HCA HLL Name D t PRH Wind Kts 05 February 2015 Mobile Non Compliances Limitation Acergy Viking 21.0 12.8 3 • Survey Vessel Nil limitation Aegir 28.5 15.6 1 Crane Barge • Table 1(T) if overflight of Fwd foam monitor platform is unavoidable Nil 150° 5:1 African Inspiration African Vision Aker Wayfarer 20.8 12.8 3 8 Offshore Construction Vesel - Prohibited Landing Sector : 004-017 deg rel to helideck heading. Sector marked. 20.9 12.8 3 MSV 20.9 12.8 3 Emergency exit hatch located inside landing area Misc Helideck net not fitted Nil Misc 20.9 12.0 3 Well intervention vessel • Nil Amazon Warrior 20.8 15,6 3 8 Seismic Vessel • 1,25 D helideck – Norwegian regulations • Approved for EH 101 outside Norway (LOS clearance for D23) Page 1 of 69 Forward foam monitor platform infringes sector Bridge wings port and starboard sides Misc • MSV • Operations in Norway restricted to max D-value 16.71m Akofs Seafarer Elevator shaft housing 2.4m from sla Vent duct 2m from sla Dangerous Goods not to be shipped from this vessel no qualified person Nil 05 February 2015 14:01:34 HCA HLL Name Amundsen Spirit Apache II D t PRH 20.8 12.8 1 8 20.8 12.8 3 8 Wind Kts 05 February 2015 Mobile Non Compliances Limitation • Tanker with amidships helideck on port side • 2x150 degree Limited Obstacle sectorsTakeoffs & Landings permitted Port and Starboard • Table 1(T&L) to be applied when overflight of decking on starboard side of helideck is unavoidable Misc Pipe laying ship • Table 1 (T) if overflight of either access points unavoidable • Norway 1.25D Requirement, D = 20.88m 150° 5:1 19.5 9.3 3 Artemis Artic 20.9 12.8 3 • Seismic Vessel Artemis Athene 22.2 9,3 SSeismic Vessel • Seismic arrays deployed – Table 1(T&L) regardless of overflight Stowed – No limitation Whenever practical, avoid or minimize overflight of arrays. • Table 1(T) if overflight of aft corners and cable deployment wheel unavoidable • Approved for S92 (12.0t) and EC225 (11.0t) 2 Helideck netting above 25mm adl Nil 5:1 Artemis Angler Port and starboard of helideck Nil Port and starboard walk ways approx 5.3m from edge of SLA Seismic Vessel • Offset aiming circle Approved for EC225 (11t) Nil Page 2 of 69 210° Sig 5:1 Flap dampers (400mm ADL) port and starboard side Seismic arrays when deployed. Aft corners of helideck and cable array deployment wheel 05 February 2015 14:01:34 HCA HLL PRH Wind Kts 05 February 2015 Mobile Name D t Non Compliances Asgard A 23 14 1 Asgard B 23 14 0 Atlantic Explorer 18.9 8.6 5 2 Atlantic Guardian 20.9 12.8 2 Seismic Vessel • Table 1(T) if overflight of ships bow is unavoidable Atlantic Rotterdam 21.4 12.8 0 • Jack-Up • Mandatory Radar Approach required unless rig is within 10nm of platform with compliant meteorological equipment • Stable deck conditions to apply whilst under tow i.e. 1 degree pitch & roll and 2m heave • Table 1(T) if overflight of 5:1 items unavoidable • Obstacle free sector reduced to 190° due to infringement of legs Limitation FPSU • The ship is rotating around a turret-mooring system and will normally be heading into the wind. • Cold flaring may take place at any time. Execute approach with min. 150m horizontal distance to the flare stack. • Night operations: To improve visual references, the ship must be turned 30°-45 Degrees either side out of the wind direction. Seismic Vessel • Table 1(T&L) if overflight of aft decking unavoidable • Seismic arrays deployed – Table 1(T&L) regardless of overflight. Whenever practical, avoid or minimize overflight of arrays • Prohibited landing sector due to only one access point • Possible turbulence from exhausts forward of helideck Page 3 of 69 Sig 5:1 Aft decking Seismic arrays when deployed Sig 5:1 Bow and lightmast 5:1 Misc Outboard emergency access stairs and perimeter netting Non complaint meteorological equipment Comprehensive pitch, roll and heave measuring equipment not available 05 February 2015 14:01:34 HCA HLL Name D t PRH Atlantis Dweller 20.9 12.0 3 Audacia 22.2 12.8 1 Wind BGP Pioneer 21 11.9 2 Non Compliances Limitation • MSV 315-045 Rel to bow Barbaros Hayreddin 21.0 12.0 2 Pasa Kts Nil Pipe Laying Vessel • Table 2 due to superstructure and funnel on starboard side • Table 1(T) if overflight of Taut wire unit unavoidable – unit protrudes out from below the helideck on the port side when lowered • Table 1(T) if overflight of aft foam monitor platform unavoidable • Offset aiming circle • Seismic vessel • Seismic arrays deployed - Table 1(T & L) regardless of overflight stowed - No limitation • Whenever practical, avoid or minimize overflight of arrays Seismic Ship • Seismic arrays - deployed - Table 1(T & L) regardless of overflight - stowed - Table 1 (T) stern mast Whenever practical, avoid or minimize overflight of arrays • Aiming Circle offset due to winches in LOS BGP Prospector 22.8 15.6 3 Seismic Vessel • Nil • Norway – Maximum D value 18.7m Bibby Polaris 19.5 9.2 Ship • Cleared for EC225 (11.0t) 3 05 February 2015 Mobile Page 4 of 69 Sig 5:1 Misc 5:1 Taut wire unit on port side when lowered, Aft foam monitor platform 1.25D Helideck – Not applicable Seismic booms and cable arrays (when deployed) Misc No other significant infringements 150° Winches 1.2m adl 2.2m from SLA 5:1 Sig 5:1 Seismic cable arrays (when deployed) Stern mast (when lowered) Nil Nil 05 February 2015 14:01:35 HCA HLL Name Bibby Sapphire D t PRH 19.5 11.0 3 Wind Kts 05 February 2015 Mobile Non Compliances Limitation Ship Nil Nil Misc Bibby Topaz 20.8 12.8 3 8 DSV Nil Blackford Dolphin 22.2 9.3 • Semi Sub • Table 1(T) if overflight of 5:1 infringements unavoidable • Approved for EC 225 ( 11,0t ) and S92 ( 12,0t) 1 Boa Deep C 19.5 9.3 Boa Galatea 20,8 12,8 2 8 Boa Sub C 3 20.8 11.9 3 m Aiming circle offset Nil 5:1 Ship • Nil • Approved for EC225 (11.0t) Seismic vessel • Cable array sub surface Port access platform Forward access platform Lifeboat station and forward leg - stbd side Nil 210° Minor part of sector forward port side infringed by section of railing and vent pipes (40 cm adl) Misc 1.25D Helideck – Not applicable Multi Service Vessel • S92 limited to 11.9t Page 5 of 69 05 February 2015 14:01:35 HCA HLL Name Bold Tern D t PRH Wind Kts 22.2 12.8 1 05 February 2015 Mobile Non Compliances Limitation Self proplelled Jack up • Daylight only operations • Mandatory Radar Approaches required 210° Status light repeaters in rear access platforms approx 340mm adl Manouvering mast aft port side, approx 500mm adl 5:1 Rear access platforms and vessel structure on port and starboard sides Misc Borgholm Dolphin Borgsten Dolphin 22.2 9.3 22.2 9.3 1 Flotel • Table 1 (t) if overflight of forward access platform or forward, starboard life boat station unavoidable • Approved for EC 225 ( 11,0t ) and S92 ( 12,0t) Offset aiming circle 1 300° - 350° 35 plus Semi Sub alongside Dunbar • Table 1 (T & L) if overflight of winch column assembly and lifeboats unavoidable • Table 2 (T & L) • Cleared for EC 225 (11.0t) and S92 (12.0t) Sig 5:1 19.5 11.2 3 MSV – Ice Breaker • Nil Bourbon Peridot 20.8 12.8 3 8 • Multi Purpose Support Vessel • Operations in Norway restricted to D=16.7m Page 6 of 69 Forward access platform and forward starboard life boat station infringe sector Misc Flotel : check orientation and OFS in relation to adjacent installations 210° • Reduced to 184° by pilot house plus. • Winch column assembly 0.45m adl; lifeboats 0.38m adl; • VHF Aerial attached to windlass housing. Port forward and Port aft foam monitors 38cm adl. • Fwd lifeboat winch assembly 0.5m above deck level 5:1 Botnica When in rest, crane boom and luffing wires on starboard side are on limit of OFS Non-compliant meteorological equipment Obstruction lights on legs u/s Winch column assembly (extends 16m) Lifeboats (fwd) Misc No Planned shutdowns due to lack of tie-down points in deck 150° CO2 wheeled unit in ramp 40 cm adl 05 February 2015 14:01:35 HCA HLL Name Brave Tern Bredford Dolphin D t PRH 22.2 12.8 3 22.2 12.8 1 Wind Kts 05 February 2015 Mobile Non Compliances Limitation Jack up (Ship) Wind Turbine Construction Vessel. • Mandatory ARA required for all operations Misc Semi Submersible Rig • No ground power – caution if shutting down Nil Misc Bucentaur Byford Dolphin 19.5 9.3 22.2 9.3 3 1 Drill Ship • Table 1 (T) if overflight of ship's bow unavoidable Offset aiming circle Semi Sub • Table 1 (T) if overflight of foam monitors unavoidable • Cleared for EC 225 (11.0t) and S92 (12.0t) Sig 5:1 • Pipe laying Ship • Table 1 (T) to be applied if overflight of the bow unavoidable on take off • Cleared for EC225 (11.0t) Page 7 of 69 Ships bow Only 5 tie downs points 210° Satdome Forward infringes sector Chevron to be swung to compensate 5:1 19.5 11.0 3 1.25D Helideck – Not applicable Misc Misc Calamity Jane Vessel may be fixed or floating. Be aware of Crane boom and luffing wires on Starboard side of Helideck which are on limit of OFS when in rest, request crane raised if possible. Fully automated weather monitoring equipment not available on site 5:1 Misc Foam monitor platforms, forward and port Circle offset - to be moved to deck centre and deck painted green before next inspection. H to be swung due to obstruction in 210° sector forward Forward foam monitor platform and forward helideck support structure No other significant infringements 05 February 2015 14:01:35 HCA HLL Name Castoro 7 Castoro Sei D t 22.2 9.3 PRH Wind Kts 22.2 10.0 1 0-15 Castorone CGG Alize Non Compliances Limitation • Lay Barge • Table 1(T) if overflight of Sig 5:1 items unavoidable • Fwd port crane jib to be facing aft or starboard for helicopter operations • Fwd navigation light mast and handrails starboard side to be lowered for helicopter operations • Cleared for EC225 (11.0t) and S92 (12.0t) • Aiming circle offset inboard by 1m sufficient clearence exists 1 22.2 12.8 1 22.2 13.0 2 05 February 2015 Mobile Sig 5:1 Misc 5:1 Aft foam monitor platform Pipe Laying Vessel Table 1 (T) if overflight of forward access unavoidable 5:1 NDB Aerial outboard of forward access platform Seismic • Seismic arrays deployed - Table 1(T & L) regardless of overflight stowed - no limitation Whenever practical, avoid or minimize overflight of arrays 22.2 12.8 1 • 060-170 rel. To rig head • 20-30 • 31-40 • 31-40 • 41 plus No other significant infringements Aiming circle offset by 1m inboard not on center of D-value Lay Barge Table 1 (T) if overflight of the aft foam monitor platform is unavoidable 210° 5:1 Misc COSL Innovator Foam monitor platform forward Deck port & starboard Anchor chains when deployed • Perimeter net supports 400mm above deck level • Emergency hatch covers in deck 30mm adl - highlighted yellow/black Seismic cable arrays (when deployed) Floodlights aft Circle Offset potential for infringements in LOS when cables stowed. • Semi-submersible • All types- Table 2 use 35-45kts limitation • AS332 - Max helipad weight • Other types- Nil Landings • All types – Nil Landings • Turbulence reports by all types to be submitted No starting equipment available Page 8 of 69 05 February 2015 14:01:35 HCA HLL Name COSL Pioneer COSLPromoter D t PRH 22.2 12.8 1 Wind • • 120-170 Rel. to rig hdg 22.2 9.3 20-30 31-40 31-40 41 plus 1 30Knts+ Deep Blue 22.2 9.3 1 0-15 Deep Cygnus 20.8 12.8 3 8 Non Compliances Limitation •Semi Submersible Drilling Rig • All types – Table 2(L&T), derrick structure • Caution if shutting down – No ground power available • 210⁰ OFS swung 10⁰ anti clockwise • Hazard light installed 22.2 12.8 1 060-170 rel. to rig head DCV Balder Kts 05 February 2015 Mobile Misc No ground power on site 210° Crane jibs x 2 when parked in rest. SemiSubmercible • All types- Table 2 use 35-45kts limitation • AS332 - Max helipad weight • Other types- Nil Landings • All types – Nil Landings Turbulence reports by all types to be submitted - No starting equipment available Crane Barge • Table 1(T) to be applied for all operations due to 5:1 infringements all round the deck • See HLL - Part E Annex 5 for other restrictions • Stable deck conditions to apply i.e. maximum of 1 pitch & roll and 2m heave • Cleared for EC225 & S92 • No helicopter operations Ship Cleared for EC225 (11,000kgs) Overflight of forward foam monitor platform to be avoided on take-off • Mandatory ARA required due to inadequate weather reporting system 5:1 Port side - Main deck area, lifeboats and pipe loader (LSS) Starboard side - Deck area, sat' dome, swimming pool Misc No DG by Air to be shipped To/From this installation 150° Handrail aft of helideck 5:1 Misc Foam monitor platforms Full suite of Met Sensors missing. Aiming circle offset obstructions in LOS Helideck net approx 40mm adl No DGs to be received from vessel no shippers/ packers certificates seen MSV •Nil limitation Page 9 of 69 05 February 2015 14:01:35 HCA HLL Name Deep Energy Deep Pioneer D t PRH Wind Kts Non Compliances Limitation 20,8 12.8 3 8 Pipe layer • Nil 19.5 9.3 Ship • Table 1 (T) if overflight of forward navigation mast is unavoidable 3 Misc Deep Vision 19.5 9.3 3 Offshore Construction Vessel • Offset aiming circle - Prohibited landing heading 10 deg each side of helideck heading. Area Marked - Approved for EC225 (11t) Deepsea Aberdeen 20.8 13t 8 1 Semi-Sub • Table 1(T) if overflight of fwd foam monitor platform is unavoidable •No start unit on board, caution if shutting down Deepsea Atlantic 21.4 13 1 115-170º rel. to rig hdg. 05 February 2015 Mobile Semi submersible rig • Table 1(T) to be applied if overflight of forward fire monitor unavoidable • All types - Table 2 (L&T) – Derrick structure • No start unit on board, caution if shutting down Page 10 of 69 1.25D Helideck - Norwegian regulations 5:1 Forward navigation mast, when folded 3.4m from SLA 5:1 Fwd Fire Monitor Platform approx. 3.3m from edge of SLA Port and starboard foam monitor platforms approx. 4m from edge of SLA Various deck structures below helideck starboard side Port flare boom may infringe when deployed Misc Offset Aiming Circle No start unit on board Turbulence reports requested for clad derrick also turbines exhausts between bridge and clad derrick 5:1 Misc Forward foam monitor platform •No start unit 05 February 2015 14:01:35 HCA HLL Name Deepsea Bergen D t 22.2 9.3 PRH 1 Wind Kts 05 February 2015 Mobile Non Compliances Limitation Semi Submersible rig • Table 1(T) if overflight of fwd lifeboat station, port fwd anchor winch, fwd foam monitor platform unavoidable 210° Satellite dome on pilot house marginal infringement of sector starboard side. Crane marginal infringement of sector port side Sig 5:1 Fwd. lifeboat station, Port fwd anchor winch, fwd foam monitor platform • Caution if shutting down, no ground power available • Approved for S92 (11.9t), EC225 (11.0t) Deepwater Asgard 22.2 13t 1 Drillship • Table 1(T&L) if overflight of fwd foam monitor platform port side and starboard side is unavoidable • Mandatory ARA required due to inadequate weather reporting system Misc No Ground Power available on site 210° Foam monitor handles approx 300mm adl Telephone unit fwd access point approx 600mm adl 150° Possible infringement if center doom installed in second sector of LOS 5:1 Deepwater Discovery 22.8 15.0 1 Drill ship • Table 1(T) if overflight of forward 5:1 items unavoidable Misc Full suite of Met Sensors missing 150° Radar dome infringes second sector of LOS 5:1 Deepwater Invictus 22.2 13t 1 Drillship • Table 1(T&L) if overflight of fwd foam monitor platform port side and starboard side is unavoidable • Mandatory ARA required due to inadequate weather reporting system Port, starboard & outboard foam monitor platforms Bridge wings Misc Aiming circle offset 210° Foam monitor handles when fitted approx 300mm adl Telephone unit fwd access point approx 600mm adl 150° Possible infringement if center doom installed in second sector of LOS 5:1 Misc Page 11 of 69 Bridge wings port and starboard sides Various deck structuers Foam monitor platforms are :- Fwd approx 4m to Nav light from the SLA, Starboard access point approx 3.20m from SLA, Port access point approx 3.10 from SLA Bridge wings port and starboard sides Various deck structuers Foam monitor platforms are :- Fwd approx 3.4m to the SLA, Starboard access point approx 3.40m from SLA, Port access point approx 3.20 from SLA Full suite of Met Sensors missing 05 February 2015 14:01:35 HCA HLL Name Deepwater Millennium Dixie Patriot D t 22.8 14 17.4 6.8 6 PRH 1 1 Wind Kts Non Compliances Limitation Drill Ship • Mandatory Radar Approaches required • Prohibited Landing Heading Sector -340 to 020 (relative to ships heading) due to LOS obstruction • Table 1(T) if overflight of 5:1 obstructions unavoidable Jack-up • Landing prohibited unless crane boom/jib and crane rest are clear of the 210 degree. • No helicopter operations whilst on the move • Mandatory ARA to be applied due to non-fitment of automated MET system Edda Fauna 20.8 12.8 3 8 IMR (Inspection/Maintenance/Repair) • Table 1 (T) if overflight of bow section is unavoidable Offset aiming circle Edda Fjord 19.5 9.3 Multi Purpose Vessel • Prohibited landing heading sector +/- 22° relative to vessel heading due to handrail and wheelhouse 3 Edda Flora 20.8 12.8 3 8 • Multi Purpose Service Vessel Edda Fonn 19.5 9.3 Offshore Construction Vessel • Approved for EC 225 (11t) • Offset aiming circle 3 05 February 2015 Mobile Page 12 of 69 150° 5:1 Radome/antenna in second sector of LOS Foam monitor access platforms Misc Non-compliant meteorological equipment No helideck net - approved friction surface 210° Forward Foam monitor approx 650mm adl 150° Forward foam monitor platorm Misc Crane boom/jib may be at rest along starboard side of deck whilst outside of notified helicopter times Sig 5:1 Bow section infringes sector 150° Handrail in front of wheelhouse and starboard side of wheelhouse superstructure 6m from SLA Misc Aiming circle offset due to handrail and wheelhouse 1.25D Helideck - Not applicable 05 February 2015 14:01:35 HCA HLL Name Eirik Raude Elisabeth Knutsen EM Leader Energy Endeavour Ensco 100 D t PRH 22.8 15.0 1 22.8 14.0 1 19.8 9.3 2 20.8 14.6 1 8 22.2 10.0 1 Wind Kts • • • 135-180 rel • 20-30 to rig hdg • 31-40 • 31-40 • 41 plus 05 February 2015 Mobile Non Compliances Limitation Semi Sub • All types - Table 2, use 35-45 kts limitations AS332 - Max helipad weight Other types - Nil landings All types - Nil landings All due to clad derrick. Turbulence report by all types must be submitted • Table 1(T) if overflight of foam monitor platforms. • Until such time as a compliant Status light is fitted a 1.25nm visibility limitation will be placed on this deck Tanker with amidships helideck on port side • Table 1(T) to be applied if overflight of decking starboard, forward and aft of helideck is unavoidable • 2 x 150° LOS Seismic vessel • Table 1(T&L) to be applied if overflight of aft deck and structures is unavoidable • Mast aft of funnel to be lowered for helicopter operations. Top of mast area painted with yellow-black tiger stripes • Trailing cables are sub surface • Approved for EC 225 (11t) 210° 5:1 Starboard crane when in rest Forward foam monitor platforms Lifeboat station starboard side below helideck Various deck structures port side below helideck Misc Numerous tie- downs on deck approx 40mm adl painted red 150° Fixed railings aft of helideck at 1.1m, 2m from helideck Sig 5:1 210° Sig 5:1 Decking starboard, forward and aft of helideck Antennas on aft mast marginal infringement Aft deck area and structures • Jack Up • Table 1(T) if overflight of emergency access outboard is unavoidable • Stable deck conditions to apply whilst on tow i.e. maximum of 1 pitch & roll and 2m heave 210° Marginal Infringement -Jack Housings on top of Fwd and Stbd legs Misc Comprehensive electronic pitch, roll and heave measuring equipment not available on site Deck and Rig height varies due to nature of Jack up rig. No other significant infringements • Jack Up • Table 1(T) if overflight of forward access unavoidable • Stable deck conditions to apply whilst on tow i.e. maximum of 1 pitch & roll and 2m heave • Cleared for EC225 (11.0t) & S92 (11.9t) Misc Page 13 of 69 5:1 Forward access Electronic pitch, roll and heave measuring equipment not available on site 05 February 2015 14:01:35 HCA HLL Name Ensco 101 Ensco 102 D t 22.2 9.3 22.2 9.3 PRH Wind Kts Non Compliances Limitation • Jack up • Stable deck conditions to apply whilst on tow i.e. maximum of 1deg pitch & roll and 2m heave • Cleared for EC225 (11.0t) & S92 (11.9t) 1 1 05 February 2015 Mobile Misc Electronic pitch, roll and heave measuring equipment not available on site Jack Up alongside Jasmine Platform • Both Helidecks in operation without restriction. 210° Clear 5:1 Clear E102: • Stable deck conditions to apply for operations whilst on tow ie maximum 1 pitch & roll and 2m heave. • Cleared for EC225 (11.0t) & S92 (11.9t) Misc • Comprehensive electronic pitch, roll & heave measuring equipment not available on site. Misc Comprehensive electronic pitch, roll & heave measuring equipment not available on site. Non compliant met equipment Aiming circle offset Jasmine: • Table 1(T&L) if overflight of the SE & W monitor platforms is unavoidable Ensco 109 Ensco 120 22.2 9.3 1 Jack Up • Stable deck conditions to apply for operations whilst on tow ie maximum 1 pitch & roll and 2m heave. • Mandatory Radar Approaches required • Approved friction surface - No net 22.2 12.8 1 150° - 210° relative to heading Ensco 122 22.2 12.8 1 Jack up • Table 2 due to superstructure • Jack-up • Table 1(T) is overflight of 5:1 obstructions unavoidable 5:1 Misc Page 14 of 69 Vessel structure Port and Starboard aft of the helideck infringe sector TDPM lighting fitted to deck 05 February 2015 14:01:35 HCA HLL Name Ensco 70 D t 22.2 9.3 PRH Wind Kts 1 0-15 Ensco 80 22.2 9.3 1 Non Compliances Limitation Jack Up - Helideck starboard side • Overflight of outboard foam monitor platform to be avoided on take-off • Stable deck conditions to apply whilst on tow i.e. maximum of 1 deg pitch & roll and 2m heave • Cleared for EC225 (11.0t) & S92 (11.9t) • Caution if overflight of starboard leg (when lowered), zip wire from derrick. • JackUp • Stable deck conditions to apply whilst on tow i.e. maximum of 1 pitch & roll and 2m heave • Aiming Circle offset due to LOS infringements • Cleared for EC225 (11.0t) & S92 (11.9t) Ensco 92 Ernest Shackleton Far Saga 22.2 9.3 1 19.5 10.0 2 19.5 9.3 3 05 February 2015 Mobile • Jack Up • Stable deck conditions to apply whilst on tow i.e. maximum of 1 pitch & roll and 2m heave • Cleared for EC225 (11.0t) & S92 (11.9t) • MSV • Daylight operations only • Port rescue boat to be swung outboard for helicopter operations • PLHS aft starboard corner of deck • Aiming circle offset Offshore Construction Vessel • Offset aiming circle Approved for EC225 (11t) Page 15 of 69 210° Sig 5:1 • Foam monitor handles 350mm adl. Outboard foam monitor platform Misc Electronic pitch, roll and heave measuring equipment not available on site 150° Guardrails and fire extinguishers infringe first sector of LOS Misc Electronic pitch, roll and heave measuring equipment not available Insufficient tie down points Helideck net 35mm adl 150° Fuel hose and baggage storage cupboard 1.1m adl in first sector of LOS Misc Aiming circle offset Electronic pitch, roll and heave measuring equipment not available on site Aiming circle & "H" lighting fitted to deck 150° Aft davit arm and bosun store Misc Inadequate floodlights 210° • Nil 05 February 2015 14:01:35 HCA HLL Name Faxian 6 D t PRH Wind Kts 22.8 15.6 3 Seismic Survey Vessel • Seismic arrays deployed - Table 1(T & L) regardless of overflight stowed - no limitation Whenever practical, avoid or minimize overflight of arrays 22.2 12.8 3 Ice Breaker & MSV Floatel Victory 22.8 15.6 1 Floatel FPSO Aseng 21.0 12.8 1 10+ FPSO Serpentina 22.2 12.9 1 Non Compliances Limitation Fennica 05 February 2015 Mobile • FPSO • Possible Turbulence & High temperatures over the deck from funnel. Turbulence reports requested • Mandatory radar approach for all landings • Stable deck conditions will apply - Maximum of 1° Pitch & Roll and 2m heave • Table 1(T) applies if overflight of 5:1 items is unavoidable FPSO • Possible Turbulence & High temperatures over the deck from funnel. Turbulence reports requested • No helicopter operations when visibility is below 1.25nm • Stable deck conditions - Maximum of 1° Pitch & Roll and 2m heave • Mandatory radar approach for all landings • Table 1(T) applies if overflight of 5:1 items is unavoidable Page 16 of 69 5:1 Seismic arrays when deployed 210° Net if fitted and tie down points (contoured) both 30mm above deck level. 150° Clear 5:1 Clear Misc 2 Large Satdomes on edge of 210° sector No Dangerous Goods by Air to be shipped to/from this Vessel 210° Xenon floodlights 260mm above helideck level Sig 5:1 Misc Main deck Port and Starboard aft of helideck Visibility sensor unserviceable Non compliant HMS No net fitted 210° Co2 Extinguisher 400mm adl handrails Port and Starboard 300mm adl 150° Refuel tank 1.75m from SLA & 75cm adl infringes sector. Dry powder extinguishers 60cm from SLA 50cm adl Sig 5:1 Misc Main deck Port and Starboard aft of helideck. No status light fitted Non-compliant HMS Cloud base sensor unservicable Aiming circle offset No net fitted 05 February 2015 14:01:35 HCA HLL Name Fugro Saltire D t PRH 22.2 12.8 3 Wind Kts 05 February 2015 Mobile Non Compliances Limitation • MSV • Table 1 (t) if 5:1 items unavoidable 5:1 Misc Fugro Symphony 20.8 12.8 3 8 Offshore Construction Vessel • Table 1(T) if overflight of Nav mast unavoidable • According to Norwegian regulations – 1,25 D 21 12 3 Drillship • Exhaust stacks aft/port of helideck. Monitor and report Geco Bluefin 19.5 9.3 3 • Seismic vessel • Allow 15 mins to fold out helideck sections and lower forward mast before operations • Table 1(T) if overflight of forward monitor platform and lowered mast cannot be avoided on take off. Geco Eagle Geco Emerald Geco Topaz 22.2 12.8 3 18.9 9.3 5 3 18.9 9.3 5 3 Seismic vessel • Whenever practical, avoid or minimize overflight of arrays when deployed Seismic vessel • Folding helideck.- 45 min notice required Seismic vessel • Folding helideck - 45 minutes notice required • Table 1(T) if overflight of 5:1 items unavoidable Page 17 of 69 Aiming circle offset Nil 150° 5:1 Fugro Synergy Vessel structure Port and Starboard aft of helideck infringe sector Marginal infringement of vent housing painted in obstruction markings Nav mast when lowered approx 2.8m from edge of SLA Nil 5:1 Forward foam monitorplatform and lowered mast Misc Landing net not fitted Misc Bow navigation mast must be stowed before helicopter operation. Misc Aiming circle offset Sig 5:1 Perimeter net panels aft of deck on port and stbd sides 05 February 2015 14:01:35 HCA HLL Name Geco Triton D t PRH 19.5 11.0 2 Geo Barents 19.5 9.3 3 Geo Caribbean 22.2 12.8 3 Wind Kts Non Compliances Limitation Seismic vessel • 2 x 150 LOS - Take offs & Landings Port and Stbd • When practical, avoid or minimize overflight of arrays when deployed Seismic vessel • Table 1(T) if overflight of 5:1 items unavoidable 20.8 12.8 3 8 Seismic • D=1.25 helideck (physical size 26.1m) Geo Celtic 22.2 12.8 3 Seismic • No limitation Geocean Protis 22.2 12.8 1 • Pipe laying vessel • Stable deck conditions to apply i.e. maximum 1° Pitch & Roll & 2m heave 20.9 12.8 3 Misc Navigation mast and safety rail around perimeter to be removed before helideck operation. Seismic • Offset aiming circle Geo Caspian Geosund 05 February 2015 Mobile 5:1 Port & starboard sides of vessel aft Misc Foremast laid down on forward edge of helideck for heli-ops Misc Not compliant HMS Offshore Construction Vessel / ROV Vessel • Nil Page 18 of 69 05 February 2015 14:01:35 HCA HLL Name D t PRH Wind Kts Non Compliances Limitation Global 1200 22.4 11.0 3 Pipe Layer Table 1 (T) if overflight of forward foam monitor platform unavoidable Approved for EC225 (11t) based on EC225 design and strength calculations GMS Endeavour 6102 19.5 9.3 • Self propelled Jack up • Crane must be raised for helicopter operations • Mandatory ARA required GMS Endurance 6101 19.5 9.3 Grena GSF Arctic III 22.8 15 22.2 9.3 1 • Self propelled Jack up • Crane must be raised for helicopter operations • Mandatory ARA required (see below) 3 1 Tanker • Table 1 (T) to be applied when overflight of decking forward, aft and port side of helideck is unavoidable • 2 x 150° sector helideck • Amidships helideck starboard 1 155-185 Rel to rig head 05 February 2015 Mobile Sig 5:1 Misc 22.2 9.3 1 Non compliant meteorology equpment fitted Nil Sig 5:1 Main deck below Port and Starboard aft of helideck Misc • Mandatory radar approach for all landings when the vessel is not within 10n/m of a platform that can provide a full meteorological service. 150° 5:1 aft sector - Port crane jib 3m adl, starboard crane tower 3m adl, windsock 6m adl Sig 5:1 Main decking port, forward and aft of helideck Misc 1.25D Helideck – Not applicable • Semi-Sub • Table 2 due to turbulence from base of derrick 210° • Table 1 [T] if overflight of 5:1 obstructions unavoidable • Cleared for EC225 (11.0t) and S92 (12.0t) Reduced to 198° by bridge handrail stbd & crane pedestal port Port flare boom support wire when deployed Port fwd NDB ariel arm approx 350mm adl 150° Container aft of helideck approx 5m from edge of SLA and 3m adl 5:1 GSF Galaxy 1 Forward Foam Monitor platform • Cleared for EC225 (11.0t) and S92 (12.0t) Page 19 of 69 Sig 5:1 Column (port fwd) and anchor windlass Port flare boom when deployed Fwd Foam monitor platform 05 February 2015 14:01:35 HCA HLL Name GSF Galaxy II D t 25.4 9.3 PRH 22.2 9.3 1 GSF Monarch 23 1 GSP Falcon GSP Fortuna 20.8 12.9 3 8 22.2 9.3 20.8 9.3t 8 3 Non Compliances Limitation Jack Up • Cleared for EC225 (11.0t) and S92 (12.0t) • 240-305 Rel to rig hdg GSP Bigfoot 1 Kts 1 GSF Galaxy III 12t Wind All All • 11 plus All All 05 February 2015 Mobile 150° Monitor Handles Misc Flare booms when operational Jack Up • Cleared for EC225 (11.0t) and S92 (12.0t) • Possible turbulence from Buzzard flare Turbulence reports requested to assess above 210° Sector infringed by Buzzard Flare boom and accommodation block • Jack Up • Table 2 - Use 35-45Kts limitation EC155 - RTOLW subject to maximum 4500Kg • Table 1 (T) if overflight of 5:1 items unavoidable • Cleared for EC225 (11.0t) and S92 (12.0t) 210° Outboard fire monitors 380mm adl Top of starboard flare boom frame marginally infringes 210 sector 150° Inboard fire monitors 750mm adl in first sector of LOS Pipe Laying Ship • No Landings due obstruction environment • Stable deck conditions to apply due no HMS i.e. maximum of 1 pitch & roll and 2m heave • Pipe Layer • Cleared for EC225 (11.0t) and S92 (12.0t) • Table 1(T) if overflight of 5:1 infringements unavoidable 1 Page 20 of 69 5:1 Bow crane Burner boom (when attached) Misc Turbulence from porta-cabins at rear of deck. 210° Obstructions being removed 150° Obstructions being removed 5:1 Main Deck Port and Stbd Aft Misc 5:1 Aiming circle offset - to be repositioned to deck centre. TD/PM Lighting not installed. No Dangerous Goods by Air to be shipped to / from Ship Port & Starboard access platforms 210° Clear 150° Clear 5:1 Clear 05 February 2015 14:01:35 HCA HLL Name GSP Jupiter D t 18.2 8.6 PRH Wind Kts 1 05 February 2015 Mobile Non Compliances Limitation Jack Up • Stable deck conditions to apply whilst on tow i.e. maximum of 1 degree pitch & roll and 2m heave • Table 1 (T) to be applied if overflight of Fwd emergency exit unavoidable. • Mandatory ARA required for all operations • Possible turbulence from accommodation unit. Turbulence reports requested 210° Floodlights 300mm adl OFS reduced to 197° by Rig Legs Marginal infringement of port leg NDB unit approx 600mm adl beside starboard leg NDB aerial cable port and starboard sides Access handrails port and starboard sides NDB aerial supports approx 330mm adl 150° Access handrails (port & Stbd) and main accommodation block Marginal infringement, aiming circle offset 5:1 GSP Saturn 19 8.6 1 0 - 15 140 - 220 rel All to barge head GSP Uranus Hai Yang Shi You 718 21.3 9.3t 19.5 9.3t 1 2 All All Jack Up • Stable deck conditions to apply whilst on tow i.e. maximum of 1 degree pitch & roll and 2m heave • Overflight of the forward monitor platform to be avoided on take off • Mandatory ARA required for all operations • Possible turbulence from accommodation unit. Turbulence reports requested Jack up • Stable deck conditions to apply whilst on tow i.e. maximum of 1 pitch & roll and 2m heave • Seismic vessel • Seismic arrays: Deployed - Table 1(T & L) regardless of overflight Stowed - No limitation Whenever practical, avoid or minimize overflight of arrays Page 21 of 69 Forward foam monitor platform perimeter net and NDB Aerial Misc Comprehensive electronic P/R/H measuring and Automated weather monitoring equipment not available on site. No Dangerous Goods by Air to be sent to/from this Installation. Marginal infringement of port leg due to incorrect marking on deck 210° Reduced to 197°, Legs port & starboard 150° Access handrails (port & Stbd) - Marginal infringement, aiming circle offset 5:1 Forward foam monitor platform perimeter net and NDB Aerial Misc Comprehensive electronic P/R/H measuring and Automated weather monitoring equipment not available on site. Misc Comprehensive electronic pitch, roll and heave measuring equipment not available on site 210° Clear 150° Clear 5:1 Clear Misc No Dangerous Goods by Air to be shipped to or from this Vessel 05 February 2015 14:01:35 HCA HLL Name D t PRH Hai Yang Shi You 719 19.5 9.3t Hai Yang Shi You 721 22.2 12.8 3 Wind Kts Non Compliances Limitation 0 • Seismic vessel • Seismic arrays deployed – Table 1 (T&L) regardless of overflight Stowed - no limitation Whenever practical, avoid or minimize overflight of arrays • Table 1 (T) if overflight of either aft corner of the deck Hanne Knutsen 22.8 14.3 1 Tanker • Table 1(T) to be applied if overflight of main deck forward, aft and starboard of helideck unavoidable • 2 x 150⁰ LOS • Amidships helideck, port forward Harkand Atlantis 22.2 12.0 3 DSV Harkand Da Vinci 05 February 2015 Mobile 22.2 12.0 2 DSV 210° 5:1 Misc Sig 5:1 20.9 12.0 2 0-15 • Seismic vessel • Seismic arrays deployed – Table 1 (T&L) regardless of overflight Stowed - no limitation Whenever practical, avoid or minimize overflight of arrays • Overflight of either corner aft of deck to be avoided on takeoff Page 22 of 69 Port and Stbd aft corners of the Helideck Ensure Perimeter net securing posts removed - All around deck 90cm high if not. Dangerous Goods not to be accepted for transport by Air. Main deck forward, aft and starboard of helideck 210° Clear 5:1 Clear Misc No Dangerous Goods by Air to be shipped from this vessel 210° Clear 5:1 Clear Misc Harrier Explorer Forward Navigation Mast if not removed Sig 5:1 5:1 Misc No Dangerous goods by Air to be shipped to / from this Vessel Seismic arrays (when deployed) Port and starboard aft corner of underlying deck No other significant infringements 05 February 2015 14:01:35 HCA HLL Name Haven D t PRH 20.8 15.0 1 8 Kts Non Compliances Limitation JackUp Accomodation Rig • Table 1(T) to be used if overflight of access platform is unavoidable • Check height of helideck and height of rig for each new location • Check 210⁰ OFS for each new location, restrictions may apply Havila Phoenix 21.0 12 Havila Subsea 20.8 12.8 3 8 Offshore Construction Vessel Nil According to Norwegian regulations, 1,25 D 20.8 13 8 Rescue Recovery Vessel - RRV • Table 1(T&L) if overflight of aft decking unavoidable Havila Troll 3 Wind 2 05 February 2015 Mobile Subsea Construction Vessel • Table 1(T) if overflight of forward bow area outside SLA is unavoidable 150° Sig 5:1 Forward Access platform Sig 5:1 Forward bow area outside SLA 5:1 210° Sig 5:1 Misc Hermod 22.2 9.3 1 Crane Barge • Table 1(T) to be applied for all operations due to Sig 5:1 ifringements all round the deck See HLL - Part E Annex 5 for other restrictions • Cleared for S92 (12.02t) & EC 225 (11t) Hilda Knutsen 20.8 12.8 1 8 Tanker with amidships helideck on port side • Table 1(T) to be applied if overflight of decking starboard, forward and aft of helideck is unavoidable • 2 x 150° Limited Obstacle Sectors Heated helideck Page 23 of 69 Railings on top of Helideck Control Centre marginal infringement marked in obstruction colours Sig 5:1 5:1 Nil Perimeter net frames 30cm above helideck level Aft deck and structures 1.25D Helideck - Not applicable Port side - Office modules, deck area and life boats Starboard side - Deck area, satellite dome, swimming pool Main deck forward, aft and starboard of helideck 05 February 2015 14:01:35 HCA HLL Name HMS Protector HOS Achiever D t 19.5 9.3 PRH 2 22.2 12.0 3 Wind Kts Non Compliances Limitation Ship • Table 1(t) if overflight of 5:1 items unavoidable MSV • Bow Mounted Helideck • Aiming Circle Offset HOS Bayou 22.2 12.6 3 Offshore Construction Vessel • Blue & amber perimeter lights (US Coast Guard requirement) • ADF Antenna brackets attached to perimeter net frames (perimeter net + brackets – 2,15m) • Table 1(T) to be applied if overflight of brackets unavoidable HOS Iron Horse 22.2 12.0 3 MSV • Nil Hugin Explorer Island Constructor 20.9 12.8 3 22.8 14.6 3 05 February 2015 Mobile • Seismic vessel • Seismic arrays: Deployed - Table 1(T & L) regardless of overflight Stowed - No limitation Whenever practical, avoid or minimize overflight of arrays MOU – Mobile Offshore Unit • Table 1(T) if overflight of forward access platform unavoidable • Possible turbulence from turbine exhaust • Avoid landing with tail rotor in or swinging the tail rotor through a sector of the LOS +/- 45 deg of centreline Page 24 of 69 210° Sig 5:1 • Nil Vessel structure Port and Starboard aft of helideck 210° CO2 unit approx 350mm adl Misc Dangerous goods not to be received from this location no qualified person Fuel system not commissioned Sig 5:1 ADF Antenna brackets infringe sector 210° • Nil 150° Marginal infringement of SAT domes and whip aerials port and starboard sides Misc Aiming circle to remain offset Dangerous goods not to be shipped from this location 5:1 Seismic booms and cable arrays (when deployed) Misc No other significant obstructions 210° • Nil 150° Unconfirmed infringements by bulkhead, equipment, railings and structures 5:1 Forward access platform 05 February 2015 14:01:35 HCA HLL Name Island Crown D t PRH Wind Kts 20.8 12.8 2 8 05 February 2015 Mobile Non Compliances Limitation Accomodation vessel - Helideck Midships • Bridge / gangway on the stern; when lifted off its rest, infringes the OFS. Therefore no helicopter operations permitted when gangway lifted/attached. When stowed in rest position, no restrictions 210° 5:1 Bridge / gangway on the stern; when lifted off its restbed. Main aft deck with bridge / gangway •Table 1(T) to be applied if overflight of main aft deck with bridge / gangway is unavoidable Island Enforcer 20.8 12.8 3 8 MSV with 1.25D deck Nil Island Frontier 22.2 12.8 3 MOU Mobile Offshore Unit • Table 1(T) to be used if overflight of forward access platform unavoidable Island Innovator 22.2 12.8 1 Semi submersible - Mobile Drilling Unit • Table 1(T) if overflight of port forward monitor platform unavoidable • All types - Table 2, use 35-45 kts limitations AS332 - Max helipad weight Other types - Nil landings All types - Nil landings Turbulence reports by all types to be submitted • No start unit, caution if shutting down 110-200° rel 20-30 to rig hdg 31-40 31-40 41 plus Misc Island Performer 20.8 12,8 3 8 Well Intervention Vessel - 1.25D helideck - Norwegian regulations - Table 1(T) if overflight of forward access platform and lower bow section unavoidable Island Pride 20.8 12,8 3 8 Offshore Construction Vessel • 1.25D helideck – Norwegian regulations Page 25 of 69 Sig 5:1 210° D values undersized (60cm ht for Brazil) Forward access platform 3,5m Marginal infringement by forward lifeboat frame and aft ventilation duct Sig 5:1 Port forward monitor platform Sig 5:1 Forward access platform and lower bow section 210° Dome antenna port side marginal infringement 05 February 2015 14:01:35 HCA HLL Name D t PRH Wind Kts Non Compliances Limitation Island Wellserver 22.2 12.8 3 Light Well Intervention Vessel • Table 1(T) to be used if overflight of forward access platform unavoidable Jascon 25 22.2 13.0 3 Pipe Layer Jascon 31 22.2 13t m 3 • MSV Jascon 55 22.2 9.3 3 MSV JB 114 19.5 9.3t 1 Jack Up • Landing prohibited unless crane boom/jib is in the raised position clear of 210 degree. • No helicopter operations whilst on the move JB 115 19.5 9.3 1 05 February 2015 Mobile • Jack Up • Landing prohibited unless crane boom/jib and crane rest are clear of the 210 degree. • No helicopter operations whilst on the move • In the current position at the douglas platform Table 2 applies for both decks in all winds. TLN in place Page 26 of 69 Sig 5:1 Forward access platform 150° Handrails marginal infringement in first sector Rails aft of deck holding several DP sensing antennaes on the edge of the Monkey Island Misc Aiming circle offset due to infringement in LOS Helideck net not fitted at operators request 150° Bridge wall 4m from the SLA, 2m in height, marginally infringe 2nd sector of LOS Misc Aiming circle offset Helideck net removed at operators request Misc Crane boom/jib may be at rest along starboard side of deck whilst outside of notified helicopter times No electronic P/R/H system fitted No helideck net fitted Misc Crane boom/jib may be at rest along starboard side of deck whilst outside of notified helicopter times No helideck net fitted No other significant infringements 05 February 2015 14:01:35 HCA HLL Name JB 117 JB 118 Joseph Plateau D t 19.5 9.3 19.5 9.3 PRH 1 F 22.8 14.6 1 Kommandor Subsea 19 9.3 2 Wind Kts 05 February 2015 Mobile Non Compliances Limitation • Jack Up • Landing prohibited unless crane boom/jib and crane rest are clear of the 210 degree. • No helicopter operations whilst on the move Misc Crane boom/jib may be at rest along starboard side of deck whilst outside of notified helicopter times • Jack Up • Landing prohibited unless crane boom/jib and crane rest are clear of the 210 degree. • No helicopter operations whilst on the move Misc Crane boom/jib may be at rest along starboard side of deck whilst outside of notified helicopter times Helideck net in excess of 25mm adl 210° • Nil Misc 1.25D helideck, Norwegian regulations - max D-value 18.24m 210° Clear 5:1 Clear Dredger • Nil MSV Winching Operations Only Larissa 21.0 12.8 3 • Offshore Construction Vessel • Nil Lay Vessel 108 26.1 12,8 3 Pipe layer - 1.25D helideck, Norwegian regulations - LOS clearance for D 26 Lay Vessel North Ocean 105 20.9 12.8 3 Offshore Construction Vessel • According to Norwegian regulations – D= 1.25 Page 27 of 69 05 February 2015 14:01:35 HCA HLL Name Leiv Eiriksson D t 22.8 15 PRH Wind 1 120-200 rel to rig hdg Lewek Connector Kts 20.8 12.8 3 8 • 20-30 • 31-40 • 31-40 • 41 plus Non Compliances Limitation • Semi-sub • All types - Table 2, use 35-45 kts limitations AS332 - Max helipad weight Other types - Nil landings All types - Nil landings Turbulence reports by all types must be submitted Offshore Construction Vessel • Table 1(T) if overflight of forward access platform unavoidable • 1.25D helideck – Norwegian regulations Lewek Constellation 22.2 12.8 3 05 February 2015 Mobile Pipe Lating Vessel • Table 1(T) if overflight of 5:1 items unavoidable Nil Sig 5:1 5:1 Misc Lewek Express 22.2 9.3 3 Forward access platform Port & Stbd rear access and bridge wings Actual deck size 27.5m octagonal Pipe Layer 5:1 Misc Lewek Inspector 20.8 12.8 3 8 Offshore Construction Vessel • Table 1(T) if overflight of forward access platform unavoidable Loch Rannoch 22.8 14.6 1 • Tanker with amidships helideck on centreline • Table 1(T) to be applied for all operations. • Turbulence due to Bow House 305° - 055° relative to ships heading (Turbulence reports requested) 030-055 305-330 Rel to bow Page 28 of 69 Sig 5:1 5:1 Misc Fwd & starboard access platforms approx 4.70m from edge of SLA; Port approx 4m Access points including the NDB aerials No Qualified Dangerous Goods shipper/packer onboard - No Dangerous Goods by Air to be shipped to/from this vessel. Forward access platform Ships main deck port and starboard side of helideck Helideck painted grey No other significant obstructions 05 February 2015 14:01:35 HCA HLL Name Lorelay D t 22.2 13 PRH Wind Kts Non Compliances Limitation • Pipe Laying Ship • Table 1 (T) if overflight Sig 5:1 items unavoidable 1 Maersk Deliverer 22.8 15.0 1 Semi Sub Maersk Discoverer 22.8 15.0 1 •Semi-Sub •Table 1(T) if overflight of port aft or forward access unavoidable on take off • Wheeled aircraft - No landings due poor friction on Helideck unless a helideck net is fitted. All Maersk Reacher Maersk Recorder Maersk Resilient >30kts 22.8 15.6 1 19.5 9.3 3 Jack Up (MODU) • Table 1(T) if overflight of forward access platform unavoidable • Stable deck criteria to apply for operation whilst under tow i.e. Pitch & Roll maximum 1°, Heave 2m • Status lights fitted 0-15 22.8 15.6 1 05 February 2015 Mobile 5:1 Forward access, bow and lay down platform aft port 5:1 Port aft and fwd access Misc Sig 5:1 Misc Comprehensive electronic pitch, roll and heave measuring equipment not available on site 5:1 Foam monitor platforms (Fwd & Port aft) Jack Up • Avoid overflight of Forward foam monitor platform 5:1 Port & Stbd Aft Foam Monitor Platforms extend 3.6m from SLA. Forward Foam Monitor Platform extends 3m from SLA out to NDB aerials. Port and starboard cranes when in rest Misc 22.8 15.6 1 Forward access platform • Overflight of foam monitor platforms to be avoided on takeoff 0-15 Maersk Resolute If No helideck net fitted beware low friction co-efficient on deck. Fuelling system out of commission Jack Up (MODU) • Table 1(T) if overflight of forward monitor platform and antenna is unavoidable Page 29 of 69 Sig 5:1 Misc No significant infringements Antenna fixtures on forward monitor platform 3m from SLA Comprehensive suite of weather sensors not fitted. 05 February 2015 14:01:35 HCA HLL Name Maersk Resolve Maersk Responder Maersk Valiant Maersk Venturer Maersk Viking Maersk Voyager Mermaid Endurer D t PRH 22.8 15.6 1 19.5 9.3 3 22.8 14.6 1 22.8 14.6 1 22.8 14.6 1 22.8 14.6 0 20.8 12.8 3 8 Wind Kts 05 February 2015 Mobile Non Compliances Limitation Jack Up (MODU) No limitations Misc Cable Laying Vessel • Table 1(T) if overflight of Fwd Foam Monitor platform is unavoidable. Sig 5:1 Misc Helideck net 45mm adl Forward foam monitor platform Ensure Folding Satellite Mast on FWD Monitor platform is lowered before Heliops commence Drill Ship •Table 1(T) if overflight of 5:1 items unavoidable 5:1 Bridge wings on port & starboard sides Forward foam monitor platform Drill Ship •Table 1(T) if overflight of 5:1 items unavoidable 5:1 Bridge wings on port & starboard sides Forward foam monitor platform Drill Ship •Table 1(T) if overflight of 5:1 items unavoidable 5:1 Bridge wings on port & starboard sides Forward foam monitor platform Drill Ship •Table 1(T) if overflight of 5:1 items unavoidable 5:1 Bridge wings on port & starboard sides Forward foam monitor platform • Diving Service Vessel Page 30 of 69 05 February 2015 14:01:36 HCA HLL Name Munin Explorer MV Aberdeen Nansen Spirit Navion Britannia Navion Europa D t 19.5 9.6 22.2 9.3 PRH 2 1 Wind Kts Non Compliances Limitation Seismic • Seismic arrays deployed – Table 1 (T&L) regardless of over flight) stowed - no limitation Whenever practical, avoid or minimize over flight of arrays Tanker with amidships helideck on centre line towards bow 2 x 150° Limited Obstacle Sectors • Landing and take off can be conducted from either port or starboard. Landing to be in accordance with flight manual helipad procedures Take off. Table 1 (T) to be applied 20.8 12.8 1 8 • Tanker with amidships helideck on port side • 2 x 150° Limited Obstacle Sectors - Take offs & Landings permitted Port and Starboard • Table 1 (T&L) to be applied when over flight of decking on starboard side of helideck is unavoidable • D=1.25 according to Norwegian Regulations 22.8 15.0 1 Tanker with amidships helideck on port side • Table 1(T) if overflight of decking unavoidable 22.0 9.3 1 05 February 2015 Mobile Tanker with helideck on centreline • 2 x 150 degree Limited Obstacle Sectors - Take offs & Landings permitted Port and Stbd· • Table 1(T) to be applied if overflight of ships main deck is unavoidable • Approved for S92 at 11.86t and EC 225 (11t) • Mandatory radar approach required Page 31 of 69 Sig 5:1 Misc 5:1 Misc 5:1 150° Seismic booms and cable arrays (when deployed) No Dangerous Goods by Air to be shipped to or from this Vessel Deck either side of helideck No other significant infringements Decking forward, aft and starboard of helideck VOC module 3m adl, 12m aft of helideck Sig 5:1 Main deck forward, starboard and aft of helideck Sig 5:1 Main decking Port and Starboard of helideck Misc Non compliant met equipment 05 February 2015 14:01:36 HCA HLL Name Navion Hispania Navion Oceania Navion Scandia Ndeavor Neptune Naiad Noble Bob Douglas D t 22.8 15 PRH 1 22.8 15.0 1 22.8 15.0 1 20 10 16.0 5.3 3 2 Wind Kts 05 February 2015 Mobile Non Compliances Limitation • Tanker with amidships helideck on port side· • Table 1(T) to be applied if overflight of decking forward, aft and starboard of helideck is unavoidable Tanker with amidships helideck on port side • Table 1(T) to be applied if overflight of ships main deck is unavoidable. • Take off and landings restricted to port side only Tanker with amidships helideck port side • Table 1(T) if overflight of main decking unavoidable • 2 x 150⁰ LOS • VOC unit marked with black-yellow stripes Construction Support Vessel • Daylight Hours only - Helideck lights no on UPS •Table 1(T&L) to be used if overflight of bow sprit unavoidable Seismic • Table 1 (T) to be applied if overflight of aft decking is unavoidable. • Seismic arrays deployed – Table 1 (T&L) regardless of overflight) stowed - No limitation Whenever practical, avoid or minimize overflight of arrays Offset aiming circle 150° Sig 5:1 210° 5:1 150° VOC housing 10m aft of helideck, 3.7m ADL Decking Forward , Aft and starboard of helideck Infringed by voc tank starboard side and bridge aft, floodlight mast, crane and high bow section forward Main decking forward and aft VOC housing 10m aft of helideck, 3.7m ADL Sig 5:1 Main decking forward, aft and starboard of helideck Sig 5:1 Bow sprit extending 10m forward of bow (temporary fitting) Misc Sig 5:1 Helideck lighting not on UPS supply Helideck net when fitted 35mm adl Seismic arrays (when deployed) Aft deck (main working deck) 0 Page 32 of 69 05 February 2015 14:01:36 HCA HLL Name Noble Hans Deul D t 22.2 9.3 PRH Wind Kts 1 Aft (relative) All Noble Paul Romano 18.7 9.3 1 05 February 2015 Mobile Non Compliances Limitation Jack Up • Table 1(T) if overflight of foam monitor platforms is unavoidable. • Table 2 due to wheelhouse and engine exhaust (use 35-45 kts limitations) Turbulence reports requested - Nil reports received. • Stable deck conditions to apply whilst on tow i.e. maximum of 1 degree pitch & roll and 2m heave • Cleared for EC 225 (11.0t) and S92 (12.0t) Semi Sub • Table 1(T) if overflight of 5:1 obstructions unavoidable. 150° Sig 5:1 Misc 5:1 Misc Noble Roger Lewis 22.2 1 Jack Up Nordic Explorer 18.9 8.6 5 2 Seismic vessel • Table 1 (T)) to be applied when over flight of decking and cranes aft of helideck is unavoidable • Seismic arrays deployed, ,Table 1(T&L) regardless of overflight. Whenever practical, avoid or minimize overflight of arrays. • Area of helideck outside SLA marked by red lights • Offset aiming circle • Possible turbulence from exhausts Nordica 22.2 12.8 3 MSV • Nil Normand Baltic 20.8 12.8 3 8 PSV/ROV Survey Vessel Nil Sig 5:1 Port & Starboard foam monitor platforms No Planned shutdowns only 6 tie down points available Forward column and crane Possible turbulance from exhausts behind and below deck Decking and cranes aft of helideck Seismic booms and cable arrays (when deployed) Nil Misc Page 33 of 69 Emergency generator room corner (marginal infringement) Aiming Circle offset to mitigate. • Operations in Norway restricted to max D value 16,71m 05 February 2015 14:01:36 HCA HLL Name D t PRH Wind Kts 3 Non Compliances Limitation Normand Clipper 19.5 9.3 Normand Commander 20,9 12.8 3 Offshore Construction Vessel •Nil Normand Cutter 19.5 9.3 Ship • Nil Normand Fortress 20.9 12.8 3 Ship • Nil 3 0-15 Normand Installer 19.5 9.3 3 3 Nil 210° • DSV • Avoid overflight of either access port & starboard MSV Nil Normand Mermaid 19.5 9.3 Normand Oceanic 20.9 12.8 3 • Offshore Construction Vessel Normand Pioneer 22.2 9.3 • MSV • Table 1 (T) if overflight of forward Nav light approx 2.4m from edge of SLA 3 05 February 2015 Mobile Ship • Nil 5:1 Access platforms port and starboard Misc When net fitted will exceed 25mm adl 210° Clear 5:1 Clear Misc No Dangerous Goods by Air to be shipped To/From this Vessel 210° • Nil 150° Very marginal infringement of Sat dome on the starboard side 5:1 Misc Page 34 of 69 • Nil Forward Nav light approx 2.4m from edge of SLA No DG's to be shipped from this vessel no trained person onboard 05 February 2015 14:01:36 HCA HLL Name Normand Progress Normand Prosper D t 22.2 9.3 PRH 3 20.9 12.8 3 Normand Reach 20.8 16 8 Normand Subsea 22.2 12.8 3 Normand Tonjer 19.5 9.3 3 3 Wind Kts Non Compliances Limitation MSV • Cleared for EC 225 (11.0t) and S92 (12.0t) MSV (ROV/Anchor handling) • Operations I Norway restricted to max D value 16,71m Offshore Construction Vessel - 1.25D helideck - Norwegian regulations - Table 1(T) if overflight of forward access platform unavoidable MSV • Table 1 (T) if overflight of deck area at Port & Stbd aft corners of helideck is unavoidable. DSV • Exhaust turbines aft of helideck. • Table 1(T) if overflight of port and starboard access unavoidable Normand Vision 20.8 15 8 3 Offshore Construction Vessel • LOS Clearance for “D” = 23 • 1.25D helideck – Norwegian regulations North Sea Atlantic 23 3 Offshore Construction Vessel - 1.25D helideck - Norwegian regulations - LOS clearance for D23 - Approved for EH101 outside Norway - Minor parts of floodlights inside landing area ( height 250mm) 15 05 February 2015 Mobile Page 35 of 69 150° Fire extinguisher minor infringement in 1st sector of LOS Radar Dome minor infringement in 2nd sector of LOS Misc Aiming circle offset by 1m outboard Misc Norwegian requirement is 1,25 “D” from 01January 2008 Sig 5:1 5:1 Forward access platform Deck area at Port & Stbd aft corners of helideck Nil 150° Sig 5:1 Misc Turbines marginally infringe sector Port and starboard access points Minor parts of floodlights 05 February 2015 14:01:36 HCA HLL Name D t PRH North Sea Giant 20.8 12.8 3 8 Ocean Guardian 22.8 14.6 1 0 Ocean Nomad 22.2 15.0 1 Ocean Patriot Ocean Pearl 21 12.8 1 19.5 9.3 2 Wind Kts 05 February 2015 Mobile Non Compliances Limitation Offshore Construction Vessel 1.25D helideck - Norwegian regulations • • 185-235 • rel rig hdg. • • 30-45 Semi Sub • Table 2 - derrick structure (use 35-45 kts limitations) Turbulence reports requested to assess above • Table 1 (T) if overflight of the anchor winch housing on starboard fwd leg or Forward liferafts is unavoidable • Helideck Starboard Forward corner Semi Sub • Table 1(T) If overflight of winch house/column and fwd lifeboats unavoidable • Semi-Sub • Table 1(T) if overflight of 5:1 infringements unavoidable Seismic vessel • Take-off and landings over telecom mast, satelite domes and windsock to be avoided • Table 1(T&L) if overflight of main deck area aft unavoidable • No NDB Page 36 of 69 Sig 5:1 210° Anchor winch housing on starboard forward leg. Forward liferafts Reduced to 188° by port crane and vent stack starboard side between helideck and bridge 5:1 Port forward winch housing and stabilization column (forward/port corner) Liferafts (forward/centre) Misc Aiming Circle offset due obstruction in LOS caused by Refuelling Cabinet. No Dangerous Goods by Air to be shipped to/from this Vessel 5:1 210° 5:1 Misc Starboard winch house and access platform Port side life-boat station Telecom mast, satellite domes , windsock 4m adl, 32m aft of helideck Main deck area aft of helideck No NDB fitted 05 February 2015 14:01:36 HCA HLL Name Ocean Princess D t 22.2 9.3 PRH Wind 1 120-170 rel rig hdg Ocean Rig Athena 22.2 12.8 1 Kts 05 February 2015 Mobile Non Compliances Limitation Semi Sub • Table 2 due to cladding at base of derrick • Table 1 (T) if overflight of forward lifeboats, accommodation module, stabilization column & monitor platform unavoidable 210° Sig 5:1 Drillship •Table 1(T) if overflight of 5:1 infringement unavoidable 5:1 Misc Ocean Valiant Ocean Vanguard Ocean Zephyr 23 21.3 1 21.0 9.3 19.5 9.3 1 3 • Semi Sub • Table 1 (T) if overflight of forward foam monitor platform unavoidable. • No ground power available on site Semi Submersible Rig • Table 1(T) applicable if overflight of foam monitor platform unavoidable • 25.2 m helideck restricted to SLA containing D circle of 21m. Red demarkation lights inboard. • OFS restricted to 195° • Approved for S92 – 11.9t, EC225 – 11t MSV • Table 1(T) if overflight of 5:1 infringements unavoidable 5:1 210° Forward lifeboats Fwd port corner of accommodation module Port forward stabilzation column ( includes monitor platform) Rear foam monitor platforms and Bridge wings Forward foam monitor platform Approved friction surface - No net Forward foam monitor platform Restricted by dual agent unit and pipelines port side, and crane starboard side. OFS restricted to 195° Sig 5:1 Forward foam monitor platform Misc 1.25D helideck - Not applicable 150° Radar antenna in second sector of LOS 5:1 Misc Page 37 of 69 Reduced to 199º. Limited by the port crane and the stbd crane jib tip Port & starboard aft access platform Offset aiming circle 05 February 2015 14:01:36 HCA HLL Name D t Oceanic Challenger 20.8 12 8 Oceanic Phoenix PRH 2 20.9 12.8 2 Wind Kts 05 February 2015 Mobile Non Compliances Limitation • Seismic Vessel • Table 1(T&L) to be applied if overflight of aft deck and crane unavoidable • Seismic arrays: deployed - Table 1 (T) regardless of overflight stowed - Table 1 (T) aft deck and crane Whenever practical, avoid or minimize overflight of arrays • Aft crane to be facing aft for helicopter operations 210° Seismic Vessel • Table 1 (T) to be applied if overflight of aft deck unavoidable. • Seismic arrays: Table 1 (T&L) regardless of overflight. Stowed : Table 1 (T) ( aft deck) Whenever practical, avoid or minimize overflight of arrays. 210° Oceanic Sirius 20,8 12,8 3 8 Seismic Vessel • D=1,25 According to Norwegian rules Oceanic Vega 20.8 12.8 3 8 Seismic • Nil OIG Giant II 17.1 5.4t 0 5:1 Sig 5:1 Aft deck and crane Seismic booms & cable arrays (when deployed) Mast with windsock 1,5m adl, 25 m aft of helideck Aft deck area Seismic arrays when deployed Nil 210° Clear 150° Clear Sig 5:1 Misc Page 38 of 69 Aft crane Nil Deck is too small for most Helicopters and it is proposed to change it to a larger version. 05 February 2015 14:01:36 HCA HLL Name Oleg Strashnov Olympic Ares D t 21 12.8 1 20.8 16 8 PRH 3 Kts Non Compliances Limitation • Crane barge • Mandatory radar approaches • Table 1(T) if overflight of Sig 5:1 items unavoidable • Possible turbulence from exhausts aft of helideck on port and starboard sides. Turbulence reports requested. Offshore Construction Vessel • Table 1 (T) if overflight of radar antenna in front of helideck is unavoidable • Approved for EH 101 D22.8 outside Norway, LOS clear Olympic Boa 26.1 16 Olympic Challenger 20.9 12.8 3 Offshore Construction Vessel • No restrictions Olympic Intervention IV 22.2 12.8 0 Multi Purpose Vessel Nil Olympic Triton 3 Wind 22.2 12.8 3 05 February 2015 Mobile Sig 5:1 Misc Sig 5:1 Misc Port & starboard bridge wings and satellite domes Non compliant metrological equipment Aiming circle offset No other significant infringements Radar antenna forward, 2 m below helideck surface 1.25D Helideck - Norwegian regulations Offshore Construction Vessel • LOS Clearance for “D” = 26m • Norway – max D value 20.88m Nil MSV • Table 1(T) if overflight of 5:1 items unavoidable Page 39 of 69 150° Port and starboard walkways approx 2.9m from edge of SLA Misc Potential for NDB aerial port side to whip forward Helideck net if fitted approx 40mm adl Sig 5:1 Port and Starboard access points 05 February 2015 14:01:36 HCA HLL Name Orelia D t PRH Wind Kts 22.2 12.0 3 0-15 Osprey Explorer Pacific Explorer Pacific Khamsin Pacific Orca 20.8 12 8 2 19.5 9.3 2 22 0-15 12.8 1 22.2 12.8 1 05 February 2015 Mobile Non Compliances Limitation DSV - Bow deck When steaming ahead - Cat 3 When steaming astern - Cat 2 • Prohibited landing heading sector - 340-020 degree relative to ships bow & Aiming circle offset due to obstructions in LOS • Overflight of forward access to be avoided on take off • Possible turbulence due to;- Crane & mast structure aft of helideck & Turbine exhausts integral with mast, when steaming astern. Seismic • Overflight of deck structure protrusion on aft port side to be avoided on take off • Seismic arrays deployed – Table 1 (T&L) regardless of overflight • Whenever practical, avoid or minimize overflight of arrays 150° 5:1 Platform on forward edge 5:1 Seismic arrays when deployed Deck structure protrusion on aft port side Seismic Vessel • Seismic arrays Deployed – Table 1(T&L) regardless of over flight Stowed – No limitation • Aft mast to be removed for all heliops Sig 5:1 • Drillship • Table 1(T) of overflight of 5:1 items unavoidable 5:1 Wind turbine Installation Vessel – Jack Up • Table 1(T) if overflight of forward foam monitor platform unavoidable • Check height of helideck and top of installation for each location Page 40 of 69 Fire equipment cabinet, handrail & main mast, marginally infringes sector 210° Sig 5:1 Misc Mast aft on helideck Seismic arrays (when deployed) Fire & Access platforms Forward foam monitor platform (1.25D Helideck - Norway D = 17.76) 05 February 2015 14:01:36 HCA HLL Name Pacific Osprey Paragon B391 Paragon C20051 Paragon C20052 Paragon HZ1 D t PRH 22.2 12.8 1 19.5 9.3 1 22.2 12.8 1 22.2 12.8 1 22.2 12.8 1 Wind Kts 05 February 2015 Mobile Non Compliances Limitation Wind turbine Installation Vessel – Jack Up • Table 1(T) if overflight of forward foam monitor platform unavoidable • Check height of helideck and top of installation for each location • Jack Up • Stable deck conditions to apply whilst on tow i.e. maximum of 1 degree pitch & roll and 2m heave • Red lights at rear of deck to highlight 150 degree obstructions • Jack Up • Table 1(T) if overflight of outboard foam monitor platform unavoidable • Stable deck conditions to apply whilst on tow i.e. maximum of 1° pitch & roll and 2m heave • Jack Up • Table 1(T) if overflight of outboard access is unavoidable • Stable deck conditions to apply whilst on tow. i.e. 1 degree pitch & roll and 2m heave • Jack-Up • Stable deck conditions to apply whilst on tow i.e. maximum of 1 degree pitch & roll and 2m heave Page 41 of 69 210° Sig 5:1 150° 5:1 Magnetic compass housing 25 cm adl, marginal infringement starboard side aft Forward foam monitor and access platform 4m Leg winch motor platforms either side of leg 0.5m overheight Flare boom starboard side (when deployed) Misc Comprehensive electronic pitch, roll and heave measuring equipment not available on site Aiming circle offset 210° Sector reduced to 197° due lifeboat gantry 5:1 Outboard foam monitor platform Misc Comprehensive electronic pitch, roll and heave measuring equipment not available on site Aiming Circle offset 210° Aft starboard leg flare boom attachment frame slightly infringes sector 5:1 Outboard access platform Misc Comprehensive electronic pitch, roll and heave measuring equipment not available on site Aiming circle offset 210° Handrails on forward port & starboard legs slighty infringe sector 150° Second sector of LOS infringed by accommodation Misc Aiming circle offset Comprehensive electronic pitch, roll and heave measuring equipment not available on site 05 February 2015 14:01:36 HCA HLL Name Paragon MSS1 D t 22.2 9.3 PRH Wind Kts 1 • • 160-205 • rel rig hdg Non Compliances Limitation Semi Sub • Table 2 - due to turbulence from base of derrick Turbulence reports requested • Table 1(T) if overflight of fwd lifeboats is unavoidable. • Aiming Circle Offset due to size of name. • Cleared for EC 225 (11.0t) and S92 (12.0t) 120-150 rel to rig hdg • • 20-30 • 31-40 • 31-40 • 41 plus 05 February 2015 Mobile Paul B Loyd Jnr 22.8 21.0 1 Semi Sub • All types - Table 2 (use 35-45 kts limitations) • AS332L - Max helipad weight Other types - Nil landings All types - Nil landings • Table 1(T) if overflight of accommodation modules unavoidable • Helideck forward centre Peary Spirit 20.9 12.8 2 Tanker with amidships helideck on port side •2 x 15 degree Limited Obstacle Sectors - Take offs & Landings permitted Port and Starboard •Table 1 (T&L) to be applied when over flight of decking on starboard side of helideck is unavoidable •D=1,25 according to Norwegian Regulations •Equipped with status lights for gas detection PGS Apollo 20.8 12.8 2 8 • Seismic vessel • Table 1(T) if overflight of stern nav ligts unavoidable • Seismic arrays deployed – Table 1 ( T&L) regardless of overflight Stowed – No limitation. Whenever practical, avoid or minimize overflight of arrays. . Page 42 of 69 5:1 Fwd lifeboat & stowage Sig 5:1 Accommodation modules, starboard & port Sig 5:1 Decking forward, aft and starboard of helideck 5:1 Stern navigation lights on outboard perimeter net frame 05 February 2015 14:01:36 HCA HLL Name D t Pharos 12 3.2 Pieter Schelte Polar Duke PRH 3 22.2 12.8 1 Wind Kts 05 February 2015 Mobile Non Compliances Limitation Ship • Port and starboard cranes to be extended aft for helicopter operations • Operations restricted to daylight only unless windsock illuminated • Pilots to be briefed by Bond Air Services before operating to this helideck Heavy Lift Vessel • Daylight Hours only due to lack of obstruction lights • Mandatory Radar approach due to lack of comprehensive Met Eqpt. • Table 1 (T&L) if overflight of Fwd Bows and other 5:1 infringements are unavoidable. 20.8 12.8 2 8 Seismic Vessel • Seismic arrays - Deployed – Table 1 (T&L) regardless of overflight - Stowed - no limitation Whenever practical, avoid or minimize overflight of arrays Polar King 20.8 12.8 3 8 Construction vessel • Maximum D-value Norway – 16.71m Polar Marquis 19.5 12.8 3 Seismic vessel Page 43 of 69 210° Port and starboard crane marginally infringe sector 150° Port and starboard crane Handrails near port crane Misc Floodlights and perimeter lights inboard of perimeter line all lights 200mm adl. Hinges for perimeter net up to 25cm high Approach line on starboard side for pilots reference 210° Foam Hose box & monitor s/w panel 300mm adl 5:1 Ships bows fwd / Control Boxes / Fwd Foam Monitor Platform 5:1 Seismic Arrays (when deployed ) 05 February 2015 14:01:36 HCA HLL Name Polar Pioneer D t 27.1 22 6 PRH Wind Kts 1 130-185 • 20-30 rel to rig hdg • 31-40 • 31-40 • 41 plus Non Compliances Limitation Semi sub drilling rig • All types - Table 2, use 35-45 kts limitations AS332 - Max helipad weight Other types - Nil landings All types - Nil landings Turbulence reports by all types must be submitted • Table 1 (T & L) to be used if overflight of Lifeboat station Shelter is unavoidable. Table 1(T) to be used if overflight of fwd monitor platform unavoidable. Polar Prince 19.5 10.0 3 MSV - Nil Polar Queen 20,8 12,8 3 8 Offshore Construction Vessel • Operations in Norway restricted to helicopters with max D value 16,71m Polarcus Adira 22.2 12.8 2 Seismic Vessel • Seismic arrays deployed – Table 1 (T&L) . Stowed – no restrictions. Whenever practical, avoid or minimize overflight of arrays. Polarcus Alima Polarcus Amani 22.2 12.1 2 22.2 12.8 2 m 05 February 2015 Mobile • Seismic vessel • Siesmic arrays deployed - Table 1(T & L) regardless of overflight stowed - No limitation • Whenever practical, avoid or minimize overflight of arrays Seismic Vessel • Seismic arrays deployed – Table 1 (T&L) . Stowed – no restrictions. Whenever practical, avoid or minimize overflight of arrays. - For operations in Norway max D value 17.76m Page 44 of 69 210° Sig 5:1 Misc Sig 5:1 Misc 5:1 Misc Sig 5:1 Misc Port and forward foam monitors 90 cm adl Forward lifeboat station Shelter and forward foam monitor platform (1.25D helideck – not applicable) Seismic booms & arrays – ( When deployed ) No other significant infringements Seismic booms and cable arrays (when deployed) No other significant infringements Seismic arrays when deployed No other limitations 05 February 2015 14:01:36 HCA HLL Name D t PRH Wind Kts Non Compliances Limitation Polarcus Asima 22.2 12.1 2 Seismic • Seismic arrays deployed - Table 1(T & L) regardless of overflight stowed - no limitation Whenever practical, avoid or minimize overflight of arrays Polarcus Nadia 22.2 12.1 2 • Seismic vessel • Seismic arrays deployed - Table 1(T & L) regardless of overflight stowed - no limitation Whenever practical, avoid or minimize overflight of arrays Polarcus Naila Posh Xanadu Ramform Atlas Ramform Challenger 22.2 12.1 2 22.2 12.8 1 26.1 16t 3 22.8 15.0 2 05 February 2015 Mobile • Seismic vessel • Seismic arrays deployed - Table 1(T & L) regardless of overflight stowed - no limitation Whenever practical, avoid or minimize overflight of arrays Sig 5:1 Seismic booms and cable arrays (when deployed) 5:1 Seismic booms and cable arrays (when deployed) 5:1 Seismic booms and cable arrays (when deployed) Misc No other significant infringements Flotel • Table 1(T) if overflight of access and deck structures below helideck port and starboard sides are unavoidable 5:1 Access platforms infringes sector. Various deck structures below helideck port and starboard sides Seismic Vessel • Table 1 (T) if overflight of the 5:1 infringements unavoidable 5:1 Bow section forward - Main deck port & starboard aft Misc Foremast to be lowered for all helicopter movements 210° Satelite dome on starboard side of helideck Seismic Vessel • Seismic arrays deployed: Table 1 (T&L) regardless of overflight Stowed: Table 1 (T) if overflight of main deck unavoidable. Whenever practible, avoid overflight of arrays. • Daylight operations only – no UPS • Satelite dome must be lowered for all helicopter operations Page 45 of 69 Sig 5:1 Misc Main deck starboard side Seismic arrays, when deployed Helideck lights and radios not on UPS 05 February 2015 14:01:36 HCA HLL Name Ramform Explorer D t PRH Wind Kts Non Compliances Limitation 23.4 12.8 2 Seismic Vessel • Seismic arrays deployed – Table 1(T&L) regardless of overflight • Seismic arrays stowed – Table 1(T) if overflight of starboard decking unavoidable • W henever practical, avoid or minimize overflight of arrays • Reduced helideck SLA indicated by red lights Ramform Sovereign 26.2 14.6 2 Seismic Vessel • Table 1 (T) if overflight of Main decking and Dome antenna starboard side is unavoidable • Seismic arrays deployed – Table 1 (T&L) regardless of overflight. Stowed – no limitation. Whenever practical, avoid or minimize overflight of arrays. • Automatic Roll Compensated helideck fixed position – NOT operative Ramform Sterling 20.9 14.6 2 6 Seismic Vessel • Table 1 (T) if overflight of Main decking and Dome antenna starboard side is unavoidable • Seismic arrays deployed – Table 1 (T&L) regardless of overflight. Stowed – no limitation. Whenever practical, avoid or minimize overflight of arrays. • Approved for EH101 (except Norway) – adequate clearance in LOS Ramform Titan 26.1 16 Seismic Vessel • Table 1 (T) if overflight of the 5:1 infringements unavoidable 3 05 February 2015 Mobile Page 46 of 69 Sig 5:1 Main deck (stbd) of helideck Seismic arrays (when deployed) Sig 5:1 Seismic arrays - when deployed Main decking starboard side Dome antenna starboard aft corner. ( This antenna is lowered below helideck level during helideck operations) Misc Sig 5:1 (1.25D Helideck - Norway D = 20.96) Seismic arrays - when deployed Main decking starboard side Dome antenna starboard aft corner. ( This antenna is lowered below helideck level during helideck operations) 5:1 Bow section forward - Main deck port & starboard aft Misc Foremast to be lowered prior to helicopter operations 05 February 2015 14:01:36 HCA HLL Name Ramform Valiant Ramform Vanguard Ramform Viking D t 22.8 15 22.8 15 PRH 2 2 22.8 15.0 2 Wind Kts 05 February 2015 Mobile Non Compliances Limitation Seismic Vessel • Seismic arrays deployed – Table 1 (T&L) regardless of over flight Seismic arrays stowed – Table 1 (T) if over flight of starboard main deck is unavoidable Whenever practical, avoid or minimize overflight of arrays • Table 1(T) if overflight of stowed paravans unavoidable Seismic Vessel • Seismic arrays deployed: Table 1 (T&L) regardless of overflight Stowed: Table 1 (T) if overflight of main deck unavoidable. Whenever practible, avoid overflight of arrays. • Satelite dome must be lowered for all helicopter operations Seismic Vessel • Seismic arrays deployed-Table 1(T&L) regardless of overflight Seismic arrays stowed- Table 1(T&L) if overflight of starboard main deck and dome antenna • Table 1(T) if overflight of stowed paravan-door on port side is unavoidable • W henever practical, avoid or minimize over flight of arrays • Daylight operation only (Company restriction) Randgrid 22.2 10.0 1 Tanker with midships helideck, centreline forward • Table 1 (T&L) to be applied for all operations • Approved for S92 (11,9t) and EC225 (11t) • Possible turbulence over bow structure Reef Despina 20.9 12.8 3 • Offshore Construction Vessel Sig 5:1 Misc Sig 5:1 Misc Sig 5:1 Misc Sig 5:1 Satellite dome to be retracted for flying operations Main deck starboard side Seismic arrays, when deployed Helideck lights and radios not on UPS Main deck on starboard side of helideck Seismic arrays ( when deployed ) Paravan-door on port side (if stowed) Satellite dome to be retracted below helideck for helicopter operations Main decking forward, aft, port and starboard of helideck Nil 150° Page 47 of 69 Main deck on starboard side of helideck Seismic arrays ( when deployed ) Paravans on port side when stowed Nil 05 February 2015 14:01:36 HCA HLL Name Regalia D t PRH Wind 21.7 21.0 1 6 055-080 Regina Baltica 19.5 9.3t 1 Kts 05 February 2015 Mobile Non Compliances Limitation Semi submersible - Flotel alongside Montrose A • Bridge linked - Montrose weather to be used for all operations - Montrose deck closed except for SAR emergencies - Table 2 (T&L) due to Turbulence from the Montrose • Table 1 (T) if overflight of Port FWD monitor platform or tip of FWD crane cannot be avoided • 1.25D helideck 210° 5:1 Flotel Fwd crane cable must be slackened before helicopter operations Port fwd foam monitor platform and fwd crane tip Fwd starboard lifeboat station infringes sector Nil 5:1 Clear Rem Etive 20.9 12.8 3 4 MSV Rem Forza 22.2 12.8 3 MSV Nil Rem Gambler 20.9 12.8 3 MSV • Operations Norway restricted to D-value 16.71 Misc 1.25D Helideck - Norway D = 16,71m Offshore Construction Vessel • Max “D” value in Norwegian sector = 17,76m Misc 1.25D Helideck - Norway D = 17.76m Rem Installer Rem Ocean 22.2 12,8 3 20.9 16.0 3 Nil IMR ( Inspection / Maintenance / Repair ) Vessel • Table 1 (T) if overflight of forward access platform unavoidable’ • Heated helideck Page 48 of 69 Sig 5:1 Forward access platform 05 February 2015 14:01:36 HCA HLL Name Rockwater 1 Rockwater 2 D t 22.2 9.3 PRH Wind Kts 3 Non Compliances Limitation Ship • Cleared for EC225 and S92 • No Dangerous Goods to be uplifted from this vessel • DSV • Cleared for EC225 (11.0t) • Table 1 to be applied if overflight of 5:1 obstructions unavoidable. 22.2 11.0 3 05 February 2015 Mobile Nil Misc Aiming circle offset Rail aft of helideck at 1.0m ad 150° Handrail and baggage cage. Foam monitor 2.1m from edge of SLA and approx. 800mm adl . Aiming cirle to remain offset 5:1 Misc Rowan Gorilla V 22.8 21.0 1 0-15 Rowan Gorilla VI Rowan Gorilla VII Rowan Norway 21.7 21 0 22.8 21.0 1 22.2 12.8 1 Jack Up • Overflight of forward foam monitor platform to be avoided on take off • Stable deck conditions to apply whilst on tow i.e. maximum of 1 degree pitch & roll and 2m heave • Caution when approaching from astern flare booms 85ft long either side of rig Jack Up - Table 1(T) if overflight of port or forward access platforms unavoidable - No HMS. Pitch & roll max 1 deg when afloat Jack Up • Table 1(T) if overflight of fwd foam monitor platform cannot be avoided on take off • Stable deck conditions to apply whilst on tow i.e. maximum of 1 deg pitch & roll and 2m heave Jack Up (MODU). • Table 1 (T) if overflight of NDB aerial and monitor platform (Fwd) is unavoidable. Page 49 of 69 5:1 Misc Sig 5:1 Misc 5:1 Sig 5:1 Main deck port and starboard side of helideck approx. 6.5m from edge of SLA Aiming circle offset Forward foam monitor platform Flare booms 85ft long fitted either side of aft legs Port and forward access platforms Comprehensive electronic pitch, roll and heave measuring equipment not available on site Forward foam monitor platform NDB aerial and monitor platform (Fwd). 05 February 2015 14:01:36 HCA HLL Name Rowan Stavanger Rowan Viking D t PRH Wind Kts 22.2 12.8 F 0-15 Safe Astoria Safe Bristolia Safe Caledonia Safe Esbjerg 22.2 12.8 1 25.3 13 1 22.8 15.0 1 Non Compliances Limitation Jack Up Drilling Rig • Overflight of foam monitor platform to be avoided on take off • D=1.25 according to Norwegian Regulations • Stable deck conditions to apply when afoat as no digital instruments for measurement of rig movement,1deg P/R and 1m Heave. 22.2 12.8 1 05 February 2015 Mobile Jack Up • Aiming circle offset due to baggage lift handrail • Overflight of Fwd foam monitor platform is to be avoided on take-off • No HMS stable deck conditions to apply when afloat. • Flotel • Approved Friction surface - No net. Flotel •Table 1(T) if overflight of foam monitor platform unavoidable •Check turbulence sector restrictions when hooked up to platform •1.25D Helideck – Not applicable • Flotel • Table 1(T) to be applied if overflight of 5:1 infringements unavoidable Sig 5:1 Foam Monitor Platform Misc Deck is due to be repainted inside circle is green and outside grey. 150° Baggage lift platform handrail. 5:1 Fwd foam monitor platform and NDB aerial Misc No other significant infringements Misc No helideck net fitted Sig 5:1 Misc 5:1 Misc Starboard foam monitor platform Marginal infringement of 210° sector when gangway stowed on support Port & Stbd lifeboat gantries. Circle appears to be offset inboard due to size of Helideck compared to size of D Circle LOS may be infringed by Helicopter if parked in run-off area. 12.0 0 Page 50 of 69 05 February 2015 14:01:36 HCA HLL Name Safe Scandinavia D t PRH 27.2 21.0 1 Wind Kts Non Compliances Limitation Flotel • Both cranes to be parked with slackened luffing wires for helicopter operations • Table 1(T) if overflight of Sig 5:1 infringements unavoidable • Check turbulence sector restrictions when hooked up to platform Saipem 7000 21.7 25.0 1 Crane Barge • Specific restrictions apply regarding turbulence, see Part E Annex 2 of the Helideck Limitations List Turbulence Reports requested • Table 1 (T) if overflight of Lifeboats or aft foam monitor platform is unavoidable Sanco Spirit 19.5 11.0 2 Seismic Vessel • Table 1 (T) to be applied if overflight of aft deck unavoidable • Seismic booms & arrays deployed: Table 1 (T) regardless of overflight Sanco Star Sanco Swift 19.5 11 3 20.8 14.6 3 8 05 February 2015 Mobile • Seismic vessel • Table 1 (T) to be applied if overflight of helideck aft corners & main deck aft is unavoidable. • Seismic arrays: Deployed - Table 1(T & L) regardless of overflight Stowed - No limitation Whenever practical, avoid or minimize overflight of arrays Seismic Vessel • Nil limitations 210° Sig 5:1 Misc Sig 5:1 210° Sig 5:1 5:1 210° Page 51 of 69 Luffing wires on both cranes marginal infringement when tensioned Foam monitor platforms and superstructure port and stbd Lifeboats aft No other significant infringements Lifeboats (aft) Port & Stbd 79ft below deck level Aft Foam Monitor Platform Minor portion of railings both sides infringe sector. Sector reduced to 208◦ Aft deck Seismic booms & arrays ( When deployed) Aft corners of helideck & main deck aft. Seismic boom and cable arrays (when deployed) Minor sections of railing each side aft of helideck infringe sector 05 February 2015 14:01:36 HCA HLL Name Sanco Sword Scarabeo 8 D t PRH Wind Kts 20.8 12,8 3 8 22,2 12,8 1 Non Compliances Limitation Seismic Vessel • 1.25D helideck – Norwegian regulations • Approved for EH 101 outside Norway (adequate LOS clearance) • • • 120-185 • Rel to rig head • • • 20-30 • 31-40 • 31-40 • 41plus Semi Submersible Rig • Table 1 (T) if overflight of forward foam monitor platform unavoidable • All types - Table 2 – use 35-45kt limitations AS332 - Max landing weight Other types - Nil landings All types - Nil landings Turbulence reports to be submitted for all types • Shutdown not recommended Scott Spirit 20.8 12.8 1 8 Tanker with amidships helideck on port side • 2x 150 degree Limited Obstacle Sectors - Take offs & Landings permitted Port and Starboard • Table 1 (T&L) to be applied when over flight of decking on starboard side of helideck is unavoidable • D=1,25 according to Norwegian Regulations • Equipped with status lights for gas detection Sea Installer 22.2 12,8 1 Jack Up Installation Vessel • Check height of helideck and vessel for each new location Seafox 1 22.2 9.3 • Jack Up • No helicopter operations whilst under tow due to deck being retracted • Approved friction surface - no net F 05 February 2015 Mobile Page 52 of 69 Misc Sig 5:1 Misc Sig 5:1 210° Norway max D value 20.88, deck size 26.1m Forward foam monitor and access platform with wave radar extends 4m from edge of helideck No starting equipment available Decking forward, aft and starboard of helideck Navigation light marginally infringes sector next to the port leg - 1.5m adl 05 February 2015 14:01:36 HCA HLL Name Seafox 4 Seafox 7 Seajacks Hydra Seajacks Kraken Seajacks Leviathan D t 22.2 9.3 19.5 9.3 PRH 1 1 22.2 12,8 1 22.2 12.8 1 22.2 12.6 1 Wind Kts 05 February 2015 Mobile Non Compliances Limitation • Jack Up • Landing prohibited unless crane boom/jib clear of the 210 OFS • Mandatory radar approaches required if not co-located with a metrological compliant equipped platform • Table 1 (T) if overflight of 5:1 obstructions unavoidable • Possible turbulence from legs or accommodation • No helicopter operations whilst under tow due to deck being retracted • Approved friction surface - no net Jack Up • Landing prohibited unless crane boom/jib is in the raised position clear of 210 OFS • Table 1(T) if overflight of 5:1 infringement unavoidable • Operations prohibited whilst on the move 150° 5:1 Temporary crane boom rest infringes second sector of LOS Forward access and platform structure to the rear of the helideck port and starboard sides Misc Non compliant metrological equipment Aiming circle offset 150° Corner of accommodation unit infringes first sector of LOS 5:1 Starboard boom rest Misc Crane boom/jib may be at rest along starboard side of deck outside of notified helicopter flight times. Aiming circle offset Self Propelled Jack-up Vessel • Crane to be swung away from helideck for all helicopter operations Misc Helideck net >25mm adl •Jack-Up • Landing prohibited unless crane boom/jib is in the raised position clear f 210 degree Misc Crane boom/jib may be at rest on port side of deck outside of notified helicopter flight times Aiming circle offset No other significant infringements 4 Legged Jack-uo • Table one (T) if overflight of 5:1 obstructions unavoidable 5:1 Misc Page 53 of 69 •Vessel structure Port and Starboard aft of helideck infringe sector • No dangerous goods by air •No net fitted - approved friction surface 05 February 2015 14:01:36 HCA HLL Name Seajacks Zaratan Seawell Sedco 702 D t PRH Wind Kts 22.2 12.8 1 22.2 9.4 Non Compliances Limitation Jack-Up • Landing prohibited unless crane boom/jib is in the raised position clear of 210 degree • Table 1 (T) if overflight of 5:1 item unavoidable • DSV 22.2 12.8 3 1 05 February 2015 Mobile Semi Sub • Mandatory Radar Approaches • Stable deck conditions to apply: i.e. maximum of 1 pitch & roll and 2m heave • Table 1(T) if overflight of 5:1 items unavoidable • Cleared for the use of S92 Helicopters 5:1 Crane boom/jib may be at rest on starboard side of deck outside of notified helicopter flight times 210° Clear 150° Clear Sig 5:1 Clear Misc Only 6 tie down points 210° Stbd crane cab marginal infringement 150° Crane boom and rest infringe second sector of LOS 5:1 Misc Sedco 704 Sedco 711 22.2 9.3 22.2 21 1 1 • • 205-235 • rel rig hdg • • 30-45 • • 0-15 • • • 205-235 • 30-45 relative to rig heading Semi Sub • Table 2 - derrick structure (use 35-45 kts limitations) Turbulence reports requested • Overflight of the anchor windlass & crane to be avoided on take off • Cleared for EC225 (11.0t) & S92 (12.0t) Semi Sub • Table 2 - derrick structure (use 35-45 kts limitation) Turbulence reports requested • Helideck starboard forward • Cleared for S92 (12.0t) • Table 1(T) if overflight of anchor windlass and crane and fwd lifeboat station cannot be avoided on take-off Page 54 of 69 Starboard crane platform Misc 5:1 Fwd deck and lifeboat station Fwd stbd corner Stb foam monitor platform and deck structure Non compliant meteorological equipment No HMS fitted Anchor windlass & crane Misc Aim circle to remain offset 210° Reduced to 203° by aerials (port side) and crane (stbd side) 5:1 Misc Anchor windlass & crane (stbd fwd) Fwd lifeboat station Tie down points approx 50mm adl 05 February 2015 14:01:36 HCA HLL Name Sedco 712 D t 22.2 21 PRH 1 Wind • • 205-235 • rel rig hdg. Kts • • 30 plus • 05 February 2015 Mobile Non Compliances Limitation Semi Sub • Table 2 - derrick structure (nb reduced w/v) 5:1 Anchor windlass and crane (stbd fwd) • Table 1(T) if overflight of anchor windlass and crane cannot be avoided on take-off Sedco 714 22.2 21 1 • • 205-235 • rel rig hdg. • • 30-45 • • 0-15 Semi Sub • Table 2 - derrick structure (use 35-45 kts) Turbulence reports requested • Overflight of anchor windlass and crane to be avoided on take off 210° 210° Seven Atlantic 22.2 12.8 3 DSV • Nil Seven Borealis 22.2 12.8 1 Multi-Purpose Vessel - Heavy Lift Crane and Pipe layer • Table 1(T) if overflight of 5:1 obstructions is unavoidable • No DG by Air to be shipped to/from this vessel due to no trained staff. Seven Discovery 22.2 9.3 3 Seven Eagle 22.2 12.0 3 5:1 5:1 • Ship • Cleared for EC225 (11.0t) and S92 (12.0t) • Diving / Construction vessel • Table 1 to be applied if overflight of 5:1 obstructions unavoidable. Page 55 of 69 Reduced to 203° by handrails (port fwd) and crane ladder (stbd aft) Anchor windlass and crane (stbd fwd) • Nil Fwd acess Platform and main deck port and stbd aft Nil 5:1 Ship Bow Lifeboats port and starboard aft of helideck 05 February 2015 14:01:36 HCA HLL Name Seven Falcon Seven Inagha Seven Navica D t PRH Wind Kts 20.8 12.8 3 8 17.4 6.4 0 1 19.5 9.3 3 05 February 2015 Mobile Non Compliances Limitation Diving Support Vessel ( DSV ) • Nil Nil Misc 1.25D Helideck - Norwegian regulations • Jack-Up • Stable deck conditions to apply whilst on tow i.e. maximum of 1° pitch & roll and 2m heave • Daylight operations only Misc • Electronic pitch, roll and heave measuring equipment not available on site • No floodlights Cable Layer 150° Handrails just aft of helideck Sat dome on port side nearest the helideck 5:1 Misc Seven Oceans 22.2 12.0 3 0-15 Seven Osprey Seven Pelican 22.2 9.3 19.5 9.3 3 3 Pipe Laying Ship • Overflight of ships bow to be avoided on take-off. • No Dangerous Goods to be uplifted from vessel. • Ship • Table 1(T) if overflight of forward navigation mast unavoidable • Cleared for EC225 (11.0t) & S92 (12.0t) DSV • Table 1 (T) if overflight of deck area forward is unavoidable. • Forward mast must be down for helicopter operations • Cleared for EC225 (11.0t) Page 56 of 69 5:1 Misc 5:1 Misc 5:1 Forward radar on bow approx 2.5m from edge of SLA Offset Aiming Circle Dangerous goods not to be shipped from this location Whip aerials on port and starboard side of bridge potential to whip forward Ships bow No other significant infringements Forward navigation mast when folded No DG by Air to be shipped to or from Vessel unless confirmed that qualified staff are available onboard Deck area forward of helideck 05 February 2015 14:01:36 HCA HLL Name Seven Waves Siem Daya 1 D t PRH 22.2 12.8 3 Wind Kts 05 February 2015 Mobile Non Compliances Limitation Pipe-laying vessel • Table 1(T) if overflight of 5:1 infringements unavoidable 20.8 12.8 3 8 Offshore Construction Vessel • Nil Siem Daya 2 20.8 12.8 3 8 Offshore Construction Vessel • No limitations • 1.25D helideck – Norwegian regulations Siem Marlin 20.9 12.8 3 Multi Service Construction Vessel • Prohibited landing sector 22.5° either side of bow Siem N_Sea 20.9 12.8 3 • MSV • Table 1 (t) if 5:1 obstructions unavoidable 5:1 Misc 1.25D Helideck – Norwegian regulations 150° Railings aft of helideck – at 1.9m, 0.6m above helideck level, 2 antennas on starboard railings 1.1m above helideck level Nil Sig 5:1 Misc Siem Spearfish 20.8 12,8 3 8 Offshore Construction Vessel - "D" =1.25, according to Norwegian regulations - No limitations Siem Stingray 20.8 15 8 Offshore Construction Vessel - 1.25D helideck - Norwegian regulations 3 Page 57 of 69 Main deck port & stbd aft Port and Starboard access points aft of helideck infringe sector Dangerous goods by air prohibited 05 February 2015 14:01:36 HCA HLL Name Simon Stevin D t PRH 22.8 14.6 1 Skandi Acergy 20.9 12 3 Skandi Achiever 20.9 12.8 3 Wind Kts 05 February 2015 Mobile Non Compliances Limitation Fall Pipe and Mining Vessel • Nil limitation • Possible turbulence from exhaust stacks aft of bridge structure 210° Port and starboard masts with wire stays – sector reduced to 194° 150° Wire stays from main nav mast 6m from SLA Offshore Construction Vessel • Nil 210° • Nil DSV • Table 1(T) if overflight of Nav mast unavoidable 210° • Nil 5:1 Skandi Arctic 20.9 12.0 3 DSV No limitation Skandi Carla 19.5 9.3 Construction and Support Vessel • Offset aiming circle Skandi Constructor Skandi Protector 21 3 14.6 3 MSV • Nil Access platforms infringes sector. Approx 2.4m from edge of SLA Nil 150° Nil Sig 5:1 Nil Misc 1.25D Helideck - Not applicable 210° • Nil 150° Satellite domes and superstructure 0 Page 58 of 69 05 February 2015 14:01:36 HCA HLL Name Skandi Seven Skandi Singapore D t PRH Wind Kts 20.9 12.8 3 Non Compliances Limitation Offshore Support and Construction Vessel • Nil 20.8 12.8 3 8 Offshore Construction Vessel Operations in Norway restricted to max D value 16.71 Skandi Skolten 20.8 12.8 3 8 Anchor Handling and Construction Support Vessel • Operations in Norway restricted to max D value 16.71m Songa Dee Misc 1.25D Helideck - Not applicable Misc 1.25D Helideck - Norway D = 16,71m 0 Skandi Skansen Solitaire 05 February 2015 Mobile 27.2 21.0 2 20.8 21.0 1 8 • • • 20 either side of stern • • • • 0-10kts • 11-20kts • 21kts+ Pipe Laying Ship • Table 1 (T) if overflight of forward monitor platform unavoidable • Turbulence from bridge structure when wind is from the stern No restriction Table 2 No landings Turbulence reports requested to assess sector • Mandatory ARA to be applied due to non-fitment of full automated MET system Semi Submersible Drilling Rig • Table 1(T) if overflight of forward access platform is unavoidable • No helicopter start unit – caution if shutting down Page 59 of 69 5:1 Sig 5:1 Forward monitor platform infringes sector- 4.2m from edge of SLA Perimeter net outboard of forward access platform 05 February 2015 14:01:36 HCA HLL Name Songa Trym D t 22.6 9.3 PRH Wind 1 120-155 rel. To rig hdg. Stena Alexita 22.2 12.8 1 Kts 05 February 2015 Mobile Non Compliances Limitation Semi Submersible Rig • Table 1(T) to be applied if overflight of forward foam monitor platform is unavoidable • All types – Table 2(L&T) – Derrick structure • Approved for S92 - 11.9t, EC225 - 11.0t • Caution: Night operations - Area of helideck outside Safe Landing Area marked with green perimeter lights Shuttle tanker with amidships helideck starboard • Table 1(T) to be applied if overflight of main decking port, forward and aft of helideck is unavoidable • 2 x 150⁰ LOS sectors Sig 5:1 150° Sig 5:1 Misc Stena Carron 22.8 14.6 1 Drillship • Table 1 (T) to be applied if overflight of forward foam monitor platform is unavoidable • Beware of whip aerials Port side aft of helideck on approach/landing Stena Don 22.8 14,6 1 Semi submersible drilling rig • Table 1(T) if overflight of port and starboard monitor platforms unavoidable • Marginal infringements in 210° and 150° sectors painted in black and yellow obstruction colours • Helideck area outside SLA indicated by red lights • No External power, caution if shutting down Stena Drillmax 22.2 13.0 1 • Drillship • Table 1 (T) if overflight of any access is unavoidable on take off Page 60 of 69 Sig 5:1 Forward foam monitor platform VOC tank, forward top section and railings (marked with black-yellow stripes) Main decking port, forward and aft of helideck 1.25D Helideck - Not applicable Forward foam monitor platform 210° Marginal infringement by port crane railings, and railings outside wheelhouse starboard. 150° Wheelhouse structure 5m adl, 6.25m from SLA Sig 5:1 5:1 Port and starboard foam monitor platforms Port, starboard, forward access points & bridge wings 05 February 2015 14:01:36 HCA HLL Name Stena Forth D t PRH 22.8 14.6 1 8 Wind Kts Non Compliances Limitation Drillship • Table 1 (T) to be applied if overflight of foam monitor platforms is unavoidable • Mandatory radar approach due to present weather and visibility sensors missing Stena Icemax 22.8 14.6 1 Drillship • Table 1 (T) to be applied if overflight of foam monitor platforms and bridge wings port and starboard is unavoidable Stena Natalita 22.2 10.0 1 Tanker with amidships helideck on starboard side • Table 1 (T) to be applied if overflight of decking port side of helideck is unavoidable. • Approved for EC 225 (11,0t) and S-92 (11,9t) Stena Sirita 22.2 10 Stena Spey 22.2 13.0 1 Stingray 22.2 9.3 1 1 05 February 2015 Mobile Tanker with amidships helideck • Table 1 (T) if overflight of decking forward and aft, port and starboard is unavoidable. • 2 x 150° LOS • Approved for EC225 (11,0t ) and S-92 ( 12,8t ) Semi Sub • Table 1(T) if overflight of anchor windlass and control cabin or lifeboat and stowage unavoidable • Cleared for EC225 (11.0t) & S92 (12.0t) 210° 5:1 All monitors and dry powder extinguishers approx 350mm adl Foam monitor platforms Bridge wings port and starboard sides Misc Present weather and visibility sensors missing 210° Infringed by bridge aft, light mast and VOC tank starboard side aft of helideck and bow with mast forward Sig 5:1 Main deck Port, forward & aft side of helideck. Sig 5:1 Main deck forward and aft, port and starboard of helideck 5:1 Anchor windlass & Control cabin (Starboard fwd) 8m from SLA, various deck structures starboard including starboard access point Access platforms infringes sector. Port side approx 3.8m from edge of SLA Misc 2 circles based on deck centre with radii of 2.5 and 5m for tie downs Flare boom port side maybe an infringement when deployed Misc Approved friction surface - No net Pipe Laying Barge Page 61 of 69 05 February 2015 14:01:36 HCA HLL Name D t Stril Herkules 21 12.8 3 Stril Merkur 21.0 12.8 3 Stril Poseidon PRH Wind Kts Non Compliances Limitation Field Support Vessel • Table 1 (T) to be applied if overflight of bow unavoidable • Folding helideck FSV – Field Support Vessel • Table 1(T) if overflight of forward bow section unavoidable • Port and starboard sides of helideck fold inwards • Approved for S92, EC225, Puma models 20.9 12.0 3 0-15 05 February 2015 Mobile Rescue/Standby Vessel • Table 1(T) if overflight of bow section unavoidable Stril Server 20.8 12.8 3 8 Offshore Construction - ROV Vessel -Helideck centreline displaced 2m towards starboard relative to vessel centreline - Max D value Norwegian sector 16.71m Subsea Viking 19.5 10.0 3 Ship - Cat 3 Swift 10 19.5 11.0 1 Jack Up • Stable deck conditions to apply whilst on tow i.e. maximum of 1º pitch & roll and 2m heave • Crane boom/jib is to raised clear of 210 degree OFS before helicopter operations commence Sig 5:1 Bow area Sig 5:1 Forward bow section Misc Sig 5:1 Inward folding helideck Minor part of bow section infrijges sector Nil Page 62 of 69 Misc Crane boom/jib may be at rest along starboard side of deck whilst outside of notified helicopter times Non compliant HMS system 05 February 2015 14:01:36 HCA HLL Name Swordfish D t PRH 20.9 12.8 3 Wind Kts 05 February 2015 Mobile Non Compliances Limitation MSV • Table 1 (T) to be applied if overflight access platorms unavoidable. 150° 5:1 Thialf 27 21.0 1 • Crane Barge • Table 1 if overflight of 5:1 infringements unavoidable. 20.8 12.8 3 8 • Offshore Supply / ROV Vessel • No Dangerous Goods by Air to be shipped to or from this Vessel. Tog Mor 19.5 11.0 1 •Pipe Laying Vessel • Offset aiming circle • Height of installation with cranes in raised position 265 ft Toisa Conqueror 18.7 9.3 3 Toisa Perseus 19.5 9.2 3 Toisa Pisces 17 5.3 3 MSV • Maximum allowable mass 9.2t (20.300lbs) Ship • Aiming circle offset due to Gyro compass in LOS Page 63 of 69 Port and starboard access platforms Misc No DG's to be received from vessel Port aerial potential to whip forward 210° Stbd crane jib infringes 210° when in rest 5:1 Tidewater Enabler Various items in both sectors - Funnels, windsock, Handrails. PHLS painted on deck Lifeboats (Port & Stbd) Forward foam monitor platform Nil 150° Bridge railings marginal infringement at 6m, 3m above deck level Misc Aiming circle offset 150° Gyro compass in LOS - TD/PM offset 05 February 2015 14:01:37 HCA HLL Name Toisa Proteus Toisa Valiant Toisa Voyager Toisa Wave D t 19.5 9.3 18.7 8.6 18.7 8.6 PRH Wind Kts 3 Non Compliances Limitation MSV • Mandatory Radar Approach due to non-compliant Met system • Stable deck conditions - Maximum of 1° Pitch & Roll and 2m heave due to non-compliant HMS fitted • Aiming circle offset due to obstructions in the LOS 3 MSV • Table 1 (T) if overflight of either access points unavoidable • Forward navigation mast to be lowered for helicopter operations • MSV • Table 1 (T) if overflight of 5:1 items is unavoidable • Forward navigation mast to be lowered for helicopter operations 3 • MPV • Table 1(T) if overflight of either access unavoidable on take off 19.5 12.8 3 Transocean Barents 22.8 14.6 1 105-180° rel. • 20-30 To rig head • 31-40 • 31-40 • 41 plus 05 February 2015 Mobile Semi Submersible Rig • All types - Table 2, use 35-45 kt limitations AS332 - Max helipad weight Other types - Nil landings All types - Nil landings Turbulence reports by all types must be submitted • Table 1(T) if overflight of foam monitor platforms port and starboard is unavoidable • Start unit not available, caution if shutting down Page 64 of 69 150° Foam tank pipeline 400mm adl 1.6m from SLA Misc Non compliant Met system HMS system 210° Non compliant • Nil 5:1 Both access points 5:1 Port and starboard aft access platforms 5:1 Aft access platforms on port and starboard sides 210° Steam de-ice cabinet port side 50cm adl , port and starboard monitors 45cm adl 150° Foam monitor 65cm adl Sig 5:1 Foam monitor platforms port and starboard 05 February 2015 14:01:37 HCA HLL Name Transocean John Shaw Transocean Marianas Transocean Prospect D t 22.2 9.3 22.1 9.3 8 22.2 10 PRH Wind Kts 1 Semi-sub • Mandatory Radar Approaches required • Stable deck conditions to apply. i.e maximum of 1°pitch & roll and 2m heave • Table 1 (T) if overflight of 5:1 infringements unavoidable. 1 Semi Sub • Table 1(T) if overflight of the Forward & Starboard obstructions is unavoidable. • Table 2 due to cladding on and around derrick • Perimeter lights not co-incidental with D Circle on Aft side. 210º sector taken from chevron and perimeter line. • Cleared for EC225 (11,.0t) & S92 (12.0t) 170 - 230 Rel Rig Hdg Transocean Spitsbergen Venturer 22.8 14.6 1 150-225 rel. To helideck hdg (150225 rel. To rig hdg) 16.6 9.3 6 2 Non Compliances Limitation Semi Sub • Table 1(T&L) if overflight of the modules on the Port & Starboard side of helideck is unavoidable. • Aiming Circle offset due to obstructions in the LOS • Cleared for EC225 and S92 1 • 20-30 • 31-40 • 31-40 • 41 plus 05 February 2015 Mobile Semi Submersible Rig • All types - Table 2, use 35-45 kt limitations AS332 - Max helipad weight Other types - Nil landings All types - Nil landings Turbulence reports by all types must be submitted • Table 1(T&L) if overflight of foam monitor platform port side and partly on starboard side is unavoidable • Start unit not available, caution if shutting down Seismic • Seismic arrays deployed - Table 1(T&L) regardless of overflight stowed - No limitation Whenever practical, avoid or minimize overflight of arrays Page 65 of 69 150° Catwalk guardrails & GPU housing 1m from SLA 5:1 Access platform and associated structure either side of helideck 5:1 Lifeboat station Misc 5:1 Non compliant meteorological equipment Non compliant HMS system Approved friction surface - No helideck net Aiming circle offset Forward monitor platform perimeter net & lifeboat station; Starboard accommodation roof & winch housing. Misc Perimeter lights. 210° No significant infringements 150° No significant infringements Sig 5:1 Foam monitor platform port side and partly on starboard side infringes sector. Sig 5:1 Seismic Arrays when deployed 05 February 2015 14:01:37 HCA HLL Name D t PRH Wind Kts Non Compliances Limitation Viking Neptune 20.8 12,8 3 8 Offshore Construction Vessel • According to Norwegian regulations – “D” = 1,25 • No limitations • Heated helideck Viking Poseidon 20.8 12.8 3 8 Offshore Construction Vessel - Displaced aiming circle - Antenna infringes LOS 1.8m aft of deck edge, 1m adl - No limitations Volstad Surveyor Vyacheslav Tikhonov 20.8 12.8 3 8 ROV Survey Vessel • Nil 21 Seismic Vessel • Seismic arrays deployed - Table 1(T) regardless of overflight stowed - No limitation Whenever practical, avoid or minimize overflight of arrays • For all helicopter operations, check stern light mast and davits lowered • Table 1(T) if overflight of lowered stern mast unavoidable 12.0 2 05 February 2015 Mobile Well Enhancer 22.2 12.0 3 MSV Nil Wellservicer 22.2 12.5 3 DSV • No limitations • Status lights installed • 6 tie down points only Nil 150° Sig 5:1 Antenna infringes sector Nil Misc 1.25D Helideck - Not applicable 210° Stern light mast 3.5m adl 150° Port and starboard davits infringe LOS, sector 2 Foam monitors marginal infringement LOS, sector 1 Sig 5:1 Stern light mast extends 3.5m from helideck edge when laid down Seismic booms and cable arrays (when deployed) Nil Page 66 of 69 05 February 2015 14:01:37 HCA HLL Name West Hercules D t PRH Wind Kts 21.3 12.8 1 6 085-185 rel. To rig hdg West Navigator West Phoenix 22.8 14.0 1 22.2 9.3 1 • 120-185 rel to rig Western Patriot 18.7 8.6 2 Semi-Submersible Rig • Table 1(T) if overflight of forward port fire monitor platform unavoidable • All types- Table 2 (L&T) – derrick and superstructure – Turbulence Reports requested to establish limitations • No start unit, caution if shutting down Semi Sub • Table 1(T) if overflight of forward exit/monitor platform is unavoidable • Table 2 due to turbulence from base of derrick 160 - 220 in relation to helideck heading West Venture Non Compliances Limitation Drilling Ship • Table 1(T) to be used if overflight of forward foam monitor platform unavoidable 22.2 13.0 1 • 20-30 • 31-40 • 31-40 • 41 plus 05 February 2015 Mobile Seimi Submersible rig • All types - Table 2, use 35-45 kts limitations AS 332 - Max helipad weight Other types - NIL landings All types - NIL landings Turbulence reports by all types must be submitted • Table1(T) if overflight of forward foam monitor platform unavoidable • Approved for S92 ( 11,9t) and EC225 (11t) • Seismic Vessel • Seismic arrays: Deployed - Table 1(T & L) regardless of overflight Stowed - No limitation Whenever practical, avoid or minimize overflight of arrays • Table 1(T) if overflight of aft edge of deck unavoidable Page 67 of 69 150° Sig 5:1 Bridge structure 6m high at 6m marked in obstruction colours Port forward fire monitor and access platform Misc Helideck net 50mm adl 150° Dome antenna port side at 6.15m, marginal infringement Sig 5:1 Forward foam monitor platform Misc 1.25D helideck - Not applicable 5:1 Misc Forward exit/monitor platform No ground power available on site. Nil Sig 5:1 150° 5:1 Misc Fwd foam monitor platform Cable spoolers and aft of crane pedestal (marked in obstruction colours) marginally infringe sector Seismic booms and cable arrays (When deployed) Deck aft of perimeter line Aiming circle offset due to obstructions in 2nd sector of LOS 05 February 2015 14:01:37 HCA HLL Name Western Regent Western Spirit D t PRH 22.2 12.8 2 22.2 12.8 2 Wind Kts 05 February 2015 Mobile Non Compliances Limitation Seismic Vessel • Table 1 (T) if overflight of aft main deck cannot be avoided • Minor smoke and hot emissions from funnels may occur over the helideck •Seismic Vessel • Seismic arrays deployed - Table 1(T & L) regardless of overflight Stowed - no limitation Whenever practical, avoid or minimize overflight of arrays • Table 1(T) if overflight of aft navigation light mast unavoidable • Offset aiming circle Western Trident 22.8 12.8 3 Seismic • Table 1 (T&L) to be applied when over flight of bow decking is unavoidable WG Cook 20.8 12.8 2 8 • Seismic Vessel • Seismic arrays: Deployed - Table 1(T & L) regardless of overflight Stowed - No limitation Whenever practical, avoid or minimize overflight of arrays WG Magellan 20.8 12.8 2 8 • Seismic Vessel • Seismic arrays: Deployed - Table 1(T & L) regardless of overflight Stowed - No limitation Whenever practical, avoid or minimize overflight of arrays WG Tasman 20.8 12.8 3 8 Seismic •Seismic array Deployed – Table 1 (T &L) regardless of overflight. Stowed – no limitations. Whenever practical, avoid or minimize overflight of arrays Page 68 of 69 Sig 5:1 Main deck aft Misc 1.25D Helideck - Not applicable 150° Crane 6.7m from SLA, >4m Sig 5:1 Seismic arrays when deployed Aft navigation light mast Sig 5:1 Deck area fwd of SLA 150° Spool reels could be an infringement when fitted 5:1 Seismic boom and cable arrays (when deployed) Misc Sig 5:1 150° 5:1 Misc No other significant infringements Seismic boom and cable arrays (when deployed) Spool reels on port side an infringement when fitted Seismic boom and cable arrays (when deployed) Nav mast to be removed prior to heli ops 05 February 2015 14:01:37 HCA HLL Name WG Vespucci Wilhunter D t PRH Wind Kts 05 February 2015 Mobile Non Compliances Limitation 20.8 12.8 2 8 • Seismic Vessel • Seismic arrays: Deployed - Table 1(T & L) regardless of overflight Stowed - No limitation Whenever practical, avoid or minimize overflight of arrays 22.2 12.8 1 • Semi-sub • Table 1(T) if overflight of Sig 5:1 obstructions is unavoidable 5:1 Sig 5:1 Misc Wilphoenix 22.2 9.3 1 • Semi-sub • Table 1(T) if overflight of Sig 5:1 obstructions unavoidable • Cleared for S92 (12.0t) & EC225 (11.0t) 5:1 Misc Page 69 of 69 Seismic boom and cable arrays (when deployed) Platform structure on port and starboard side No other significant infringements Platform structure and lifeboat stanchions on port side, forward foam monitor and platform structure starboard No other significant infringements 05 February 2015 14:01:37
© Copyright 2024 ExpyDoc