Bitte beachten Sie die Technischen Richtlinien der LMS. Tor 10 | Gate 10 Tor 9 | Gate 9 Tor 8 | Gate 8 Tor 11 | Gate 11 Maximum building height without stand approval = 3,5m Please observe the technical guidelines included in our GEC. Tor 12 | Gate 12 EINGANG WEST ENTRANCE WEST maximum number of visitors = 9 100 pax 10.00 6G06 2.00 6G02 2.50 F 4.00 H Tor 7 | Gate 7 | max. building height = 3,5m 6.00 | Legend of changes: 4.00 Index | max. building height = 5m 10.00 | max. building height = 5m 6F19 4.00 Wasserentnahme A=8,59qm 2.00 6F02 9.50 11.00 5.00 8.00 7.00 3.00 2.00 4.00 5.00 6D01 Legende | Legend WC Herren WC 5.00 2.00 4.00 A=20,70qm Hallenmeister A=15,20qm 6C25 6D18 6C21 4.00 6D14 Putzraum 6D52 6C51 4.00 6C59 8.00 8.00 5.00 6B81 6.00 6C776.00 6D44 6C43 5.00 4.00 9.00 6C15 6C57 6C09 4.00 6C53 6C49 6C45 6C41 6C31 8.00 12.00 Vorraum WC Damen A=16,11qm 5.00 5.00 5.00 6D30 10.00 F 6D36 6C05 10.00 10.00 10.00 A=16,11qm WC Vorraum WC Herren A=11,47qm Flur Elektroraum A=12,25qm A=5,56qm 6C01 5.00 A=5,57qm H Wickelraum A=5,57qm 6D08 6.00 A=2,94qm Beh.WC Herren 6D42 6D40 10.00 10.00 10.00 Pers. WC A=4,00qm 6D50 6D48 5.00 4.00 6D54 4.00 5.00 Wasserentnahme 9.00 A=37,46qm Vorraum WC Herren 6D58 5.00 Flur WC 15.00 6C61 3.50 6D70 5.00 5.00 6C796.00 A=4,85qm F 6.00 Office Hall manager max.H= 4,00m / max. building height A=12,06qm 5.00 Beh.WC Herren Vorraum WC Damen A=5,56qm A=11,47qm WC | Column ROTHAUSPARK 3.00 5.00 5.00 A=23 qm 6.3 6D09 H = 9,50m / Lower 4.00 edge of lamps H=9,50m UK 6D35 edge of hall signs H=7,70m Hallenschilder H = 7,70m / Lower 4.00 A=23 qm 6.4 Besprechungsraum 6.3 9.00 3.00 10.00 10.00 6D17 4.00 5.00 8.00 8.00 6D11 Besprechungsraum 6.4 m 6D31 6D15 6D05 ,50 UK 6D43 Lampen 6D45 10.00 10.00 6D21 5.00 5.00 6D25 6F08 5.00 7.00 5.00 6D416.00 6F16 4.00 6F30 6F20 =2 9.00 6F36 6F24 | Fire extinguisher | Ventilation outlet Notausgang | Emergency exit 10.00 10.00 6B09 10.00 10.00 7.00 7.00 2.00 8.00 A=23 qm 6.2 Besprechungsraum 6.1 7.00 7.00 | Channel system with utility for: - Wasserzulauf / Wasserablauf | Water supply - Elektroversorgung | Power supply | Data connections - Gas - Sprinklerbodenzulauf | Ground sprinkler supply Besprechungsraum 6.2 6B01 A=51,17qm Lager A=23,43qm 6.00 6B17 6B05 6.00 6B08 6.00 Imbiss Gastraum 5.00 13.00 Bistro 6C12 6.00 10.00 6B61 WC Damen WC 6C02 7.00 10.00 Vorbereitung / Ausgabe A=26,66qm 10.00 4.00 9.00 4.00 Flur 6B21 12.00 9.00 6B25 7.00 6B33 10.00 A=3,47qm A=6,13qm 6B41 4.00 Vorraum A=3,52qm 19.00 6B51 4.00 6C60 m 6C64 3.00 10.00 9.00 6B67 ,50 8.00 =2 6B75 A=25,15qm | base d=0,99m Handfeuermelder | Emergency button x.H WC Damen WC A=22,36qm | base d=1,09m | Column 2 Hydrant | Hydrant 8.00 ma WC Herren WC A=1,68qm | Column 1 | Column base 1&2 h=0,09m 4.00 Pers. | Changes: x.H 6.00 3.00 6F40 6D47 6F44 A=8,83qm 5.00 6F42 6.00 6.00 6F46 17.00 17.00 6D61 6.00 6.00 11.00 6D59 6D53 Bearbeiter | Editor M ma 6D71 Hallenmeister M 17.00 6F05 10.00 15.00 6F15 6F60 6D77 8.00 8.00 6F21 | max. building height = 5m 6G18 6.00 6F80 Bk 6G20 3.00 6G24 10.00 6F70 5.00 A=166,25qm Lager MobilImbiss 12.00 6F31 10.00 | max. building height = 5m 4.00 Leergutlager TRH 10.00 6F41 7.00 7.00 7.00 6.00 20.00 6F47 3.00 10.00 6F61 | max. building height = 5m 4.00 F 7.00 7.00 5.00 6G80 6F67 3.00 6F77 M 6F716.00 10.00 10.00 HALLE 8 A=13,45qm 3.50 6G126.00 F F 3.00 H 4.00 7.00 3.00 F F 3.50 6G23 3.50 3.00 6G316.00 H 3.00 10.00 6G43 H 6G516.00 F F H 11.00 6G63 3.00 Subject for official approval 6G71 F F A=23 qm 6.1 10.00 Elektroanschluss | Electr. connection A=12,49qm 6A256.00 6A376.00 | max. building height = 5m 4.00 6A21 6A19 6A316.00 6A09 6A116.00 A=6,51qm A=5,96qm Schukosteckdose | Safety triple outlet 3-fach, abschaltbar | can be switched off 6A05 Wasser/Abwasser | Water/Waste water | max. building height = 5m | max. building height = 5m 7.00 7.00 6A41 8.00 8.00 6A456.00 5.00 5.00 | max. building height = 5m 8.00 5.00 6A65 8.00 5.00 6.00 4.00 5.00 6A69 3.00 6A71 6A51 5.00 5.00 5.00 | max. building height = 5m 9.00 9.00 3.00 Tor 6 | Gate 6 6A57 | Position of supports 8.00 8.00 5.00 6A61 5.00 10.00 Lager Information H 6B66 M Lager Putzmittel | Suspension points max. Belastung pro Punkt = 1 kN (100kg) lotrecht max. load per point = 1 kN (100kg) vertikal | max. building height = 3,5m 6A80 9.00 3.00 5.00 12.50 M 5.00 6A02 | Area available for allocation 7.00 Tor 5 | Gate 5 9.00 14.00 Tor 4 | Gate 4 6.00 Tor 3 | Gate 3 6A26 5.50 6A22 H 6A10 F F 5.00 6.00 Tor 2 | Gate 2 6.00 6A30 F F 6A06 3.00 H 3.00 F F 3.00 H 5.00 H F 4.00 6A64 4.00 6A68 5.00 3.00 6A42 10.00 H F F | Special area 3.00 Tor 1 | Gate 1 EINGANG OST ENTRANCE EAST Halle | Hall: Oskar-Lapp-Halle 6 zur Halle 4 to Hall 4 | scale Stand: 14.10.2016 - 11:30 ohne Datum | date 17.10.2016 Papier | paper A3 File LogiMAT_2017_Halle6 Veranstaltung | event LogiMAT 2017 | hall overview Zeichner | Drawer TVB
© Copyright 2024 ExpyDoc