CRISTINA MENCHERO

CRISTINA MENCHERO
BSc + MSc Geology. Universidad Complutense de Madrid. 2008
GEOLOGIST
Email:
Postgraduate
Courses:
[email protected]
Ms. Menchero has attended to several courses of specialization:
2009
Course: Autocad
2009
Certificate Course in water and sanitation projects in development cooperation
2008
Course: assessment of the condition and pollution of groundwater
2008
Course analyst laboratory geotechnical tests
Professional
experience:
2010 - to date
2008
SUBTERRA INGENIERIA: Geologist
Repsol YPF: Geologist
Specific experience: Ms. Menchero has 6 years of experience of geologist.
The professional activity of Ms. Menchero started in 2006 in the field of the applied Geology and she has
been developed, specially, in the field of the Geotechnical Engineering. In this last branch, Ms. Menchero
has been involved in numerous projects and geotechnical studies (railways, roads, hydraulics projects
and mining) with a special emphasis in tunneling and underground works.
Ms. Menchero has international experience and he has participated in projects in Spain, Peru and Chile.
I+D+i Projects:
Year 2008
Project "Study of the origin of H2S in the field of Loma Alta, Argentina."
Developed with Grant of geology labs of Universidad Herni Poincaré of Nancy, Francia and Repsol YPF.
Motorways and
Roads:
Year 2013
Detail design of AVO tunnel under Kennedy (Road single-bore, length: 42 m). CHILE. Owner:
COSTANERA NORTE.
Years 2012 - 2013
Constructive Design. Maitenes-Confluencia. Road single-bore: T1 (447 m), T2 (989 m) and T3 (3.361 m)
CHILE. Owner: SACYR CHILE.
Cristina Menchero (October 2014). Page 1 of 3
Year 2011
Geological-geotechnical study for the Design and Construction Projects “Murcia NorthWest Arc”. Design
and Construction Projects for road section between Km 373 of A-30 Motorway and road C-415, in Murcia.
SPAIN. Owner: FULCRUM.
Year 2011
Tender design. Turn of Elorrio. Road double-bore tunnel of Gaiztelua I (594 m) and Gaiztelua II (1.141m).
SPAIN. Owner: FCC.
Conventional
Railways and
Underground
Metros:
Year 2012
Constructive Design. Tunnels of FEVE. Stretch of Llanes. Tunnel El Bolao (300 m), Rail single-bore.
SPAIN. Owner: AXIA.
Year 2012
Final design High Speed North-Northwest Corridor. High Speed railway Madrid-Galicia. Stretch: PradoPorto. Rail double-bore, Length: 7.606 m. SPAIN. Owner: COMSA/ALDESA/COPASA/AZVI/COPISA.
Años 2011 – 2012
Initial Design. Stretch 7. FF.CC. Las Palmas-Maspalomas. Tunnel of Maspalomas (3.000 m), Rail singlebore. SPAIN. Owner: PROINTEC/INGENIA.
Años 2011 – 2012
Initial Design. Stretch 4. FF.CC. Las Palmas-Maspalomas. Tunnel of El Goro (2.000+4.000 m), Rail
single-bore. SPAIN. Owner: EYSER/GETINSA/GIPIC.
Years 2010 – 2012
Feasibility. Atlantic High Speed Axis. Stretch: Vigo-O Porriño (length of the tunnel 10.000 m). Owner:
TRN.
Year 2011
Initial Design. High Speed railway to Galicia. Stretch: Ourense-Vigo. Stretch: Cerdedo-Barro. SPAIN.
Owner: UTE GOC-CALTER.
Year 2010
•
Tunnel: Os Campos. Rail single-bore. Length: 2.795 m.
•
Tunnel: O Galo. Rail single-bore. Length: 4.705 m.
•
Tunnel: Barro. Rail double-bore. Length: 7.792 m.
High Speed Railway Madrid-País Vasco/French line. Burgos-Vitoria. Stretch: Burgos-Prádanos de
Bureba. Tunnel of Fresno Rodilla (5.250 m), Rail single-bore. SPAIN. Owner: CYE.
Cristina Menchero (October 2014). Page 2 of 3
Hydraulic and
Hydropower
Projects:
Years 2012 – 2014
Constructive Design Majes-Siguas. Tunnel Transandino-Pucara (11.410 m. and 6.450 m). PERU. Owner:
COBRA-COSAPI.
Year 2013
Constructive Design CH Itata (length of the tunnel 410 m) CHILE. Owner: BROTEC
Years 2011 – 2012
Constructive Design CH La Virgen (length of the tunnel 4.600 m). PERU. Owner: COBRA-OSSA.
Years 2011 – 2012
Final Design Project for underground excavation at Peares III Hydroelectric Power Plant, Ourense (length
of the tunnel 410 m) SPAIN. Owner: SOCOIN.
Years 2011 – 2012
Final Design Project for underground excavation at Belesar III Hydroelectric Power Plant, Ourense
(length of the tunnel 1.650 m) SPAIN. Owner: SOCOIN.
Year 2010
Final Design Project for underground excavation at Edrada-San Esteban Hydroelectric Power Plant,
Ourense. (length of the tunnel 5.900 m) SPAIN. Owner: SOCOIN.
Year 2010
Constructive Design. Drainage system in Pozuelo de Alarcón (Madrid). Hydraulic tunnel of 4.572 m.
SPAIN. Owner: EUROCONSULT.
Mining Projects:
Year 2012
Iron mining project Tibirita (Cundimarca). COLOMBIA. Owner: PACIFIC IRON.
Year 2010
Prefeasibility Project of the interior mining ramp of Cobre las Cruces (length of the tunnel 13.200 m).
SPAIN. Owner: COBRE LAS CRUCES.
Tunnel Construction
Assessment:
Years 2013 – 2014
Assessment during construction CH Alto Maipo (length of the tunnel 22.000 m) CHILE. Owner:
CONSTRUCTORA NUEVO MAIPO.
Years 2013 – 2014
Assessment during construction Stage 1 Programe “Santiago Centro-Oriente” (length of the tunnel 580
m) CHILE. Owner: COSTANERA NORTE.
Years 2011 – 2014
Assessment during construction CH Cheves (length of the tunnel 15.776 m). PERU. Owner:
CONSTRUCTORA CHEVES.
Year 2011
Tunnel design for the mineral conveyor belt instalation from the primary crusher to treatment plant.
Toquepala Deposit (length of the tunnel 2.027 m). PERU. Owner: OSSA
Cristina Menchero (October 2014). Page 3 of 3