FIGURE 4 - Klondex Mines Ltd.

Fire Creek UG Drill Results - FIGURE 4
Modeled Vein
FCU-0657
24.2’ @ 0.522 opt Au
Including 1.0’ @ 5.163 opt Au
Vein Extension
Inferred Vein Extension
Drill Hole showing
Intercepts > 0.1 opt Au
New Drill Hole Intercept
(drilled thickness)
FCU-0661
1.0’ @ 5.82 opt Au
N
FCU-0670
14.6’ @ 0.485 opt Au
Including 2.5’ @ 1.467 opt Au
FCU-0649
5.1’ @ 12.114 opt Au
Including 0.5’ @ 98.595 opt Au
2