供給約款変更届出書

14
2
28
28
9
17
28
MJ
m3)
3
20
100
3
20
3
300
300
3
)
113.04
)
822.85
)
98.89
)
2,034.51
)
86.77
)
5,626.28
)
74.80
)
3
100
3
540.00
3
MJ
m3)
3
20
100
28
10
1
3
20
100
3
300
300
3
3
540.00
)
112.47
)
822.85
)
98.32
)
2,034.51
)
86.20
5,626.28
)
74.23
3
3
(
)
)
101.03
100.50
0.52%
93.97
93.47
0.53%
18,180
/t
34,420
/t
H24
H28
11
19
9
LNG
LNG
3
2,224,218
22,131
3
100.50
2,224,218
2,165
11,347
13,512
13,512
13,512
5,238
18,750
28
10
29
9
13,512
14
13,512
11,701)
2,570,411
(2,235,919)
2,556,899
(2,224,218)
3
27,354
(22,131)
/t
a
a×b=c
/t
H28
H28
10
p=
(p×c)
33,420
33,420
1.0000
1.0440
0.3200
0.6800
0.3200
0.7099
34,420