Memo
Date
28 January 2014
To
John Ross - Manager Hydrogeology: AGL Upstream Investments Pty Ltd
From
James Duggleby
Ref
2201007A-GGP-FY-Q2
Subject
Gloucester Gas Project - FY14 Q2 Monitoring Update - January 2014
The following presents updated hydrographs for all Gloucester Gas Project groundwater monitoring bores
and hydrograph and salinity traces for surface water monitoring sites for the period to December 2013. Full
analysis and discussion of these results will be presented in the comprehensive 2014 Annual Report which
will detail all groundwater and surface water level and quality results from the 2013/14 monitoring period (to
be submitted September 2014).
For the period:
low level probes were installed (on 03/12/13) at TSW01 and ASW01 below the zero height level of the
gauge boards to capture data during periods of low river flow.
Three Vibrating Wire Piezometers (VWP’s) were installed in the former corehole PL03. Only the two
shallowest VWP’s are operational.
New monitoring sites became operational at Fauklands (2 bores) and Bucketts Way (4 bores) near
Gloucester.
Figures 1 - 6: Groundwater hydrographs for Stage 1 and 2 nested monitoring bore sites
Figure 7: Surface water levels and EC comparison of all monitoring sites
Figures A-1 – A-31: Individual Stage 1 groundwater monitoring bore hydrographs
Figures A-32 – A37: Individual Stage 2 groundwater monitoring bore hydrographs
Figures A-38 – A-45: Individual surface water level and EC monitoring hydrographs
Figures A-46 – A-48: PL03 (Pontilands) VWP hydrographs
Table 1 shows quarterly shallow gas monitoring results from TGMB01 and TGMB02 on the Tiedman
property.
Yours sincerely
2201007A-GGP-FY-Q2:RR/RR: 1/2
James Duggleby
Senior Hydrogeologist
Parsons Brinckerhoff
2201007A-GGP-FY-Q2:RR/RR: 2/2
Table 1 - Shallow gas monitoring
TGMB01
Date/Time
Dip (mBGL) GW level (mAHD)
3/12/2013 9:30 not dipped n/a
Methane (% LEL)
TGMB02
Date/Time
Dip (mBGL) GW level (mAHD)
3/12/2013 9:30 not dipped n/a
Methane (% LEL)
0
0
TGMB01
TGMB02
GL (mAHD) TOC (mAHD)
133.66
134.43
133.83
134.63
S4MB
115.5
400
120
200
Daily rainfall (mm)
-200
01-Nov-13
01-Sep-13
01-Jul-13
01-May-13
01-Mar-13
01-Jan-13
01-Nov-12
01-Jul-12
01-May-12
01-Nov-11
01-May-11
01-Sep-12
0
01-Mar-12
112.5
01-Jan-12
40
01-Sep-11
113.5
01-Jul-11
80
01-Mar-11
114.5
01-Jan-11
Water level (mAHD)
0
Monthly Cumulative Rainfall
Deviation From Mean (CDFM) (mm)
Gloucester Groundwater and Surface Water Monitoring
AGL Upstream Investments Pty Ltd
Daily rainfall
S4MB02 (89 - 95 mbgl) (Leloma - Shallow Rock)
Monthly CDFM
S4MB03 (162 - 168 mbgl) (Jilleon - Cloverdale Coal)
S5MB
115
400
120
130
200
120
114
80
110
100
113
40
90
01-Nov-13
01-Sep-13
01-Jul-13
01-May-13
01-Mar-13
01-Jan-13
01-Nov-12
01-Sep-12
01-Jul-12
01-May-12
01-Mar-12
01-Jan-12
01-Nov-11
01-Sep-11
01-Jul-11
01-May-11
01-Mar-11
0
01-Jan-11
112
Daily rainfall
S5MB02 (110 - 102 mbgl) (Jilleon - Shallow Rock)
Monthly CDFM
S5MB03 (158-164 mbgl) (Jilleon - Roseville Coal)
S5MB01 (52 - 58 mbgl) (Jilleon - Shallow Rock)
Figure 1: S4 and S5 monitoring bores
Daily rainfall (mm)
Water level (mAHD)
0
-200
Monthly Cumulative Rainfall
Deviation From Mean (CDFM) (mm)
S4MB01 (58-64 mbgl) (Leloma - Shallow Rock)
TCMB
115
400
120
200
Daily rainfall (mm)
-200
Daily rainfall
TCMB02 (175 - 181 mbgl) (Leloma - Interburden)
Monthly CDFM
TCMB03 (260 - 266 mbgl) (Jilleon - Cloverdale Coal)
TCMB01 (87 - 93 mbgl) (Leloma - Shallow Rock)
TCMB04 (327 - 333 mbgl) (Jilleon - Roseville Coal)
TTMB
115.3
120
400
200
01-Nov-13
01-Sep-13
01-Jul-13
01-May-13
01-Mar-13
01-Jan-13
01-Nov-12
01-Sep-12
01-Jul-12
01-May-12
01-Mar-12
01-Jan-12
Daily rainfall
TTMB03 (186 - 199 mbgl) (Leloma - Interburden)
Monthly CDFM
TTPB (76 - 88 mbgl) (Leloma - Shallow Rock)
TTMB01 (76 - 88 mbgl) (Leloma - Shallow Rock)
Farley
TTMB02 (76 - 88 mbgl) (Leloma - Shallow Rock)
Figure 2: TCMB and TTMB monitoring bores
Daily rainfall (mm)
0
01-Nov-11
112.3
01-Sep-11
40
01-Jul-11
113.3
01-May-11
80
01-Mar-11
114.3
01-Jan-11
Water level (mAHD)
0
-200
Monthly Cumulative Rainfall
Deviation From Mean (CDFM) (mm)
01-Nov-13
01-Sep-13
01-Jul-13
01-May-13
01-Jan-13
01-Nov-12
01-Jul-12
01-May-12
01-Jan-12
01-Sep-11
01-May-11
01-Mar-13
0
01-Sep-12
112
01-Mar-12
40
01-Nov-11
113
01-Jul-11
80
01-Mar-11
114
01-Jan-11
Water level (mAHD)
0
Monthly Cumulative Rainfall
Deviation From Mean (CDFM) (mm)
Gloucester Groundwater and Surface Water Monitoring
AGL Upstream Investments Pty Ltd
Figure 3: BMB and RMB monitoring bores
BMB02 (124 - 136 mbgl (Leloma - Shallow Rock)
Daily rainfall
RMB01 (42-48 mbgl) (Leloma - Shallow Rock)
Monthly CDFM
RMB02 (85 - 91 mbgl) (Leloma - Shallow Rock)
01-Nov-13
104
80
103
40
102
0
127
126
80
125
40
124
0
Daily rainfall (mm)
120
400
200
0
120
-200
RMB
400
200
0
-200
Monthly Cumulative Rainfall
Deviation From Mean (CDFM) (mm)
BMB
Monthly Cumulative Rainfall
Deviation From Mean (CDFM) (mm)
Monthly CDFM
01-Sep-13
01-Jul-13
01-May-13
01-Mar-13
01-Jan-13
01-Nov-12
01-Sep-12
01-Jul-12
01-May-12
01-Mar-12
01-Jan-12
01-Nov-11
01-Sep-11
01-Jul-11
01-May-11
01-Mar-11
01-Jan-11
Water level (mAHD)
105
Daily rainfall (mm)
BMB01 (15 - 29 mbgl) (Leloma - Shallow Rock)
01-Nov-13
Daily rainfall
01-Sep-13
01-Jul-13
01-May-13
01-Mar-13
01-Jan-13
01-Nov-12
01-Sep-12
01-Jul-12
01-May-12
01-Mar-12
01-Jan-12
01-Nov-11
01-Sep-11
01-Jul-11
01-May-11
01-Mar-11
01-Jan-11
Water level (mAHD)
Gloucester Groundwater and Surface Water Monitoring
AGL Upstream Investments Pty Ltd
WMB
104
400
120
200
Daily rainfall (mm)
-200
01-Nov-13
01-Sep-13
01-Jul-13
01-May-13
01-Mar-13
01-Jan-13
01-Nov-12
01-Sep-12
01-Jul-12
01-May-12
01-Mar-12
01-Jan-12
0
01-Nov-11
101
01-Sep-11
40
01-Jul-11
102
01-May-11
80
01-Mar-11
103
01-Jan-11
Water level (mAHD)
0
Monthly Cumulative Rainfall
Deviation From Mean (CDFM) (mm)
Gloucester Groundwater and Surface Water Monitoring
AGL Upstream Investments Pty Ltd
Daily rainfall
WMB03 (32 - 34 mbgl) (Wenham - Shallow Rock)
Monthly CDFM
WMB04 (67 - 79 mbgl) (Wenham - Shallow Rock)
WMB02 (15 - 21 mbgl) (Wenham - Shallow Rock)
99.5
98.5
98.3
120
400
200
Daily rainfall (mm)
-200
01-Nov-13
01-Sep-13
01-Jul-13
01-May-13
01-Mar-13
01-Jan-13
01-Nov-12
01-Sep-12
01-Jul-12
01-May-12
01-Mar-12
01-Jan-12
0
01-Nov-11
95.3
01-Sep-11
40
01-Jul-11
96.3
01-May-11
80
01-Mar-11
97.3
01-Jan-11
Water level (mAHD)
0
Monthly Cumulative Rainfall
Deviation From Mean (CDFM) (mm)
WKMB
Daily rainfall
WKMB02 (51 - 60 mbgl) (Leloma - Shallow Rock)
Monthly CDFM
WKMB03 (200 - 208 mbgl) (Leloma - Interburden)
WKMB01 (47 - 53 mbgl) (Leloma - Shallow Rock)
WKMB03 (200 - 208 mbgl) (Leloma - Interburden) (manual readings)
Figure 4: WMB and WKMB monitoring bores
Alluvial Monitoring Bores
111
400
120
200
0
80
107
105
40
103
0
01-Nov-13
01-Sep-13
01-Jul-13
01-May-13
01-Mar-13
01-Jan-13
01-Nov-12
01-Sep-12
01-Jul-12
01-May-12
01-Mar-12
01-Jan-12
01-Nov-11
01-Sep-11
01-Jul-11
01-May-11
01-Mar-11
01-Jan-11
101
TMB01 (7 - 10 mbgl) (Alluvium)
AMB01 (8 - 10 mbgl) (Alluvium)
Daily rainfall
TMB02 (9 - 12 mbgl) (Alluvium)
AMB02 (6.5 - 11 mbgl) (Alluvium)
Monthly CDFM
TMB03 (5 - 11 mbgl) (Alluvium)
WMB01 (5 - 8 mbgl) (Alluvium)
Figure 5: Alluvial monitoring bores
Daily rainfall (mm)
Water level (mAHD)
109
-200
Monthly Cumulative Rainfall
Deviation From Mean (CDFM) (mm)
Gloucester Groundwater and Surface Water Monitoring
AGL Upstream Investments Pty Ltd
116
400
120
200
0
80
102
0
Daily rainfall
FKMB01A (44 - 53 mbgl) (Leloma - Shallow Rock)
Monthly CDFM
FKMB01B (140.2 - 149.2 mbgl) (Leloma - Shallow Rock)
BWMB
87
400
120
200
Daily rainfall
BWMB01B (14 - 20 mbgl) (Shallow Rock)
Monthly CDFM
BWMB01C (67.4 - 79.4 mbgl) (Shallow Rock)
BWMB01A (6.5 - 9.5 mbgl) (Alluvium)
BWMB01D (149.6 - 161.6) (Coal)
Figure 6: FKMB and BWMB monitoring bores
Daily rainfall (mm)
0
03-Dec-13
84
26-Nov-13
40
19-Nov-13
85
12-Nov-13
80
05-Nov-13
86
29-Oct-13
Water level (mAHD)
0
-200
Monthly Cumulative Rainfall
Deviation From Mean (CDFM) (mm)
01-Nov-13
01-Sep-13
01-Dec-13
40
01-Oct-13
103
-200
Daily rainfall (mm)
115
01-Aug-13
FKMB01B level (mAHD) FKMB01A level (mAHD)
FKMB
Monthly Cumulative Rainfall
Deviation From Mean (CDFM) (mm)
Gloucester Groundwater and Surface Water Monitoring
AGL Upstream Investments Pty Ltd
Figure 7: Surface water levels and EC
01-Nov-13
01-Sep-13
01-Jul-13
01-May-13
01-Mar-13
01-Jan-13
01-Nov-12
01-Sep-12
01-Jul-12
01-May-12
01-Mar-12
01-Jan-12
01-Nov-11
01-Sep-11
01-Jul-11
01-May-11
01-Mar-11
Electrical conductivity ( S/cm)
108
80
106
40
102
2000
1200
80
800
40
400
0
0
Daily rainfall (mm)
112
Daily rainfall (mm)
01-Nov-13
01-Sep-13
01-Jul-13
01-May-13
01-Mar-13
01-Jan-13
01-Nov-12
01-Sep-12
01-Jul-12
01-May-12
01-Mar-12
01-Jan-12
01-Nov-11
01-Sep-11
01-Jul-11
01-May-11
01-Mar-11
Water level (mAHD)
Gloucester Groundwater and Surface Water Monitoring
AGL Upstream Investments Pty Ltd
120
110
104
0
120
1600
Figure A-1 Groundwater levels and rainfall TMB01
TMB01 - Alluvium
Rainfall
TMB01
Manual dips
106
100
105
80
104.5
104
60
103.5
103
40
Rainfall (mm)
Groundwater level (mAHD)
105.5
102.5
102
20
101.5
0
101
Figure A-2 Groundwater levels and rainfall at TMB02
TMB02 - Alluvium
Rainfall
TMB02
Manual dips
106
100
105
104.5
80
104
60
103.5
103
40
102.5
102
20
101.5
101
Client: AGL Upstream Gas Pty Ltd
Project: 2014 Gloucester Groundwater and Surface Water Monitoring
Location: Gloucester, NSW
0
Rainfall (mm)
Groundwater level (mAHD)
105.5
Figure A-3 Groundwater levels and rainfall at TMB03
TMB03 - Alluvium
Rainfall
TMB03
Manual dips
106
100
105
80
104.5
104
60
103.5
103
40
Rainfall (mm)
Groundwater level (mAHD)
105.5
102.5
102
20
101.5
0
101
Figure A-4 Groundwater levels and rainfall at AMB01
AMB01 - Alluvium
Rainfall
AMB01
Manual dips
106
100
105
104.5
80
104
60
103.5
103
40
102.5
102
20
101.5
101
Client: AGL Upstream Gas Pty Ltd
Project: 2014 Gloucester Groundwater and Surface Water Monitoring
Location: Gloucester, NSW
0
Rainfall (mm)
Groundwater level (mAHD)
105.5
Figure A-5 Groundwater levels and rainfall at AMB02
AMB02 - Aluvium
Rainfall
AMB02
Manual dips
108
100
107
80
106.5
106
60
105.5
105
40
Rainfall (mm)
Groundwater level (mAHD)
107.5
104.5
104
20
103.5
0
103
Figure A-6 Groundwater levels and rainfall at S4MB01
S4MB01 - Shallow rock - Leloma Formation
Rainfall
S4MB01
Manual dips
115
100
114
113
80
112
60
111
110
40
109
108
20
107
106
Client: AGL Upstream Gas Pty Ltd
Project: 2014 Gloucester Groundwater and Surface Water Monitoring
Location: Gloucester, NSW
0
Rainfall (mm)
Groundwater level (mAHD)
116
Figure A-7 Groundwater levels and rainfall at S4MB02
S4MB02 - Shallow rock - Leloma Formation
Rainfall
S4MB02
Manual dips
116
100
115
80
114.5
114
60
113.5
113
40
Rainfalll (mm)
Groundwater level (mAHD)
115.5
112.5
112
20
111.5
0
111
Figure A-8 Groundwater levels and rainfall at S4MB03
S4MB03 - Jilleon Formation - Cloverdale Coal Seam
Rainfall
S4MB03
Manual dips
116
100
115
114.5
80
114
60
113.5
113
40
112.5
112
20
111.5
111
Client: AGL Upstream Gas Pty Ltd
Project: 2014 Gloucester Groundwater and Surface Water Monitoring
Location: Gloucester, NSW
0
Rainfall (mm)
Groundwater level (mAHD)
115.5
Figure A-9 Groundwater levels and rainfall at S5MB01
S5MB01 - Shallow rock - Jilleon Formation
Rainfall
S5MB01
Manual dips
120
80
100
60
90
40
80
70
20
60
0
Rainfall (mm)
Groundwater level (mAHD)
100
110
Figure A-10 Groundwater levels and rainfall at S5MB02
S5MB02 - Shallow rock - Jilleon Formation
Rainfall
S5MB02
Manual dips
115
100
114
113.5
80
113
60
112.5
112
40
111.5
111
20
110.5
110
Client: AGL Upstream Gas Pty Ltd
Project: 2014 Gloucester Groundwater and Surface Water Monitoring
Location: Gloucester, NSW
0
Rainall (mm)
Groundwater level (mAHD)
114.5
Figure A-11 Groundwater levels and rainfall at S5MB03
S5MB03 - Roseville Coal Seam - Jilleon Formation
Rainfall
S5MB03
Manual dips
114
100
113
80
112.5
112
60
111.5
111
40
Rainfall (mm)
Groundwater level (mAHD)
113.5
110.5
110
20
109.5
0
109
Figure A-12 Groundwater levels and rainfall at WMB01
WMB01 - Alluvium
Rainfall
WMB01
Manual dips
110
100
109
108.5
80
108
60
107.5
107
40
106.5
106
20
105.5
105
Client: AGL Upstream Gas Pty Ltd
Project: 2014 Gloucester Groundwater and Surface Water Monitoring
Location: Gloucester, NSW
0
Rainfall (mm)
Groundwater level (mAHD)
109.5
Figure A-13 Groundwater levels and rainfall at WMB02
WMB02 - Shallow rock - Wenhams Formation
Rainfall
WMB02
Manual dips
104
100
103
80
102.5
102
60
101.5
101
40
Rainfall (mm)
Groundwater level (mAHD)
103.5
100.5
100
20
99.5
99
0
Figure A-14 Groundwater levels and rainfall at WMB03
WMB03 - Shallow rock - Wenhams Formation
Rainfall
WMB03
Manual dips
104
100
103
102.5
80
102
60
101.5
101
40
100.5
100
20
99.5
99
Client: AGL Upstream Gas Pty Ltd
Project: 2014 Gloucester Groundwater and Surface Water Monitoring
Location: Gloucester, NSW
0
Rainfall (mm)
Groundwater level (mAHD)
103.5
Figure A-15 Groundwater levels and rainfall at WMB04
WMB04 - Shallow rock - Wenhams Formation
Rainfall
WMB04
Manual dips
104
100
103
80
102.5
102
60
101.5
101
40
Rainfall (mm)
Groundwater level (mAHD)
103.5
100.5
100
20
99.5
0
99
Figure A-16 Groundwater levels and rainfall at RMB01
RMB01 - Shallow rock - Leloma Formation
Rainfall
RMB01
Manual dips
127
100
126
125.5
80
125
60
124.5
124
40
123.5
123
20
122.5
122
Client: AGL Upstream Gas Pty Ltd
Project: 2014 Gloucester Groundwater and Surface Water Monitoring
Location: Gloucester, NSW
0
Rainfall (mm)
Groundwater level (mAHD)
126.5
Figure A-17 Groundwater levels and rainfall at RMB02
RMB02 - Shallow rock - Leloma Formation
Rainfall
RMB02
Manual dips
127
100
126
80
125.5
125
60
124.5
124
40
Rainfall (mm)
Groundwater level (mAHD)
126.5
123.5
123
20
122.5
122
0
Figure A-18 Groundwater levels and rainfall at BMB01
BMB01 - Shallow rock - Leloma Formation
Rainfall
BMB01
Manual dips
105
100
104
103.5
80
103
60
102.5
102
40
101.5
101
20
100.5
100
Client: AGL Upstream Gas Pty Ltd
Project: 2014 Gloucester Groundwater and Surface Water Monitoring
Location: Gloucester, NSW
0
Rainfall (mm)
Groundwater level (mAHD)
104.5
Figure A-19 Groundwater levels and rainfall at BMB02
BMB02 - Shallow rock - Leloma Formation
Rainfall
BMB02
Manual dips
105
100
104
80
103.5
103
60
102.5
102
40
Rainfall (mm)
Groundwater level (mAHD)
104.5
101.5
101
20
100.5
100
0
Figure A-20 Groundwater levels and rainfall at TCMB01
TCMB01 - Shallow rock - Leloma Formation
Rainfall
TCMB01
Manual dips
114.5
100
114
113.5
80
113
60
112.5
112
40
111.5
111
20
110.5
110
Client: AGL Upstream Gas Pty Ltd
Project: 2014 Gloucester Groundwater and Surface Water Monitoring
Location: Gloucester, NSW
0
Rainfall (mm)
Groundwater level (mAHD)
115
Figure A-21 Groundwater levels and rainfall at TCMB02
TCMB02 - Interburden - Leloma Formation
Rainfall
TCMB02
Manual dips
100
114.5
114
80
113.5
113
60
112.5
112
40
Rainfall (mm)
Groundwater level (mAHD)
115
111.5
111
20
110.5
0
110
Figure A-22 Groundwater levels and rainfall at TCMB03
TCMB03 - Cloverdale Coal Seam - Jilleon Formation
Rainfall
TCMB03
Manual dips
115
100
114
113.5
80
113
60
112.5
112
40
111.5
111
20
110.5
110
Client: AGL Upstream Gas Pty Ltd
Project: 2014 Gloucester Groundwater and Surface Water Monitoring
Location: Gloucester, NSW
0
Rainfall (mm)
Groundwater level (mAHD)
114.5
Figure A-23 Groundwater levels and rainfall at TCMB04
TCMB04 - Roseville Coal Seam - Jilleon Formation
Rainfall
TCMB04
Manual dips
115
100
114
80
113.5
113
60
112.5
112
40
Rainfall (mm)
Groundwater level (mAHD)
114.5
111.5
111
20
110.5
110
0
Figure A-24 Groundwater levels and rainfall at TTPB
TTPB - Shallow rock - Leloma Formation
Rainfall
TTPB
Manual dips
116
100
115
114.5
80
114
60
113.5
113
40
112.5
112
20
111.5
111
Client: AGL Upstream Gas Pty Ltd
Project: 2014 Gloucester Groundwater and Surface Water Monitoring
Location: Gloucester, NSW
0
Rainfall (mm)
Groundwater level (mAHD)
115.5
Figure A-25 Groundwater levels and rainfall at TTMB01
TTMB01 - Shallow rock - Leloma Formation
Rainfall
TTMB01
Manual dips
116
100
115
80
114.5
114
60
113.5
113
40
Rainfall (mm)
Groundwater level (mAHD)
115.5
112.5
112
20
111.5
111
0
Figure A-26 Groundwater levels and rainfall at TTMB02
TTMB02 - Shallow rock - Leloma Formation
Rainfall
TTMB02
Manual dips
116
100
115
114.5
80
114
60
113.5
113
40
112.5
112
20
111.5
111
Client: AGL Upstream Gas Pty Ltd
Project: 2014 Gloucester Groundwater and Surface Water Monitoring
Location: Gloucester, NSW
0
Rainfall (mm)
Groundwater level (mAHD)
115.5
Figure A-27 Groundwater levels and rainfall at TTMB03
TTMB03 - Interburden - Leloma Formation
Rainfall
TTMB03
Manual dips
116
100
115
80
114.5
114
60
113.5
113
40
Rainfall (mm)
Groundwater level (mAHD)
115.5
112.5
112
20
111.5
111
0
Figure A-28 Groundwater levels and rainfall at Farley
Farley
Rainfall
Farley
Manual dips
116
100
115
114.5
80
114
60
113.5
113
40
112.5
112
20
111.5
111
Client: AGL Upstream Gas Pty Ltd
Project: 2014 Gloucester Groundwater and Surface Water Monitoring
Location: Gloucester, NSW
0
Rainfall (mm)
Groundwater level (mAHD)
115.5
Figure A-29 Groundwater levels and rainfall at WKMB01
WKMB01 - Shallow rock - Leloma Formation
Rainfall
WKMB01
Manual dips
99
100
98
80
97.5
97
60
96.5
96
40
Rainfall (mm)
Groundwater level (mAHD)
98.5
95.5
95
20
94.5
0
94
Figure A-30 Groundwater levels and rainfall at WKMB02
WKMB02 - Shallow rock - Leloma Formation
Rainfall
WKMB02
Manual dips
99
100
98
97.5
80
97
60
96.5
96
40
95.5
95
20
94.5
94
Client: AGL Upstream Gas Pty Ltd
Project: 2014 Gloucester Groundwater and Surface Water Monitoring
Location: Gloucester, NSW
0
Rainfall (mm)
Groundwater level (mAHD)
98.5
Figure A-31 Groundwater levels and rainfall at WKMB03
WKMB03 - Deards Coal Seam - Leloma Formation
Rainfall
WKMB03
Manual dips
102
120
101
100.5
100
80
100
99.5
60
99
98.5
98
40
20
97.5
97
Client: AGL Upstream Gas Pty Ltd
Project: 2014 Gloucester Groundwater and Surface Water Monitoring
Location: Gloucester, NSW
0
Rainfall (mm)
Groundwater level (mAHD)
101.5
Figure A-32 Groundwater levels and rainfall FKMB01A
FKMB01A
Rainfall
FKM01A
Manual Dips
120
118
100
117
116.5
80
116
60
115.5
115
40
114.5
114
Rainfall (mm)
Groundwater level (mAHD)
117.5
20
113.5
0
113
Figure A-33 Groundwater levels and rainfall at FKM01B
FKMB01B
Rainfall
FKM01B
Manual Dips
105
120
104
103.5
100
80
103
102.5
60
102
101.5
101
40
20
100.5
100
Client: AGL Upstream Gas Pty Ltd
Project: 2014 Gloucester Groundwater and Surface Water Monitoring
Location: Gloucester, NSW
0
Rainfall (mm)
Groundwater level (mAHD)
104.5
Figure A-34 Groundwater levels and rainfall at BWMB01A
BWMB01A
Rainfall
BWMB01A
Manual Dips
120
88
100
87
86.5
80
86
60
85.5
85
40
84.5
84
Rainfall (mm)
Groundwater level (mAHD)
87.5
20
83.5
0
83
Figure A-35 Groundwater levels and rainfall at BWMB01B
BWMB01B
Rainfall
BWMB01B
Manual Dips
120
87.5
87
86.5
100
80
86
85.5
60
85
84.5
84
40
20
83.5
83
Client: AGL Upstream Gas Pty Ltd
Project: 2014 Gloucester Groundwater and Surface Water Monitoring
Location: Gloucester, NSW
0
Rainfall (mm)
Groundwater level (mAHD)
88
Figure A-36 Groundwater levels and rainfall at BWMB01C
BWMB01C
Rainfall
BWMB01C
Manual Dips
120
87.5
100
87
86.5
80
86
60
85.5
85
40
84.5
84
Rainfall (mm)
Groundwater level (mAHD)
88
20
83.5
0
83
Figure A-37 Groundwater levels and rainfall at BWMB01D
BWMB01D
Rainfall
BWMB01D
Manual Dips
120
87.5
87
86.5
100
80
86
85.5
60
85
84.5
84
40
20
83.5
83
Client: AGL Upstream Gas Pty Ltd
Project: 2014 Gloucester Groundwater and Surface Water Monitoring
Location: Gloucester, NSW
0
Rainfall (mm)
Groundwater level (mAHD)
88
Figure A-38 Stream levels and rainfall at TSW01
108
107
100
106
Stream level (m AHD)
104
60
103
102
40
101
100
20
99
98
0
Rainfall
TSW01
Manual readings
Client: AGL Upstream Gas Pty Ltd
Project: 2014 Gloucester Groundwater and Surface Water Monitoring
Location: Gloucester, NSW
Zero gauge height
TSW01 (low level logger)
Rainfall (mm)
80
105
Figure A-39 Stream levels and rainfall at TSW02
108
107
100
80
105
104
60
103
102
40
101
100
20
99
98
0
Rainfall
TSW02
Client: AGL Upstream Gas Pty Ltd
Project: 2014 Gloucester Groundwater and Surface Water Monitoring
Location: Gloucester, NSW
Manual readings
Zero gauge height
Rainfall (mm)
Stream level (m AHD)
106
Figure A-40 Stream levels and rainfall at ASW01
108
107
100
106
Stream level (m AHD)
104
60
103
102
40
101
100
20
99
98
0
Rainfall
ASW01
Client: AGL Upstream Gas Pty Ltd
Project: 2014 Gloucester Groundwater and Surface Water Monitoring
Location: Gloucester, NSW
Manual readings
Zero gauge height
ASW01 (low level logger)
Rainfall (mm)
80
105
Figure A-41 Stream levels and rainfall at ASW02
112
111
100
110
Stream level (m AHD)
108
60
107
106
40
105
104
20
103
102
0
Rainfall
ASW02
Client: AGL Upstream Gas Pty Ltd
Project: 2014 Gloucester Groundwater and Surface Water Monitoring
Location: Gloucester, NSW
Manual readings
Zero gauge height
Rainfall (mm)
80
109
Figure A-42 EC and rainfall at TSW01
1400
100
1200
EC (microS/cm)
800
60
600
40
400
20
200
0
0
Rainfall
TSW01
Client: AGL Upstream Gas Pty Ltd
Project: 2014 Gloucester Groundwater and Surface Water Monitoring
Location: Gloucester, NSW
Manual readings
TSW01 (low level probe)
Rainfall (mm)
80
1000
Figure A-43 EC and rainfall at TSW02
2000
100
1800
1600
EC (microS/cm)
1200
60
1000
800
40
600
400
20
200
0
0
Rainfall
Client: AGL Upstream Gas Pty Ltd
Project: 2014 Gloucester Groundwater and Surface Water Monitoring
Location: Gloucester, NSW
TSW02
Manual readings
Rainfall (mm)
80
1400
Figure A-44 EC and rainfall at ASW01
1400
100
1200
80
EC (microS/cm)
1000
800
60
600
40
400
20
200
0
0
Rainfall
ASW01
Client: AGL Upstream Gas Pty Ltd
Project: 2014 Gloucester Groundwater and Surface Water Monitoring
Location: Gloucester, NSW
Manual readings
ASW01 (low level probe)
Figure A-45 EC and rainfall at ASW02
1400
100
1200
80
EC (microS/cm)
1000
800
60
600
40
400
20
200
0
0
Rainfall
Client: AGL Upstream Gas Pty Ltd
Project: 2014 Gloucester Groundwater and Surface Water Monitoring
Location: Gloucester, NSW
ASW02
Manual readings
Figure A-46 Piezometric levels and rainfall at PL03 Piezo V2
Pontilands 3 - V2: 496 mbgl
107.5
120
107
Piezometric Head (mAHD)
106
80
105.5
105
60
104.5
40
104
103.5
Daily Rainfall (mm)
100
106.5
20
103
102.5
0
Rainfall
Bowens Road Coal Seam (V2)
2-hourly Mov. Avg.
Figure A-47 Piezometric levels and rainfall at PL03 Piezo V3
Pontilands 3 - V3: 462 mbgl
120
107.5
107
Piezometric Head (mAHD)
106
80
105.5
60
105
104.5
40
104
103.5
20
103
0
102.5
Rainfall
Wards River Conglomerate (V3)
Client: AGL Upstream Investments Pty Ltd
Project: 2014 Gloucester Groundwater investigation and monitoring
Location: Gloucester, NSW
2 hourly Mov. Avg.
Daily Rainfall (mm)
100
106.5
Figure A-48 Piezometric levels and rainfall at PL03
Pontilands 3
120
116
114
100
80
110
60
108
106
40
104
20
102
0
100
Rainfall
Bowens Road Coal Seam (V2)
Wards River Conglomerate (V3)
Client: AGL Upstream Investments Pty Ltd
Project: 2014 Gloucester Groundwater investigation and monitoring
Location: Gloucester, NSW
Ground level
Daily Rainfall (mm)
Piezometric Elevation (mAHD)
112