Technical Board: Members: Mike Harrison , Chair (BNL) Hitoshi Hayano, Deputy (KEK) Akira Yamamoto (KEK) Nobuhiro Terunuma (KEK) Yasuchika Yamamoto (KEK) Nick Walker (DESY) Olivier Napoli (CEA) Marc Ross (SLAC) Nikolay Solyak (Fermilab) • Fuze: 毎週火曜日22:00〜23:00、臨時:LCWSなど – 2013年〜今までに28回開催 – 各review, workshop, FALCなどの報告 – 各国の状況(日本の有識者会議,…) – X-FEL, LCLS-II, STF, ATF,… の進捗状況 – LCWSの概案 Change Management Board • メンバー – Mike Harrison (chair) and TB members, – Vic Kuchler (CFS), – Benno List (EDMS, minutes), – Jenny List (ILD), Tom Markiewicz (SiD) • 昨年9月より、月1回のペース、今までに8回開催 • EDMS Change Request Received # Title status ILC-CR-0001 Insertion of a dogleg in the electron side Rejected by LCC (scope of design change beyond 1TeV ) ILC-CR-0002 Baseline optics to provide for a single L* CRP Approved implementation stage ILC-CR-0003 Detector hall with vertical shaft access CRP Approved implementation stage ILC-CR-0004 Extension of the Mina Linac tunnel CRP: preparing report ILC-CR-0005 Upgrade of published ILC top-level luminosity parameters (error in the 1 TeV upgrade parameter set) Approved implementation stage ILC-CR-0006 Adding a stripline BPM downstream of QD0 Approved implementation with ILC-CR-0002 ILC-CR-0007 Adoption of the Asian design as sole baseline ? ?
© Copyright 2024 ExpyDoc