanent
Permanent
Temporary
Permanent
Permanent
Page 53 of 63
-
KARNATAKA POWER CORPORATION LIMITED
List of Files - Name of the Office : CE(ED)/SEE-2/EE-11
Address: Chief Engineer (Elec. Designs), 'Sudarshan Complex', 3rd Floor, No.22/23, Sheshadri Road,
Sl
No.
File No.
LOT/DCOC/Elec/fire
1
LOT/DCOC/Elect
2
3
4
Subject
Opening
date of file
Fire protection system& Fire
5/2/2014
alarm system for Drug controllers
office complex Bengaluru.
Electrification of Drug Controllers 27/12/13
office Complex Bengaluru.
Closing date
of file/
Running file
Date of
transfer of
file &
authority
whom
transferred
BANGALORE-560 009.
Nature of
file
Permanent/
Temporary
NIL
EE-1
RUNNING
NIL
EE-1
RUNNING
CEED/RPCL/B&C
Quarters/Elec
Electrification for B&C quarters
RPCL Shaktinagar
28/10/13
NIL
EE-1
RUNNING
LOT/BTPS/TSE
Proposed township for staff of
BTPS
7/9/2013
NIL
EE-1
RUNNING
Page 54 of 63
Remarks
KARNATAKA POWER CORPORATION LIMITED
LIST OF FILES AND RECORDS UNDER SECTION 4(1)A OF THE RIGHT TO INFORMATION ACT 2006
Name of the Office : Superintending Engineer (Computer Services Department)- EE1-Division
Address : 116/2, Trade Centre Building, Race Course Road, Bangalore-560001
Name of work : Computer Services
Sl.
File No.
No.
Opening
date of file
Closing
date of file
Nature of
file
permanent/
temporary
Remarks
A1L/11 10 07/Hardware Procurement of PCs and Printers
and maintenance
A1L/11 10 07/Hardware Procurement of PCs and Printers
and maintenance
A1L/11 10 07/Hardware Procurement of PCs and Printers
and maintenance
20.03.2009
31.12.2009
Permanent
Volume-I
01.01.2010
19.05.2010
Permanent
Volume-II
20.05.2010
28.08.2010
Permanent
Volume-III
4
LO/CSD/Hardware/2010 Procurement of PCs, Printers and
MS Software 2007
29.08.2010
17.12.2013
Permanent
Volume-IV
5
LO/CSD/Hardware/PCs
Procurement of PCs and printers
and MS Software 2007
18.12.2013
Running
Permanent
Volume-V
6
24.04.2010
Permanent
Volume-I
16.11.2010
Running
Permanent
Volume-II
01.01.2010
30.09.2010
Permanent
Volume-I
9
LO/CSD/Xerox & Fax
Procurement of Computer
Consumables
Procurement of Computer
Consumables
Procurement of Xerox and Fax
Machine
Procurement of Xerox and Fax
20.04.2009
8
LO/CSD/Comp
Consumables
LO/CSD/Comp
Consumables
LO/CSD/Xerox & Fax
01.10.2010
08.12.2010
Permanent
Volume-II
1
2
3
7
Subject
Page 55 of 63
Date of
transfer of
file and
authority
whom
transfer
10
LO/CSD/Xerox & Fax
11
LO/CSD/Xerox & Fax
12
LO/CSD/Laptops
Machine
Procurement of Xerox and Fax
Machine
Procurement of Xerox and Fax
Machine
Procurement of Laptops
13
LO/CSD/Plotter/AMC
14
LO/CSD/CCMS/PCGTPS
15
LO/CSD/Adobe Acrobat
16
LO/CSD/Adobe Acrobat
17
LO/CSD/PCPrinters/2011
LO/CSD/PCPrinters/2011
LO/CSD/PCPrinters/2011
LO/CSD/PCPrinters/2011
LO/CSD/Adobe Acrobat
18
19
20
21
22
23
24
08.12.2010
17.06.2011
Permanent
Volume-III
18.06.2011
Running
Permanent
Volume-IV
18.05.2010
Running
Permanent
AMC of plotters
20.05.2010
Running
Permanent
Procurement of PC for
implementation of CCMS
package at GTPS
Procurement of Adobe Acrobat
Software
Procurement of Adobe Acrobat
Software
Procurement of PCs & Printers
11.10.2010
Running
Permanent
05.10.2010
17.10.2012
Permanent
Volume-I
18.10.2012
Running
Permanent
Volume-II
01.12.2010
20.10.2011
Permanent
Volume-I
Procurement of PCs & Printers
22.10.2011
14.02.2012
Permanent
Volume-II
Procurement of PCs & Printers
15.02.2012
09.07.2012
Permanent
Volume-III
Procurement of PCs & Printers
10.07.2012
Running
Permanent
Volume-IV
05.10.2010
17.10.2012
Permanent
Volume-I
18.10.2012
Running
Permanent
Volume-II
08.06.2011
Running
Permanent
20.08.2011
15.05.2013
Permanent
Procurement of Adobe Acrobat
Software
LO/CSD/Adobe Acrobat Procurement of Adobe Acrobat
Software
LO/CSD/ Digital
Procurement of Digital Duplicator
Duplicator
to Energy Department
LO/CSD/AMC(A1L/2511 AMC of laptops, PCs, Printers
01)
and Scanners of Bangalore
Page 56 of 63
25
LO/CSD/HDD
26
LO/CSD/LMP/Jog
27
LO/CSD/DMP-LMP
28
LO/CSD/PC-PrintersFAX
29
LO/CSD/Xerox
30
based offices
Procurement of Hard Disk Drives
25.08.2011
Running
Permanent
Procurement of Line Matrix
Printers to AGM(F)-Jog
Procurement of Dot Matrix and
Line Matrix Printers
14.10.2011
Running
Permanent
28.11.2011
Running
Permanent
Procurement of PC, Printers &
Fax Machine to PS to MD & PS
to TD
Procurement of copier machine to
GM(CA&CS)
01.12.2011
Running
Permanent
09.01.2012
Running
Permanent
LO/CSD/Copier/IA
Procurement of copier machine to
Internal Audit Office
09.03.2012
Running
Permanent
31
LO/CC/RRC
01.04.2012
Running
Permanent
32
LO/CSD/PCs/RPCL
22.06.2012
Running
Permanent
33
LO/CSD/PCPrinters/2012-13
LO/CSD/PC/2012-13
Refilling/Re-manufacturing of
cartridges
Procurement of PCs to HRD &
RPCL
Procurement of PCs & Printers
05.06.2012
16.05.2013
Permanent
Volume-I
Procurement of PCs
17.05.2013
Running
Permanent
Volume-II
Procurement of Printers
21.11.2012
26.07.2013
Permanent
Volume-I
Procurement of printers
20.07.2013
Running
Permanent
Volume-II
Disposal of old computers and
peripherals
AMC of laptops, PCs, Printers
and Scanners of Bangalore
based offices
20.04.2013
Running
Permanent
16.05.2013
Running
Permanent
34
35
36
37
38
LO/CSD/Printers/201213
LO/CSD/Printers 201213
LO/CSD/Scrap
A1L/AMC of PCs &
Printers
Page 57 of 63
39
LO/CSD/Scanner
Procurement of Scanner
20.04.2013
Running
Permanent
40
LO/CSD/Copier/CETD
Procurement of Photo Copier
Machines to CETD
14.02.2013
Running
Permanent
41
LO/CSD/PCs-PrintersFax (APCCF)
Procurement of PCs, Printers &
Fax Machine
21.03.2013
Running
Permanent
42
LO/CSD/Fax/SEERO
Procurement of Fax Machine to
SEE(RO)
21.03.2013
Running
Permanent
43
Procurement of PCs to HRD &
AG Audit
Procurement of Printers to HRD
19.06.2013
Running
Permanent
44
LO/CSD/PC/HRD-AG
Audit
LO/CSD/Printer/HRD
12.06.2013
Running
Permanent
45
LO/CSD/PC/2013-14
Procurement of PCs
01.04.2013
05.02.2014
Permanent
Volume-I
46
LO/CSD/PC/2013-14
Procurement of PCs
06.02.2014
Running
Permanent
Volume-II
47
AMC of Wipro printers
13.08.2013
Running
Permanent
48
LO/CSD/AMC/Wipro
Printer
LO/CSD/Homepage
Home page
31.08.2013
Running
Permanent
49
LO/CSD/Consumables
Annual rate contract for supply of
consumables
27.09.2013
Running
Permanent
50
LO/CSD/VC
Video Conferencing
06.12.2013
Running
Permanent
51
52
LO/CSD/ Projector
LO/CSD/Copier/CMS(A)
-SE(Fuels)
Procurement of Projectors
Procurement of copier machine to
CMS(A) & SE(Fuels)
01.01.2014
16.01.2014
Running
Running
Permanent
Permanent
53
LO/CSD/Copier/PCTP
10.02.2014
Running
Permanent
54
LO/CSD/PCs/School
Procurement of colour copier
machine having print & scan
facility for PCTP
Procurement of PC to Sri
Amareshwara Girls High School
at Lingasugur
12.03.2014
Running
Permanent
Page 58 of 63
KARNATAKA POWER CORPORATION LIMITED
LIST OF FILES AND RECORDS UNDER SECTION 4(1)A OF THE RIGHT TO INFORMATION ACT 2006
Name of the Office : Superintending Engineer (Computer Services Department)- EE2-Division
Address : 116/2, Trade Centre Building, Race Course Road, Bangalore-560001
Name of work : Computer Services
Sl.
File No.
No.
1
A1L/40 60 01
2
3
A1L/43 10 06
A1L/11 10 06
4
A1L/11 10 06
5
6
7
8
A1L/11 10 06/LAN
A1L/11 10 06/LAN
A1L/11 10 06/LAN
A1L/11 10 06
Subject
Opening
date of file
LAN ESTABLISHMENT AT JOG
COMPLEX
KPCL WIDE AREA NETWORK
OBLIGATION DOCUMENTS
CAD OVERLAY
ESTABLISHMENT OF LAN AT I
FLOOR OF TRADE CENTRE
BUILIDING
ESTABLISHMENT OF LAN AT
ALL ACCOUNTS & STORES OF
KPCL.
ESTABLISHMENT OF LAN AT
ALL ACCOUNTS & STORES OF
KPCL.
ESTABLISHMENT OF LAN AT
ALL ACCOUNTS & STORES OF
KPCL.
PROCURMENT OF 2 SERVERS
& PRINTERS I FLOOR, TRADE
Page 59 of 63
Closing
date of file
Date of
transfer of
file and
authority
whom
transfer
Nature of
file
permanent/
temporary
Remarks
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
9
A1L/11 10 07/LAN
10
A1L/11 10 07/LAN
11
12
A1L/43 10 06
13
14
15
A1L/43 10 06
A1L/43 10 06/BSNL
16
A1L/43 10 06
18
19
20
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
A1L/43 10 06
A1L/ 43 10 06/SCADA
17
CENTRE
LAN OF ALL OFFICES OF KPCL
( PHASE 2-B)
LAN OF ALL OFFICES OF KPCL
( PHASE 2-B)
M/s.HCL COMNETCORRESPONDENCE WITH
M/s.HCL COMNET
A1L/43 10 06
A1L/43 10 06 / AMC Digital Spectrum
Exchanges
A1L/20 11 05
A1L/43 10 06/NS
M/s.HCL COMNETCORRESPONDENCE WITH
KPTCL
SHARING OF REAL TIME DATA
OF KPCL STATION THROUGH
V-SAT
M/s.HCL COMNETINSTALLATION REPORTS
MPLS AND LEASE LINES
M/s.HCL COMNETCORRESPONDENCE WITH ALL
PROJECT HEADS
M/s.HCL COMNETUPGRADATION OF
TELEPHONE EXCHANGES
AMC - DIGITAL SPECTRUM
EXCHANGES
PROCUREMENT OF
ANIMATION SOFTWARE FOR
PRESENTATION
NETWORK SECURITY
CLOSED
Oct 2000
RUNNING
Permanent
CLOSED
Mar-2010
RUNNING
CLOSED
VOL-1
CLOSED
Permanent
VOL-9
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
Nov-2009
Running
Page 60 of 63
Permanent
VOL-7
21
A1L/20 44 01
22
A1L/43 10 06
23
24
25
26
27
28
29
A1L/25 11 01/ AMC /
A1L/1143 82 01
A1L/ 43 10 06 / RACKS
A1L/ 11 10 07 /
GANESHGUDI
A1L/43 10 06 / Shifting
A1L/1110 07 / AMCLAN
A1L/ 43 10 06 /
E - Tendering
A1L / 43 10 06 / Addnl.
- Chassis
30
A1L/ 11 10 07 / OFC SGS & NJ
31
SYSTEMS
UPGRADATION OF ACAD R-14
TO ACAD 2002
M/s.HCL COMNETCOMPLAINTS
AMC OF SERVERS,
COMPUTERS AND PRINTERS
VSAT – KEB
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
PROCUREMENT OF RACKS
CLOSED
CLOSED
PROVIDING LAN
CONNECTIVITY TO
GANESHGUDI
SHIFTING OF VSAT FROM
MASTIKATTE TO ALMATTI
AMC FOR LAN AT BANGALORE
AND PROJECTS
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
Running
CLOSED
E - Tendering / E - Procurement
PROCUREMENT OF
ADDITIONAL CHASSIS WITH
DATA CHANNELS FOR HEAD
OFFICE
PROVIDING OFC CABLING
WITH NECESSARY
ACCESSORIES TO
PROVIDE VOICEAND DATA
CONNECTIVITY BETWEEN
POWER
COLONIES AT JOG AND
Page 61 of 63
32
33
34
35
A1L / 43 10 06 / AMC
A1L / 62 11 02
A1L / 21 10 01
A1L / 12 42 02 /
Exchange
A1L / 11 10 07/ LAN /
Hospitals
AMBIKANAGAR
AMC OF DAMA VSATs
KSBCL - CONSULTANCY
ORACLE ( ANNUAL TECHNICAL
SUPPORT )
Migration from Exchange 5.5 to
Exchange 2000
Running
Running
Running
Permanent
Permanent
Permanent
Running
Permanent
Running
Permanent
Running
Permanent
Jun 2013
Running
Permanent
VOL-2
Apr 2007
Running
Permanent
VOL-1
Running
Permanent
Running
Permanent
May 2008
Running
Permanent
VOL-4
Nov 2008
Nov 2008
Running
Running
Permanent
Permanent
VOL-3
VOL-1
Mar 2009
Running
Permanent
VOL-1
Jan 2003
Running
Permanent
VOL-11
LAN AT HOSPITALS (Project
Locations)
36
37
38
39
40
41
42
43
44
45
46
A1L / 12 48 01 / GPS
A1L / 11 10 07 / HW /
BS /
A1 L / 11 10 07 / LAN /
Gerusoppa /
A1 L / 11 10 07 /
Ethernet Switches /
A1 L / 11 10 07/ LAN
A1L/ 11 10/07
/INTERNET
BANDWIDTH
A1L/RESORVOIR
A1L/1110 07/ KADRALAN
A1L/1110 07/
KODASALLI
LO-CSD/ AMC-LAN
PROCUREMENT OF HAND
HELD GPS
PROCUREMENT OF BLADE
SERVERS
LOCAL AREA NETWORK GERUSOPPA
PROCUREMENT OF GIGA
ETHERNET SWITCHES
OFC AT KARGAL AND
LINGANAMAKKI
INTERNET BANDWIDTH
RESERVOIR LEVELS
LOACL AREA NETWORK FOR
KADRA
LOACL AREA NETWORK FOR
KODASALLI
AMC FOR LAN AT BANGALORE
DG PLAN AND
Page 62 of 63
47
48
LO-CSD / AutoCAD
L0-CSD/STAAD
LO-CSD/ETABS
49
50
51
52
53
54
55
56
57
LO-CSD/WIRELESS
DATA CARD
A1 L / 11 10 07 / LAN /
Shivasamudram /
LO-CSD/HO/IP
Surveillance
SHIVASAMUDRAM
UPGRADATION &
PROCUREMENT OF AUTOCAD
RENEWAL OF STAAD
SUBSCRIPTION
PROCUREMENT AND
RENEWAL OF ETABS AND
SAFE SOFTWARE
WIRELESS DATA CARD
LOCAL AREA NETWORK Shivasamudram
IP Surveillance Head office
LO-CSD/BS/AMC
AMC OF BLADE/ RACK
SERVERS
LO-CSD/Wireless
communication
Wireless communication
LO-CSD/Biometric
Biometric system
LO-CSD/Thermal Plant
Thermal plant Animation
LO-CSD/Cameras Shiva LAN and Cameras for Shiva
Sep 2001
Running
Permanent
VOL 5
Oct 2009
Running
Permanent
VOL-3
Feb 2013
Running
Permanent
VOL-1
Jun 2009
Running
Permanent
VOL-2
Aug 2011
Running
Permanent
VOL-2
Mar 2013
Running
Permanent
VOL-1
May 2009
Running
Permanent
VOL-2
Dec 2008
Running
Permanent
VOL-1
Mar 2013
Aug 2013
Dec 2013
Running
Running
Running
Permanent
Permanent
Permanent
VOL-1
VOL-1
VOL-1
Page 63 of 63
Transferred
from CECG /
HO